Letter Sequence Request |
---|
TAC:MD4434, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (Approved, Closed) |
|
|
Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML22101A0472022-04-0404 April 2022 Submittal of Application for the Renewal of National Pollutant Discharge Elimination System (NPDES) Permit NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes2021-03-31031 March 2021 License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2020-06-23023 June 2020 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0075, License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements2019-12-0606 December 2019 License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 NRC-19-0001, License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation2019-02-27027 February 2019 License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2019-02-0808 February 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.2017-10-0909 October 2017 License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-08-31031 August 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17237A1762017-08-24024 August 2017 License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1 Isolation Functions NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-08-15015 August 2017 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 NRC-17-0044, License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications2017-08-14014 August 2017 License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications NRC-17-0025, License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink2017-07-17017 July 2017 License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink NRC-17-0010, License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation2017-02-23023 February 2017 License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals2016-03-22022 March 2016 License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals NRC-15-0081, License Renewal Application Update for the Boraflex Monitoring Program2015-09-24024 September 2015 License Renewal Application Update for the Boraflex Monitoring Program NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-09-24024 September 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC-15-0067, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 352015-06-18018 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 NRC-15-0062, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 342015-06-0909 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 NRC-15-0044, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 312015-04-27027 April 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 NRC-15-0030, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 222015-03-19019 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 NRC-15-0028, Revision to Response to License Renewal Environmental RAI SSSH-12015-02-18018 February 2015 Revision to Response to License Renewal Environmental RAI SSSH-1 NRC-15-0021, License Renewal Application - Response to LR-ISG-2013-012015-02-0505 February 2015 License Renewal Application - Response to LR-ISG-2013-01 NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan2014-10-21021 October 2014 License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan ML14121A5362014-04-24024 April 2014 Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 ML14121A5352014-04-24024 April 2014 Fermi 2, License Renewal Application, Cover Through Page 3.3-1 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-13-0012, License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2013-04-17017 April 2013 License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles2013-01-11011 January 2013 Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0087, License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company2012-12-21021 December 2012 License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company NRC-12-0083, License Amendment Request to Change Licensee Name on the Operating License2012-12-21021 December 2012 License Amendment Request to Change Licensee Name on the Operating License NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report 2023-09-28
[Table view] Category:Technical Specifications
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML16270A5312016-12-15015 December 2016 Fermi, Unit 2, Preoperational Test, Startup Tests and Other Items ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML16039A1212016-02-18018 February 2016 Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) NRC-14-0049, Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-06-19019 June 2014 Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2012-11-13013 November 2012 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.22012-01-10010 January 2012 Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 NRC-12-0004, Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves2012-01-10010 January 2012 Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1013408512010-05-14014 May 2010 Revised Clean TS Pages NRC-10-0003, Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.62010-01-0404 January 2010 Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification NRC-08-0061, Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification2008-09-12012 September 2008 Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification ML0812808342008-06-25025 June 2008 Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0807900262008-03-17017 March 2008 Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements NRC-08-0001, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0721404442007-08-0101 August 2007 Tech Spec Pages for Amendment Consolidated Line Item Improvement Process (Cllip) for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation (LCO) 30.9 Regarding the Unavailability of Barriers ML0721407632007-08-0101 August 2007 Technical Specification 3.8.1 Extension of the Completion Time for an Inoperable Diesel Generator Amendment ML0715002322007-04-12012 April 2007 Technical Specifications, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-07-0012, Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements2007-03-19019 March 2007 Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements NRC-07-0001, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2007-01-26026 January 2007 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0622004402006-08-0707 August 2006 Technical Specifications, Changes to Address Issues Related to an Inconsistency That Was Inadvertently Introduced During Conversion to Improved TSs When 1 Per Room Replaced 2 as the Required Channels Per Trip System NRC-06-0044, Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation2006-07-12012 July 2006 Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation NRC-06-0040, Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator2006-07-12012 July 2006 Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator ML0604800392006-02-15015 February 2006 Tech Spec Pages for Amendment 172 Regarding Consolidated Line Item Improvement for Snubbers ML0603704972006-02-0606 February 2006 Tech Spec Pages for Amendment 171 Allowed Outage Time Extension for Emergency Diesel Generator 12 for One Specific Incident 2023-09-18
[Table view] |
Text
Donald K. Cobb Assistant Vice President, Nuclear Generation Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Tel: 734.586.5201 Fax: 734.586.4172 DTE Energy*
10 CFR 50.90 January 26, 2007 NRC-07-0001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 Docket No. 50-341 License No. NPF-43
Subject:
Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), Detroit Edison is submitting a request for an amendment to the Technical Specifications (TS) for Fermi 2.
