ML11277A012

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Volume I
ML11277A012
Person / Time
Site: Fermi 
Issue date: 09/20/2011
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11277A012 (8)


Text

DET)Ig.IT EbISON -

FERMI 2

AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 09/20/11 To: 00935 US NRC DOCUMENT CNTRL DESK WASHINGTON, DC 20555 PAGE 1

Media:

8 1/2 X 11 DTC Doc.

Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status 102 1

IR 09/20/11 AFC TMTRM TRM VOL I Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.

(734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 400/

40/

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 102 dated 09/20/11 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 101 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Paue Rev 101 04/29/11 Title Page Rev 102 09/20/11 Immediately following Title Page List of Effective Pages LEP-1 through LEP-4 Rev 101 04/29/11 List of Effective Pages LEP-1 through LEP-4 Rev 102 09/20/11 Fire Detection Instrumentation Table TR3.12.1-1, Rev 99 (1 Dage: 3.12-4)

Table TR3.12.1-1, Rev 102 (1 page: 3.12-4)

END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM

[File: 1754

[DSN: TRMVOLI I Rev:102 Date 09/20/2011 Recipient qa6-

FER*

2- -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 99 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 100 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3-0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM-3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3--9B-Revision 31 TRM 3.3-c Revision-31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-11 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59-TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision-31 TRM 3.42-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3-.3-7 Revi-sion 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9

-Revision 31 TRM 3.4-8 Revision 31 TRM--3.3--10 Revis-ion 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 3 TRM 3.4-10 Revis-ion 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3-3-13 Revision 74 TRM 3.6-a-Revision 70 TRK-3.3-13a Revision6-7 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision-67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3-6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3-.3-21 Revision 59 TRM 3-6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 102 09/20/11

FERMAC 2 TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.6-19 3.6-20 3.6-21 3.6-22 3.6-23 3.6-24 3.6-25 3.6-26 3.6-27 3.6-28 3.6-29 3.6-30 3.6-31 3.6-32 3.6-33 3.6-34 3.6-35 3.7-a 3.7-b 3-7-1 3.7-2 3.7-3 3.7-4 3.7-5 3.7-6 3.7-7 3.7-8 3.7-9 3.7-10 3.7-11 3.7-12 3.7-13 3.7-14 3.7-15 3.7-16 3.7-17 3.7--18 3.7-19 3.7-2-0 3.8-a 3.8-1 3.8-2 3.8-3 3.8-4 3.8-5 3.8-6 3.8-7 3.8-8 3.8-9 3.8-10 3.8-11 3.8-12 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision

-Revision Revi-s-ion Revision Revision Revision

-Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Page 31 31 31 31 31 58 31 31 31 31 31 31 31 70 31 31 31 73 31 60.

70 70 73 31 31 31 31 31 44 31 72 31 31

-98 31 31 77 31 79 31 31 31 96 96 31 50 50

.50 50 50 50 31 TRM 3.8-13 TRM 3.8-14 TRM 3.8-15 TRM 3.8-16 TRM 3.8-17 TRM 3.8-18 TRM 3.9-a TRM 3.9-1 TRM 3.9-2 TRM 3.9-3 TRM 3.9-4 TRM 3.9-5 TRM 3.10-1 TRM 3.11-a TRM 3.11-1 TRM-3.12 --a TRM-3 1 TRM 3.12 - 2 TRM 3.12-3 TRM 3. 12 T-_M--3.12-5 TRM 3.122-6 TRM 3.12-7 TRM 3..12-8 TRM -3. 9 TERM 3.12-10 TRM 3.12-I1 TRM 3.12-12 TRM 3.12-13 TRM 3.12-14 TRM 3.12-15 TRM 3.12-16 TRM 3.12-17 TRM-3..12-18 TRM 3.12-19 TRM 3-. 12-20 TRM 3.12-21 TRM 3.12-22 TRM 3.1-2--23 TRM 3.12-24 TRM 3.12-25 TRM 3.12-26

-TRM 3.12-27 TRM 3.12-28 TRM 3.12-29 TRM 3.12-30 TRM 4.0-1 TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM 5.0-3 TRM 5.0-4 Revision 61 Revision 46 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 43 33 31 31 65 80 88 31 31 31 31 31 75 31 31 1.02 53 53 31 57 40 31 49 31 75 31 31 7 31 75 31 75 31 31 31 31 31 75 31 31 78 31 31 99 99 99 99 99 TRM Vol.

