Rev 3 to Emergency Operating Procedure EOP-01-EDP, Emergency Depressurization Procedure
ML20205S787
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/08/1988
From: Bishop E
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20205K904 List: ... further results
References
EOP-01-EDP, EOP-1-EDP, NUDOCS 8811110175
Download: ML20205S787 (5)


Text

- _ _ _ -

. ,y c, it. .

CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT WIT 0 EMERGT' ICY DEPRESSURIZATION PROCEDL?.E D(ERGENCY OPERATING PROCEDURE: EnP-01-CDP VOLLHE VI Rev. 003 0% -

,A*hw',s

.s P : *+#

1 <? l Approved By $f!t.u, Date: Y Gene $1Managep I /

' Manager - Operacwons 1

I of 5 B"111110175 001025 '

PDR ADOCK 050003P4

, P PDR Q

LIST OF EFFECTIVE PAGES E0P-01-EDP Page(s) Revision 1-5 3 BSEP/'lol. VI/EOP-01-ELP 2 of 5 Rev. 3

A. TITLE - Emergency Depressurization Procedure B. ENTRY CONDITIONS

1. Depressurization of the reactor is required AND
2. Less than three SRVs can be opened AND
3. Reactor pressure is at least 50 psig above suppression chamber pressure.

C. OPERATOR ACTIONS

                                                            • a***e*******************************************

CAUTION DO NOT DEPRESSURIZE below 120 psig L'NLESS motor driven pumps sufficient to maintain reactor vessel level are running and available for injection.

ene*********name**********a***************************************************

I

1. DEPRESSURIZE the reactor with one or more of the following systemst
a. Main Condenser
b. Main Steam Line Drains
c. HPCI (full flow test mode)
d. RCIC (full flow test mode)
2. IF the MSIVs are closed due to a reactor vessel lov level Group 1 isolation AND the main condenser is available as a heat sink.

THEN PERFORM the following steps:

a. PLACE all MSIV switches to "CLOSE."
b. PLACE the following switches to "0VERRIDE RESETt" (1) DIV I NON-INTRPT. RNA-SV-5262

_ (2) DIV II NON-INTRPT. RNA-TV-5261 i c. CLOSE the followit.g valves:

i (1) Main Steam Line Drain Inboard Isolation Valve. 521-P016

___ (2) Fein Steam Line Drain Outboard Isolation Valve. 521-T019 (3) Sample Inboard Isolecion valve B32-P019 (4) Sample Outboard Isolation Valve. 532-F020 BSEP/Vol. VI/EOP-01-EDP 3 of 5 Rev. 3

1

d. UNIT 1 only - INSTALL the following jumpers to bypass the reactor vessel low level (+112 inches) Group 1 isolation.

(1) In Cabinet XU-65, between Terminals 27 and 28 on Terminal i Board TB-A.

(2) In cabinet XU-66. between Terminals 27 and 28 on Terminal Board TB-A.

(3) In Cabinet XV-67, between Terminals 27 and 28 on Terminal Board TB-A.

___ (4) In Cabinet XU-68 between Terminals 27 and 28 on Terminal Board TB-A.

e. UNIT 2 only - INSTALL the following jumpers to bypass the ,

reactor vessel low level (+45 inches) Grcup 1 isolation.  ;

~~~

(1) In Cabinet XU-65, between Terminals 43 and 44 on Terminal Board TB-A.

(2) In Cabinet XU-06, between Terminals 43 and 44 on Terminal Board TB-A.

(3) In Cabinet XU-67, between Terminals 43 and 44 on Terminal Board TB-A. ,

___ (4) In Cabinet XU-68. between Terminals 43 and 44 on Terminal l Board TB-A.

f. RESET Group 1 isolation.
g. EQUALIZE pressure and REOPEN MSIVs.
h. F.APIDLY DEPRESSURIZE the reactor with the bypass valve opening jack. ,

BSEP/Vol. VI/EOP-01-EDP 4 of 5 Rev. 3

o s [

o = '

e  ;

3. WHEN three or more SRVs are open OR reactor pressure is less than 50 psig above suppression chamber pressure. THEN PERFORM the following stepst
a. IF jumpers were installed to bypass the reactor vessel level lI 3roup 1 isolation. THEN REMOVE the following jumpers (1) UNIT 1 only

/ (a) In Cabinet XU-65, between Terminals 27 and 28 on Ind. Ver. Terminal Board TB-A.

/ (b) In Cabinet XU-66, between Terminals 27 and 28 on Ind. Ver. Terminal Board TB-A.

/ (c) In Cabinet XU-67, between Terminals 27 and 28 on Ind. Ver. Terminal Board TB-A.

/ (d) In Cabinet KU-68. between Terminals 27 and 28 on Ind. Ver. Terminal Board TB-A. l (2) UNIT 2 only f

?

/ (a) In Cabinet XU-65..between Terminals 43 and 44 on l Ind. Ver. Terminal Board TB-A.

/ (b) In Cabinet XU-66, between Terminals 43 and 44 on j Ind. Ver. Terminal Board TB-A.  ;

i (c) In Cabinet XV-67, betvmen Terminals 43 and 44 on Ind. Ver. Terminal Board TB-A.

/ (d) In Cabinet XU-68, between Terminals 43 and 44 on Ind. Ver. Terminal Board TB-A.

b. Place the following switches to "0 PEN":

/ (1) DIV I NON-INTRPT. RNA-SV-5262 Ind. Ver.

/ (2) DIV II NON-INTRPT. RNA-SV-5261 Ind. Ver.

c. EXIT this procedure. l BSEP/Vol. VI/EOP-01-EDP 5 of 5 Rev. 3 l

~