ML21230A259

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Vol. I
ML21230A259
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/29/2021
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21230A259 (8)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 07/29/21 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 20852 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status

====================================================================

TMTRM TRM VOL I 126 1 IR 07/29/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

=====---======----=----------======-=-=---=-=----===================

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: u33890

f LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I

  • Revision 126 dated 07/29/2021

~ediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 125 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front ofTRM Manual Title Page Rev 125 04/01/2021 Title Page Rev 126 07/29/2021 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 125 LEP-1 through LEP-4 Rev 126 07/29/2021 04/01/2021 .

B3.3 Instrumentation TRMB3.3.4-2 Rev 84 07/07 TRM B3.3.4-2 Rev 126 07/21 Note: The changes above reflect those justified and described in LCR# 21-006-TRM.

END i '

Fermi 2 Technical Requirements Manual Volume I DTE Electric ARMS - INFORMATION DTC: TMTRM File: 1754 DSN: TRM VOL I Date 07/29/2021 Reci ient

/

FERMI 2 - TECHNICAL REQUIRE1':IENTS MANUAL VOL I LIST OF EFFECTIVE PAGES e* Page TRM i Revision Revision 106 Page TRM 3.3-30 Revision Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 125 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-c Revision 106 TRM 3.3-48 Revision 125 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71

  • TRM 3.3-4 TRM 3.3-5 TRM 3.3-6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-10 Revision Revision Revision Revision Revision Revision Revision 31 31 12S 31 106 31 106 TRM 3.4-lb TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRM 3.4-S TRM 3.4-6 TRM 3.4-7 Revision Revision Revision Revision Revision Revision Revision 71 12S 12S 31 31 31 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-*13 Revision 74 TRM 3.4-10 Revision 12S TRM 3.3-13a Revision 12S TRM 3.S-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-1S Revision 31 TRM 3.6-1 Revision 12S TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-S Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-2S Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 12S TRM 3.6-13 Revision 123 TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 12S TRM 3.6-14a Revision 123 TRM Vol.. I LEP-1 REV 126 07/29/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

- Page TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 TRM 3.6-18 Revision Revision Revision Revision Revision 123 123 123 123 Page TRM 3.8-9 TRM 3.8-ld TRM 3.8-11 TRM 3.8-12 Revision Revision 125 Revision 125 Revision 123 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3. 6-20 Revision 123 TRM 3.8-14 Revision 125 TRM 3.6-21 Revision 123 TRM 3.8-15 Revision 31 TRM 3. 6-22 Revision 123 TRM 3 .'8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 'Revision 125 'i'RM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3--6-33 Revision 31 TRM 3.11-1 Revision 31.

TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102

  • TRM 3.7-3 TRM 3.7-4 TRM 3.7-5 TRM 3.7-6 TRM 3.7-7 TRM 3.7-8 TRM 3.7-9 Revision Revision Revision Revision Revision Revision Revision 70 73 31 31 31 31 31 TRM 3.12-5 TRM 3.12-6 TRM 3.12-7 TRM 3.12-8 TRM 3.12-9 TRM 3.12-10 TRM 3.12-11 Revision 108 Revision 53 Revision 31 Revision 112 Revision 40 Revision 31 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision *31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3. 7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 .TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3 .12-26 Revision 75 TRM 3.8-4 Revision 113 .TRM 3.12-27 Revision 3.1 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 31 TRM. 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 126 07/29/202i

