MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML16270A5312016-12-15015 December 2016 Fermi, Unit 2, Preoperational Test, Startup Tests and Other Items ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML16039A1212016-02-18018 February 2016 Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) NRC-14-0049, Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-06-19019 June 2014 Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2012-11-13013 November 2012 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.22012-01-10010 January 2012 Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 NRC-12-0004, Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves2012-01-10010 January 2012 Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1013408512010-05-14014 May 2010 Revised Clean TS Pages NRC-10-0003, Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.62010-01-0404 January 2010 Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification NRC-08-0061, Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification2008-09-12012 September 2008 Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification ML0812808342008-06-25025 June 2008 Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0807900262008-03-17017 March 2008 Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements NRC-08-0001, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0721404442007-08-0101 August 2007 Tech Spec Pages for Amendment Consolidated Line Item Improvement Process (Cllip) for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation (LCO) 30.9 Regarding the Unavailability of Barriers ML0721407632007-08-0101 August 2007 Technical Specification 3.8.1 Extension of the Completion Time for an Inoperable Diesel Generator Amendment ML0715002322007-04-12012 April 2007 Technical Specifications, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-07-0012, Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements2007-03-19019 March 2007 Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements NRC-07-0001, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2007-01-26026 January 2007 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0622004402006-08-0707 August 2006 Technical Specifications, Changes to Address Issues Related to an Inconsistency That Was Inadvertently Introduced During Conversion to Improved TSs When 1 Per Room Replaced 2 as the Required Channels Per Trip System NRC-06-0044, Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation2006-07-12012 July 2006 Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation NRC-06-0040, Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator2006-07-12012 July 2006 Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator ML0604800392006-02-15015 February 2006 Tech Spec Pages for Amendment 172 Regarding Consolidated Line Item Improvement for Snubbers ML0603704972006-02-0606 February 2006 Tech Spec Pages for Amendment 171 Allowed Outage Time Extension for Emergency Diesel Generator 12 for One Specific Incident 2023-09-18
[Table view] |
Text
AC Sources -- Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources--Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
- b. Two emergency diesel generators (EDGs) per division.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS ACTIONS------------------------------ NOTE .....................................
LCO 3.0.4.b is not applicable to EDGs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One EDG inoperable. A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for OPERABLE offsite circuit(s). AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of an by the inoperable inoperable EDG EDG, inoperable when concurrent with the redundant inoperability of required feature(s) redundant are inoperable. required feature(s)
AND A.3 Verify the status of Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> CTG 11-1.
AND (continued)
FERMI - UNIT 2 3.8-1. Amendment No. *4. /WI1 7 5
AC Sources -- Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.- (continued) A.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG(s) are not inoperable due to common cause failure.
OR A.4.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE EDG(s).
AND A.5 Restore availability 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from of CTG 11-1.. discovery of Condition A concurrent with CTG 11-1 not available AND A.6 Restore EDG to 14 days OPERABLE status.
B. Both EDGs in one B.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> division inoperable. for OPERABLE offsite circuit(s). AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND FERMI - UNIT 2 3.8-2 Amendment No. X3/ , ;_X, /t7,9 175
AC Sources--Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of by the inoperable the inoperable EDGs, inoperable when EDGs concurrent the redundant with required feature(s) inoperability are inoperable, of redundant required feature(s)
AND B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE EDG(s).
AND B.4 Restore one EDG in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
the division to OPERABLE status.
C. One or both EDGs in C.1 Restore both EDGs in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> both divisions one division to inoperable. OPERABLE status.
D. One offsite circuit D.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, for OPERABLE offsite circuit. AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND thereafter (continued)
ýFERMI - UNIT 2 3.8-2a Amendment No. /IjV 175
AC Sources -- Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) D.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power available inoperable to one division when the redundant concurrent with required feature(s) inoperability are inoperable, of redundant required feature(s)
AND D.3 Restore offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE status.
E. Two offsite circuits E.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable, feature(s) inoperable discovery of when the redundant Condition E required feature(s) concurrent with are inoperable. inoperability of redundant required feature(s)
AND E.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.
(continued)
FERMI - UNIT.2 3.8-2b Amendment No. /t,', 175
AC Sources---Operating 3.8.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. One offsite circuit - ------------ NOTE ------------
inoperable. Enter applicable Conditions and Required.Actions of AND LCO 3.8.7, "Distribution Systems - Operating," when One or both EDGs in Condition F is entered with one Division no AC power source to one or inoperable, more 4160 V buses 64B, 64C, 65E or 65F.
F.1 Restore offsite 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circuit to OPERABLE status.
OR F.2 Restore both EDGs in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the Division to OPERABLE status.
G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, C, D, E or F not AND met.
G.2 Be in'MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FERMI - UNIT .2 3.8-2c Amendment No.
175