The proposed amendment would revise TS requirements for unavailable barriers by adding LCO 3.0.9. This LCO establishes conditions under which TS systems would remain operable when required physical barriers are not capable of providing their related support function. Additionally, editorial changes are proposed to LCO 3.0.8 to be consistent with the terminology proposed in LCO 3.0.9. provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment 2 provides the existing TS pages marked up to show the proposed change. Attachment 3 provides revised (clean) TS pages. Attachment 4 provides a summary of the regulatory commitments made in this submittal and Attachment 5 provides the existing TS Bases pages marked up to show the corresponding change (for information only).
USNRC NRC-07-0001 Page 2 Detroit Edison requests approval of the proposed License Amendment by July 13, 2007, with the amendment being implemented within 60 days thereafter.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Michigan State Official.
If you have any questions or require additional information, please contact Mr.
Ronald W. Gaston, Nuclear Licensing Manager, at (734) 586-5197.
Sincerely, Attachments:
- 1. Description and Assessment
- 2. Proposed Technical Specification Change
- 3. Revised Technical Specification Pages
- 4. Regulatory Commitments
- 5. Proposed Technical Specification Bases Change (for information only) cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region III Regional Administrator, Region HI Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-07-0001 Page 3 I, Donald K. Cobb, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
DONALD K. COBB Assistant Vice President - Nuclear Generation On this day of M2r007 before me personally appeared Donald K. Cobb, being fr t duly swog and says that he executed the foregoing as his free act and deed.
otary Public rM PUBLIC MONROE CO, MI AOThRY WYOMM4ISSION EXPIRES Call,.2W0
ATTACHMENT 1 TO NRC-07-0001 DESCRIPTION AND ASSESSMENT
Attachment 1 to NRC-07-0001 Page 1
1.0 DESCRIPTION
The proposed amendment would modify Technical Specifications (TS) requirements for unavailable barriers by adding LCO 3.0.9.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) STS change TSTF-427 Revision 2. The availability of this TS improvement was published in the Federal Register on October 3, 2006 (71 FR 58444) as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation Detroit Edison has reviewed the safety evaluation dated October 3, 2006 (71 FR 58444) as part of the CLIIP. This review included a review of the NRC staff's evaluation, as well as the supporting information provided to support TSTF-427. Detroit Edison has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to Fermi 2 and justify this amendment for the incorporation of the changes to the Fermi 2 TS.
2.2 Optional Changes and Variations Detroit Edison is not proposing any technical variations or deviations from the TS changes described in the TSTF-427 Revision 2 or the NRC staff's model safety evaluation dated October 3, 2006 (71 FR 58444). However, one editorial variation incorporated in the proposed TS change replaces all occurrences of the term "train" in the proposed LCO 3.0.9 in TSTF-427 Revision 2, with the term "division" to be consistent with the Fermi 2 TS definition of "OPERABLE - OPERABILITY" and the terminology used in Section 1.3, "Completion Times,"
of the Fermi 2 TS.
In addition, a similar change to replace the term "train" with the term "division" is proposed for LCO 3.0.8. LCO 3.0.8 was added to the Fermi 2 TS per License Amendment 172 approved on March 16, 2006.
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination Detroit Edison has reviewed the proposed No Significant Hazards Consideration Determination (NSHCD) published in the Federal Register as part of the CLIIP. Detroit Edison has concluded
q Attachment 1 to NRC-07-0001 Page 2 that the proposed NSHCD presented in the Federal Register notice is applicable to Fermi 2 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).
3.2 Verification and Commitments As discussed in the notice of availability published in the Federal Register on October 3, 2006 (71 FR 58444) for this TS improvement, plant-specific verifications were performed as follows:
- 1. Detroit Edison commits to the guidance of NUMARC 93-01 Section 11, which provides guidance and details on the assessment and management of risk during maintenance.
- 2. Detroit Edison will revise procedures to ensure that the risk assessment and management process described in NEI 04-08 is used whenever a barrier is considered unavailable and the requirements of LCO 3.0.9 are to be applied, in accordance with an overall Configuration Risk Management Program (CRMP) to ensure that potentially risk significant configurations resulting from maintenance and other operational activities are identified and avoided.
