Notice of Violation from Insp on 890515-19.Violations Noted: on 890516,seven Film Packages in Feedwater Sys Had Incorrect Line Identification Permanently Radiographed on Films & on 890517,employee Observed Sleeping on Firewatch Duty
ML20244E552
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/09/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20244E538 List:
References
50-338-89-18, 50-339-89-18, NUDOCS 8906200388
Download: ML20244E552 (2)


Text

_ - _ . - _-

r .

l 1

ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Docket Nos. 50-338, 50-339 North Anna License Nos. NPF-4, NPF-7 During the Nuclear Regulatory Commission (NRC) inspection conducted on May 15-19, 1989, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1989), the violations are listed below:

A. 10 CFR 50, Appendix B, Criterion V as implemented by the Virginia Electric and Power Compuny QA Topical Report (VEP-1-4A) requires in-part that, activities affecting quality shall be prescribed by documented instructions or procedures and shall be accomplished in accordance with these instructions or procedures.

Virginia Electric Power Company's Radiographic Examination Procedure No. NDE-RT-101, Rev. O, Paragraph 2.1.3 states that a system shall be used to produce permanent identification on the radiograph traceable to the Contract Component, weld or weld seam or part numbers. Addendum A, paragraph A.2 states that welds that are shown by radiography to have incomplete fusion are unacceptable.

Contrary to the above, on May 16, 1989, seven film packages for welds in the Feedwater System had incorrect line identification permanently radiographer on the films. In addition, approximately li inches of incomplete fusion in the weld at break point 851 had not been rejected by the licensee in accordance with the approved procedure.

This is a Severity Level IV violation (Supplement 1-D).

B. 10 CFR 50, Appendix B, Criterion V as implemented by the Virginia Electric and Power Company QA Topical Report (VER-1-4A) requires in-part that, activities affecting quality shall be prescribed by documented instructions or procedures and shall be accomplished in accordance with these instructions or procedures. Relative to fire protection, these requirements are implemented, by the North Anna Fire Protection Manual

" Fire Protection Program" Section 3.5.7 which states, in part, that a firewatch shall be required during any work involving ignition sources when the work is performed in a safety-related area.

Contrary to the above, on May 17, 1989, activities were not accomplished in accordance with the above, in that an employee assigned to firewatch ,

duty was observed, by NRC, to be sleeping on duty in the Unit 1 containment building, while welding was in process. This individual was working to Work Order 88-11, under Radiation Work Permit 1885.

1 1

I 8906200388 890609

~

PDR ADOCK 05000338 I 4

PNU Ku-n-~.----

-., 5 , .

m Virginia Electric and Power Company .2 Docket Nos. 50-338, 50-339 l North Anna License Nos. NPF-4, NPF-7 This is a Severity Level IV violation (Supplement 1-D).

Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company-is .hereby required to submit.a written statement or explanation to the Nuclear Regulatory Commission, ATTN: . Document Control Desk, Washington, DC . 20555, with a copy. to the Regional Administrator, Region II, and a copy to the NRC ResidentL!nspector, North Anna, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a." Reply to a l . Notice of Violation" ~and should include for each violation: (1)admissionor denial of the violation, (2) the reason for the violation if admitted, (3) the corrective-. steps which have - been taken and .the results achieved, (4) the

. corrective steps which' will be taken to avoid further violations, and (5) the date when full compl_iance will be achieved. Where good cause is shown, .

consideration will be given to extending the response time. If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

l FOR THE NUCLEAR REGULATORY COMMISSION n

Caudie A. Julian, Chief Engineering Branch Division of Reactor Safety Dated a q Atlanta, Georgia this(Mday of June 1989