Notice of Violation from Insp on 870513-0616
ML20234D686
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/29/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20234D639 List:
References
50-338-87-15, 50-339-87-15, NUDOCS 8707070302
Download: ML20234D686 (2)


Text

,

I ENCLOSURE 1 )

i NOTICE OF VIOLATION I I

Virginia Electric and Power Company Docket Nos. 50-338 and 50-339 North Anna Units 1 and 2 License Nos. NPF-4 and NPF-7 .

1 I

During the Nuclear Regulatory Commission (NRC) inspection conducted on j May 13 - June 16,1987, violations of NRC requirements were identified. The 1 violations involved a failure to comply with Technical Specification (TS) j 3.6.1.1 and failure to follow refueling procedures. In accordance with with the

" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1787), the violations are listed below: )

A. Technical Specification 3.6.1.1 requires primary containment integrity to be maintained in modes 1, 2, 3 and 4. Containment integrity is maintained by verifying that all penetrations not capable of being closed by operable containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except as provided in Table 3.6-1 of Specification 3.6.3.1.

Contrary to the above on numerous occasions during the past two years the performance of TS 4.4.6.2.a, surveillance requirement for the hydrogen recombiner, was conducted with the associated unit in modes 1, 2, 3 or 4.

The performance of this surveillance requires manually operated contain-ment isolation valves listed in TS table 3.6-1 to be open for greater than 1 one hour violating the containment integrity TS 3.6.1.1. The last perfor-mance of this surveillance was March 6,1987 for Unit 1 which was operating at 100% and May 21, 1987 for Unit 2 which was operating at 100%.

This is a Severity Level IV violation (Supplement 1) and applied to both units.

B. Technical S p .fication 6.8.1.b requires written procedures to be established, implemented and maintained covering refueling operations.

Contrary to the above on May 16, 1987 the refueling building bridge operator violated the licensee's refueling procedures and policies by operating the bridge in the lateral direction with an attached saent fuel assembly still inserted in the fuel storage rack and operating tie bridge crane with only one operator when licensee policies require two. This failure to follow procedure resulted in the potential for damage to a spent fuel assembly. The assembly was removed from the rack, inspected and determined not to be damaged.

This is a Severity Level IV violation (Supplement 1) and applies only to Unit 1.

%[0Jg g G

l

' Virginia Electric and Power Company 2 Docket Nos. 50-338 and 50-339 North Anna Units 1 and 2 License Nos. NPF-4 and NPF-7 Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power  :

Company is hereby required to submit to this Office within 30 days of the date i of the letter transmitting this Notice, a written statement or explanation in i reply, including (for each violation): (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective ]

steps which have been taken and the results achieved, (4) the corrective steps which wil be taken to avoid further violations, and (5) the date when full i compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY C MMISSION ORIGINAL CICNED BY VIRGIL L. BROWNLEE Luis A. Reyes, Director DivisionofReactorProjects l I

Dated at Atlanta, Georgia this c46 day ot x 1987 1