4.0 ENVIRONMENTAL EVALUATION Detroit Edison has reviewed the environmental evaluation included in the model safety evaluation dated October 3, 2006 (71 FR 58444) as part of the CLIIP. Detroit Edison has concluded that the staff's findings presented in that evaluation are applicable to Fermi 2 and the evaluation is hereby incorporated by reference for this application.
ATTACHMENT 2 TO NRC-07-0001 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
Pages 3.0-1 and 3.0-3 (plus Insert 1, 1 page)
I LCO Appl i cabi l i ty 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applica"lias provided in LCO 3.0.2, LCO 3.0.7, LC-3.0.8'1 7 ayJ L-- I LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in.LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to
) place the unit, as applicable, in:
- a. MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b. MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c. MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifi cati ons.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
)
(continued)
ýr-n T rLKMI - UNIT 11 T r-,
2 3 .00-I1 Amendment No. L4Z, 1 /2
LC0 Applicability 3.0 3.0 LC0 APPLICABILITY LC0 3.0.6 When a support system's Required Action directs a supported (continued) system to be declared inoperable or directs entry into Conditions and Required Actions fora, supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCD 3.0.2.
LCD 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCD is desired to be met but is not met, the ACTIONS of the Special Operations LCD shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCD 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LC0(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are asso ted with only one raii or subsystem of a multiple train subsystem supported system or are associae with a single a or subsystem supported system and re able to per form their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated su ort function(s) are associated with more than one train or subsystem of a multiple rai -r subsystem supported system and are able-to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
)
C'?E"DLT I L-1\iIJ.
- 11KTT UII+/-I
~LI 3n- Ame nment No. YU'49 172 to NRC-07-0001 INSERT 1 LCO 3.0.9 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one division or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one division or subsystem of a multiple division or subsystem supported system provided at least one division or subsystem of the supported system is OPERABLE and the barriers supporting each of these divisions or subsystems provide their related support function(s) for different categories of initiating events.
For the purposes of this specification, the High Pressure Coolant Injection (HPCI) system, the Reactor Core Isolation Cooling (RCIC) system, and the Automatic Depressurization System (ADS) are considered independent subsystems of a single system.
If the required OPERABLE division or subsystem becomes inoperable while this specification is in use, it must be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the provisions of this specification cannot be applied to the divisions or subsystems supported by the barriers that cannot perform their related support function(s).
At the end of the specified period, the required barriers must be able to perform their related support function(s) or the supported system LCO(s) shall be declared not met.
ATTACHMENT 3 TO NRC-07-0001 PROPOSED TECHNICAL SPECIFICATIONS PAGES Pages 3.0-1, 3.0-3 and 3.0-3a
I LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b. MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c. MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Speci fi cations.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
(continued)
FERMI - UNIT 2 3.0-1 Amendment No. A14, VP7
i LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.6 When a support system's Required Action directs a supported (continued) system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are associated with only one division or subsystem of a multiple division or subsystem supported system or are associated with a single division or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated support function(s) are associated with more than one division or subsystem of a multiple division or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
At the end of the specified period, the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
(continued)
FERMI - UNIT 2 3.0-3 Amendment No. W, ViZl
LCO Appl i cabi I i ty 3.0 3.0 [CO APPLICABILITY LCO 3.0.9 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one division or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one division or subsystem of a multiple division or subsystem supported system provided at least one division or subsystem of the supported system is OPERABLE and the barriers supporting each of these divisions or subsystems provide their related support function(s) for different categories of initiating events.
For the purposes of this specification, the High Pressure Coolant Injection (HPCI) system, the Reactor Core Isolation Cooling (RCIC) system, and the Automatic Depressurization System (ADS) are considered independent subsystems of a single system.
If the required OPERABLE division or subsystem becomes inoperable while this specification is in use, it must be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the provisions of this specification cannot be applied to the divisions or subsystems supported by the barriers that cannot perform their related support function(s).
At the end of the specified period, the required barriers must be able to perform their related support function(s) or the supported system LCO(s) shall be declared not met.
FERMI - UNIT 2 3.0-3a Amendment No.
ATTACHMENT 4 TO NRC-07-0001 LIST OF REGULATORY COMMITMENTS to NRC-07-0001 Page 1 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Detroit Edison in this document.
Any other statements in this submittal are provided for information purpose and are not considered to be regulatory commitments. Please direct questions regarding these commitments to Ronald W. Gaston, Manager, Nuclear Licensing at (734) 586-5197.
