ML101340851

From kanterella
Jump to navigation Jump to search

Revised Clean TS Pages
ML101340851
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/14/2010
From: Hassoun A
DTE Energy
To: Mahesh Chawla
Plant Licensing Branch III
Chawla M, NRR/DORL, 415-8371
References
Download: ML101340851 (3)


Text

From: Alan I Hassoun [hassouna@dteenergy.com]

Sent: Friday, May 14, 20105:09 PM To: Chawla, Mahesh

Subject:

Revised Clean TS Pages Attachments: Revised Clean TS page 3-7-6.pdf Per our discussion today, the proposed footnote on page 3.7-6 of the Tech Spec has been revised to indicate that the extension from 24 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is for a ontime only. See attached.

Sam Hassoun Supervisor - Nuclear Licensing Fermi 2 Nuclear Power Plant Office: 734 586-4287 Email: hassouna@dteenergy.com

      • PROPRIETARY, CONFIDENTIAL OR PRIVILEGED COMMUNICATION ***

This communication may contain proprietary, privileged or confidential information protected by law. It is solely for the use of the intended recipient named above.

Any review, dissemination, distribution, forwarding, or copying of this communication by someone other than the intended recipient, or the individual responsible for delivering this communication to the intended recipient, is prohibited. If you have received this communication in error, please immediately notify the sender via email, then destroy the original message.

  • 3*

(4) DECo, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material such as sealed neutron sources for reactor startup, sealed sources for reactor instrumen*tation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) DECo, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) DECo, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commi~sion's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions uf the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level DECo is authorized to operate the facility at reactor core power levels not in excess of 3430 megawatts thermal (l00% power) 'in accordance with the conditions specified herein and in Attachment 1 to this license.

The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 182 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. DECo shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions DECo shall abide by the agreements and interpretations between it and the Department of Justice rel atlno to Article I, Paragraph 3 of the Electric Power Pool Agreement between Detroit Edison Company and Amendment No. 182

CREF System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Emergency Filtration (CREF) System LCO 3.7.3 The CREF System shall be OPERABLE.

.. -... - -... --. ----------. -- --. ----... NOTE* . ----. -------------------. -------. -.

The control room boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1. 2. and 3.

During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQU IRED ACTI ON COMPLETION TIME A. One CREF subsystem A.1 Restore CREF 7 days inoperable. subsystem to OPERABLE status.

B. Two CREF subsystems B.1 Restore control room 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*

inoperable due to boundary to OPERABLE inoperable control status.

room boundary in MODE

1. 2, or 3.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or AND B not met in MODE 1.

2. or 3. C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
  • The 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is extended onetime to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to complete repairs of Division 2 Return Air Fan in May 2010.

FERMI - UNIT 2 3.7-6 Amendment No. a2~. t44. +/-49. 182