Notice of Violation from Insp on 880514-0610.Violation Noted:Both Diesel Generators Inoperable for Over 38 H on 880518-19,while Preventive Maint Performed on One Diesel Generator
ML20207G351
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/17/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20207G335 List:
References
50-339-88-16, NUDOCS 8808240097
Download: ML20207G351 (1)


Text

a NOTICE OF VIOLATION Virginia Electric and Power Company Docket Nos. 50-339 North Anna Power Station Licente Nos. NPF-7 Unit 2 During the Nuclear Regulatory Commission (NRC) inspection conducted on May 14 -

June 10, 1988, one violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Ac-tions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

l Technical Specification 3.8.1.1 requires in part, two separate and inde-pendent diesel generators be operable with the unit in Modes 1, 2, 3 and 4.

Technical Specification ACTION statement 3.8.1.1.e states in part, with two of the above required diesel generators inocerable, rectore one of the inoperable diesel generators to an operable status within two hours, or be 1

in at least Hot Standby within thL ' ext six hours and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Contrary to the a'oove, with the reactor in Mode 1, both diesel generators were inoperable over a period of approximately 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> on May 18-19, 1988, while preventive maintenance was performed on one diesel generator, and the output breaker for the other diesel generator was inoperable because 4

the charging spring motor was disengaged from the breaker housing.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company ic hereby required to submit a written statement or explanation to the Nucitar Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, North Anna Power Station, within 30 days of the date of the letter transmitting this Notice.

This reply should be clearly marked as a "Reply to a Notice o' Violation" and should include [for each violation):

(1) admission or denial of the violation, (2) the reason for the violation if 1

admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further viola-tions, and (5) the date when full compliance will be rchieved.

Where good cause is shown, consideration will be given to extending the response time.

If an adequate reply is not received within the time specified ih this Notice, an i

order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

1 FOR THE NUCLEAR REGULATORY COMMISSION q'kuvw, 8808240097 880817 PDR ADOCK 05000339 0

J. Nelson Grace Regional Administrator 07ted at Atlanta, Georgia this day of August 1988

-.