AC Sources --Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
A.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG(s) are not inoperable due to common cause failure.
OR A.4.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE EDG(s).
AND A.5 Restore availability 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from of CTG 11-1.
discovery of Condition A concurrent with CTG 11-1 not available AND A.6 Restore both EDGs in 7 days*
the division to OPERABLE status.
AND 10 days from discovery of failure to meet LCO B. One or both EDGs in B.1 Restore both EDGs in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> both divisions one division to inoperable.
OPERABLE status.
C. One offsite circuit C.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
for OPERABLE offslte circuit.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND (continued)
I
- The 7 day allowed outage time of Technical Specification 3.8.1 Condition A. Required Action A.6. which was entered on January 30, 2006, at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />. may be extended one time by an additional 7 days to complete repair and testing of EDG 12.
FERMI - UNIT 2 3.8-2 Amendment No.
.444 j1%, 171