REGULATORY COMMITMENTS DUE DATE / EVENT
- 1. Detroit Edison commits to the To be implemented concurrently with guidance of NUMARC 93- 01, implementation of the associated Revision 2, Section 11, which Approved License Amendment.
provides guidance and details on the assessment and management of risk during maintenance.
- 2. Detroit Edison commits to the To be implemented concurrently with guidance of NEI 04-08, implementation of the associated "Allowance for Non Technical Approved License Amendment.
Specification Barrier Degradation on Supported System OPERABILITY (TSTF-427)
Industry Implementation Guidance," March 2006.
Note: Detroit Edison already has a TS Bases Control Program consistent with the standard TS (STS) for General Electric (GE) Boiling Water Reactor (BWR) 4, as described in Section 5.5.10 of the Fermi 2 Technical Specifications.
ATTACHMENT 5 TO NRC-07-0001 PROPOSED CHANGES TO TECHNICAL SPECIFICATION BASES PAGES Pages B 3.0-1, B 3.0-10 and 3.0-10a (plus Insert 2, 3 pages)
LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3-0 ish the general requirements applicable all Specifications and apply at all times, unless otherwise stated.
LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).
LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered. The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:
- a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
- b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.
There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the FERMI - UNIT 2 B 3.0-1 Revision 36
LCO Applicability B 3.0 BASES LCO 3.0.7 (continued)
Applicability (i.e., shouldthe requirements of this other LCO not be met, the ACTIONS of the Special Operations LCO apply, not the ACTIONS of the other LCO). However, there are instances where the Special Operations LCO ACTIONS may direct the other LCOs' ACTIONS be met. The Surveillances-of the other LCO are not required to be met, unless specified in the Special Operations LCO. If conditions exist such that the Applicability of any other LCO is met, all the other LCO's requirements (ACTIONS and SRs) are required to be met concurrent with the requirements of the Special Operations LCO.
LCO 3.0.8 LCO 3.0.8 establishes conditions under which systems are considered to remain capable of performing their intended safety function when associated snubbers are not capable of providing their associated support functions(s). This LCO states that the supported system is not considered to be inoperable solely due to one or more snubbers not capable of performing their associated support function(s). This is appropriate because a limited length of time is allowed for maintenance, testing, or repair of one or more snubbers not capable of performing their associated support function(s) and appropriate compensatory measures are specified-in the snubber requirements, which are located outside of the Technical Specifications (TS) under licensee control. The snubber requirements do not meet the criteria in 10 CFR 50.36(c)(2)(ii), and, as such, are appropriate for control by the licensee.
If the allowed time expires and the snubber(s) are unable to perform their associated support function(s), the affected supported system's LCO(s) must be declared not met and the Conditions LCO 3.0.2.* and Required Actions entered in accordance with LCO 3.0.8.a applies when ne or more snubbers are not capable oq oviding their ssociated supp function(s) to a single rain or subsystem f a tiple rai or subsystem supported sys em or to a sing train or su system supported system. LCO 3.0.8.a allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore the snubber(s) before declaring the supported system inoperable.
The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable based on the low probability of a seismic event concurrent with an event that would require operation of the supported system occurring FERMI UNIT 2 B 3.0-10 Revision 36
LCO Applicability B 3.0 BASES LCO 3.0.8 (continued) while the snubber(s) are not capable of performing their associated supoort function and due to the availability of the redundant train of the supported system.
LCO 3.0.8.b applies hen one or more snubbers are not capable of pro i 'n their associated support f ion(s) to more than one traDoV or subsystem of a multiple train or subsystem suppor e system. LCO 3.0.8.b allows ours to restore the snubber(s) before declaring the supported system inoperable. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable based on the low probability of a seismic event concurrent with an event that would require operation of the supported system occurring while the snubber(s) are not capable of performing their associated support function.
LCO 3.0.8 requires that risk be assessed and managed.
Industry and NRC guidance on the implementation of 10 CFR 50.65(a)(4) (the Maintenance Rule) does not address seismic risk. However, use of LCO 3.0.8 should be considered with respect to other plant maintenance activities, and integrated into the existing Maintenance Rule process to the extent possible so that maintenance on any unaffected(Trn or subsystem is properly controlled, and emergent issues are properly addressed. The risk assessment need not be quantified, but may be a qualitative awareness of the vulnerability of systems and components when one or more snubbers are not able to perform their associated support function.
