Notice of Violation from Insp on 890715-0822.Violation Noted:Surveillance Procedures 2-PT-36.5.3A & 3B, Ssps Output Slave Relay Trains A&B, Did Not Correctly Detail Interlock Conditions for Energization of K630 Relay
ML20248B490
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/21/1989
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20248B477 List:
References
50-339-89-26, NUDOCS 8910030218
Download: ML20248B490 (2)


Text

_ _ . __

l l ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Docket No. 50-339 North Anna Unit 2 License No. NPF-7 During the Nuclear Regulatory Commission (NRC) inspection conducted on July 15 through August 22, a violation of NRC requirements was identified. In and Procedures for NRC accordance Enforcement with the "10 Actions," General Statement CFR Part of Policy 2, Appendix C - (1989), the violation is listed below:

Technical Specification 6.8.1.c requires written procedures be established, implemented, and maintained covering surveillance and test activities of safety-related equipment.

Contrary to the above, surveillance procedures 2-PT-36.5.3A and 3B, "SSPS Output Slave Relay Trains A & B," performed on August 6 and 8, 1989, was inadequate in that:

1. Procedure 2-PT-36.5.3A did not correctly detail the interlock conditions for energization of the K630 relay.
2. Procedure 2-PT-36.5.3A did not indicate that the casing cooling supply to recirculation spray valve, 2-RS-M0V-201G, would close on energization of K645. KE45XA, resulting in the valve closure, making the B train of the outside recirculation spray system inoperable.
3. Procedures 2-PT-36.5.3A and 3B did not reset the Phase A signal generated by energizing the K614 relay, resulting in the air ejector discharge to containment valves, SV-TV-202-1 and 203 not properly opening on a Hi-Hi radiation signal generated during subsequent surveillance testing.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, North Anna is hereby required to submit a written statement or explanation to the Nuclear Regulatory Comission.

ATTN: Document' Control Desk Washington, DC 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice. This reply a

," Virginia Electric and Power Company Docket No. 50-339 North Anna Unit 2 License No. NPF-7 should be clearly marked as a " Reply to a Notice of Violation" and should include: (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or. revoked or why such other action as may be proper should not be

.taken.

FOR THE NUCLEAR REGULATORY COMMISSION t

Marvin . Sinkule, Chief K Reactor Projects Branch 2 Division of Reactor Projects Dated at Atlanta, Georgia this ?/ M y of September 1989