<I FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Page Revision TRM 5.0-a Revision 105 TRM E3.4.6-1 Revision 31 TRM 5.0-1 Revision 119 TRM E3.4.7-1 Revision 31 TRM 5.0-2 Revision 105 TRM E3.5-1 Revision 31 TRM El.0-1 Revision 31 TRM E3.6.1-1 Revision 31 TRM E2.0-1 Revision 31 TRM E3.6.2-1 Revision 67 TRM E3.0-1 Revision 63 TRM E3.6.3-1 , Revision 87 TRM E3.0-2 Revision 63 TRM E3.6.4-1 Revision 31 TRM E3.0-2a Revision 72 TRM E3,6.5-1 Revision 31 TRM E3.0-2b Revision 72 TRM E3.6.6-1 Revision 70 TRM E3.0-2c Revision 72 TRM E3.6.7-1 Revision 31 TRM E3.0-3 Revision 31 TRM E3.6.8-1 Revision 31 TRM E3.0-4 Revision 31 TRM E3.7.1-1 Revision 31 TRM E3.0-5 Revision 54 TRM E3.7.2~1 Revision 107 TRM E3.0-6 Revision 72 TRM E3.7.3-1 Revision 73 TRM E3.0-7 Revision 72 TRM E3.7.4-1 Revision 31 TRM E3.1-1 Revision 31 TRM E3.7.4-2 Revision 31 TRM E3.2-1 Revision 31 TRM E3.7.5-1 Revision 31 TRM E3.3.1-1 Revision 31 TRM E3.7.6-1 Revision 31 TRM E3.3.1-2 Revision 31 TRM E3.7.7-1 Revision 99 TRM E3. 3 .. 2-1 Revision 31 TRM E3.7.8-1 Revision 31 TRM E3.3.2-2 Revision 31. TRM E3.7.9-1 Revision 79 TRM E3.3.3-1 Revision 67 TRM E3.8.1-1 Revision 31 TRM E3.3.4-1 Revision 31 TRM E3.8.2-1 Revision 31 TRM E3.3.4-2 Revision 126 TRM E3.8.3-1 Revision 96 TRM E3.3.5-1 Revision 31 TRM E3.8.4-1 Revision 31 TRM E3.3.5-2 ,Revision 31 TRM E3.8.5-1 Revision 31 TRM E3.3.6-1 Revision 116 TRM E3.8.6-1 Revision 125 TRM E3.3.6-2 Revision 31 TRM E3.9.1-1 Revision 31 TRM E3.3.6~3 Revision 31 TRM E3.9.2-1 Revision 65 TRM E3.3.6-4 Revision 31 TRM E3.9.3-1 Revision 31.

TRM E3.3.6-5 Revision 76 TRM E3.9.4-1 Revision 31 TRM E3.3.6-6 Revision 76 TRM E3.10-1 Revision 31 TRM E3.3.7-1 Revision 31 TRM E3.11.1-1 Revision 31 TRM E3.3.7-2 Revision 31 TRM E3.12.1-1 Revision 31 TRM E3.3.7-3 Revision 106 TRM E3.12.2-1 Revision 112 TRM E3.3.8-1 Revision 31 TRM E3.12.3-1 Revision 31 TRM E3.3.9-1 Revision 31 TRM E3.12.4-1 Revision 31 TRM E3.3.10-1 Revision 56 TRM E3.12.5-1 Revision 31 TRM E3.3.11-1 Revision 45 TRM E3.12.6-1 Revision 31 TRM E3.3.12-1 Revision 62 TRM E3 .12.. 7-1 Revision 31 TRM E3.3.13-1 Revision 31 TRM E3.12.8-1 Revision 118 TRM E3.3.14-1 Revision 31 TRM E3.4.1-1 Revision 31 TRM E3.4.1-2 Revision 71 TRM E3.4.1-3 Revision 71 TRM E3.4.1-4 Revision 71 TRM E3.4.1-5 Revision 71 TRM E3.4.2-1 Revision 31 TRM E3.4.3-1 Revision 31 TRM E3.4.4-1 Revision 31 TRM E3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 126 07/29/2021

~

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • CORE OPERATING LIMITS REPORT COLR 21, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0

19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 .o 30 0 31 0

  • TRM Vol.. I LEP-4 REV 126 07/29/2021.

TIP System TR B3.3.4.2

  • TR B3.3 INSTRUMENTATION TR B3.3.4.2 Traversing In-Core Probe (TIP) System BASES The OPERABILITY of the traversing in-core probe system with the specified minimum complement of equipment ensures that the measurements obtained from use of this equipment accurately represent the spatial neutron flux distribution of the reactor core.

The requirements for the OPERABILITY of the TIP System are as follows for the different applicabilities:

For recalibration of the LPRM detectors, OPERABILITY requires:

a. Movable detectors, drives and readout equipmernt to map the core, and
b. Indexing equipment to allow all OPERABLE detectors to be calibrated in a common location.
c. Valid data from at least 22 of 43 radial locations from OPERABLE detectors.

For monitoring the APLHGR, LHGR, or MCPR, OPERABILITY only requires OPERABLE detector(s) in the required measurement location(s).

The TIP system OPERABILITY is demonstrated by normalizing all OPERABLE probes (i.e., detectors) prior to performing an LPRM calibration function. Monitoring

  • core thermal limits may involve utilizing individual detectors to monitor selected areas of the reactor core, thus all detectors may not be required to be OPERABLE. The OPERABILITY of individual detectors to be used for monitoring is demonstrated by comparing the detectors(s) output with data obtained during the previous LPRM calibration .
  • TRM Vol. I TRM B3.3.4-2 Rev. 126 07/21