I LEP-2 REV 102 09/20/11

FERMI 2

-' TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TPRIM-TRM TRM TRM TRM TRM TRM TRM-

-TR!M TRM TRIM TRM TRM TRM TRM TRIM TRIM TRIM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-5 5.0-6 5.0-7 5.0-8 B1.0-1 B2.0-1 B3.0-1 B3.0-2 B3. 0-2a B3. 0-2b B3. 0-2c B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3.1-1 B3.3.1-2 B3.3.2-1 B-3.3.2-2 B3.3. 3-1 B3.3. 4-1 B3.3.4-2 B3.3. 5-1 B3.3. 5-2 B3.3. 6-i B3.3. 6-2 B3.3. 6-3 B3.3.6-4 B3.3.6-5

-B3.3.6-6 B3.3._7 - 1 B3.3-. 7-2 B3.3. 8-1 B3.3. 9-1 B3.3.1 0-1 B3.3. 11-1 B3.3. 12-1 B3.3. 13-1 B3.3.14-1 B3.4.1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revi-sion Revision Revision Revision Revision Revision Revision-Revision Revi-sion-Revision Revision Revision

-Revision Revision Revision Revision-Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 99 99 99 99 31 31 63 63 72 72 72 31 31 54 72 72 31 31 31 31 31 31 67 31 84 31 31

-31 3T1 31 31 76 76 31 31 31 31 56 45 62 31 31 31-71 71 71 71 31 31 31 31 31 Page Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRY TRM TRM TRM TRM TRM TRM TRM TRM TRM TERM TRM TRM TRM TRM TRM TRM B3.4.7-1 B3.5-1 B3.6.1-1 B3.6.2-1 B3.6.3-1 B3.6.4-1 B3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 R3.7.5-1 B3 -7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3-.8.4-I B3.8.5-1 B3.8-.-6-1 B3 9. 1-1 B3.9.2-1 U3.9.3 - 1 B3.9.4-1 B3. 10-1

-B3. 11. 1-1 B3.12.1-1 B3.12.2-1 B3.12-3-1 B3.12.4-L B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revi-sion

-Revision Revision

-R-evision Revisi-on,

-Revision Revi-si-ar-Revision

-Revision Revision Revision Revision Revision Revision Revision Revi-sion Revision Revision

-Revision Revision Revision Revision Revision-Revision Revision 31 31 31 67 87 31 31 70 31 31 31 31 73 31 31 31 31 99 31

-79 31 31 96 31 31 43 31 65 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol.

I LEP-3 REV 102 09/20/11

FERW-2

-w TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 15, Revision 1 Page Revision Notation Page 1

1 2

1 3

1 4

1 5

1 6

1 7

1 8

1 9

1 10 1

11 1

12 1

13 1

14 1

15 1

16 1

17 1

18 1

19 1

20 1

21 1

22 1

23 1

24 1

TRM Vol.

I LEP-4 REV 102 09/20/11

Fire Detection Instrumentation TR 3.12.1 TABLE TR3.12.1-1 (Page 1 of 3)

Fire Detection Instrumentation FIRE TOTAL NUMBER OF INSTRUMENTS a)

DETECTION IONIZATION PHOTOELECTRIC THERMAL INFRARED P'UNCTION ZONE (X/Y)

(X/Y)

(X/Y)

(X/Y)

1.

Reactor Building(b)

a.

Torus area

b.

NW corner rooms RHR pump

c.

SW corner rooms RHR pump

d.

SE corner rooms CRD HPCI

e.

NE corner rooms RCIC

f.

First floor

g.

EECW system area second-floor

h.

Third floor

i.

Fourth floor

j.

Refueling area, fifth floor

2.

Auxiliary Building 1

3 4

5 7

10 15 17 17 8/0 4/0 4/0 9/0 5/0 31/0 21/0 23-10 21/0 / 2/0.

1/0 10/0

a.

-Basement N control air equipment

-b-.

Corridors, 562 ft, 563 ft

c.

First floor mezzanine cable tray, 583 ft, 603 ft

d.

switchgear room, corridor area second floor

e.

Cable tunne-1 6

9 670 2/0 17/0 10/0 10/0

-2/-0 (continued)

(a)

(X/Y)

X is number of Function A instruments.

Y is number of Function B notification) instruments.

(early-warning fire detection and notification only)

(actuation of fire suppression system and early warning and (b)

The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

TRM Vol.

I TRM 3.12-4 REV 102 09/11