FERMI - UNIT 2 B 3.0-10a Revision 36 to NRC-07-0001 INSERT 2 LCO 3.0.9 LCO 3.0.9 establishes conditions under which systems described in the Technical Specifications are considered to remain OPERABLE when required barriers are not capable of providing their related support function(s).
Barriers are doors, walls, floor plugs, curbs, hatches, installed structures or components, or other devices, not explicitly described in Technical Specifications, that support the performance of the safety function of systems described in the Technical Specifications. This LCO states that the supported system is not considered to be inoperable solely due to required barriers not capable of performing their related support function(s) under the described conditions. LCO 3.0.9 allows 30 days before declaring the supported system(s) inoperable and the LCO(s) associated with the supported system(s) not met. A maximum time is placed on each use of this allowance to ensure that as required barriers are found or are otherwise made unavailable, they are restored. However, the allowable duration may be less than the specified maximum time based on the risk assessment.
If the allowed time expires and the barriers are unable to perform their related support function(s), the supported system's LCO(s) must be declared not met and the Conditions and Required Actions entered in accordance with LCO 3.0.2.
This provision does not apply to barriers which support ventilation systems or to fire barriers. The Technical Specifications for ventilation systems provide specific Conditions for inoperable barriers.
Fire barriers are addressed by other regulatory requirements and associated plant programs. This provision does not apply to barriers which are not required to support system OPERABILITY (see NRC Regulatory Issue Summary 2001-09, "Control of Hazard Barriers,"
dated April 2, 2001).
The provisions of LCO 3.0.9 are justified because of the low risk associated with required barriers not being capable of performing their related support function. This provision is based on consideration of the following initiating event categories:
" Loss of coolant accidents;
" High energy line breaks;
" Feedwater line breaks;
" Internal flooding;
" Turbine missile ejection; and
" Tornado or high wind.
The risk impact of the barriers which cannot perform their related support function(s) must be addressed pursuant to the risk assessment and management provision of the Maintenance Rule, 10 CFR 50.65 (a)(4), and the associated implementation guidance, Regulatory Guide 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants." Regulatory Guide 1.182 endorses the guidance in Section 11 of NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." This guidance provides for the consideration of dynamic plant configuration issues, emergent conditions, and other aspects pertinent to plant operation with the barriers unable to perform their related support function(s). These considerations may result in risk management and other compensatory actions being required during the period that barriers are unable to perform their related support function(s).
LCO 3.0.9 may be applied to one or more divisions or subsystems of a system supported by barriers that Cannot provide their related support function(s), provided that risk is assessed and managed (including consideration of the effects on Large Early Release and from external events). If applied concurrently to more than one division or subsystem of a multiple division or subsystem supported system, the barriers supporting each of these divisions or subsystems must provide their related support function(s) for different categories of initiating events. For example, LCO 3.0.9 may be applied for up to 30 days for more than one division of a multiple division supported system if the affected barrier for one division protects against internal flooding and the affected barrier for the other division protects against tornado missiles. In this example, the affected barrier may be the same physical barrier but serve different protection functions for each division.
The High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems are single division systems for injecting makeup water into the reactor during an accident or transient event. The RCIC system is not a safety system, nor required to operate during a transient, therefore, it does not have to meet the single failure criterion. The HPCI system provides backup in case of a RCIC system failure. The Automatic Depressurization System (ADS) and low pressure Emergency Core Cooling System (ECCS) coolant to NRC-07-0001 INSERT 2 Page 3 injection provide the core cooling function in the event of failure of the HPCI system during an accident. Thus, for the purposes of LCO 3.0.9, the HPCI system, the RCIC system, and the ADS are considered independent subsystems of a single system and LCO 3.0.9 can be used on these single division systems in a manner similar to multiple division or subsystem systems.
If during the time that LCO 3.0.9 is being used, the required OPERABLE division or subsystem becomes inoperable, it must be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Otherwise, the division(s) or subsystem(s) supported by barriers that cannot perform their related support function(s) must be declared inoperable and the associated LCOs declared not met. This 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period provides time to respond to emergent conditions that would otherwise likely lead to entry into LCO 3.0.3 and a rapid plant shutdown, which is not justified given the low probability of an initiating event which would require the barrier(s) not capable of performing their related support function(s). During this 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, the plant risk associated with the existing conditions is assessed and managed in accordance with 10 CFR 50.65(a)(4).