4

\

CAROLINA POWER & LIGHT COM:'ANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 0 TURBINE BUILDING CLOSED COOLING VATER SYSTEM RECOVERY EMERGENCY OPERATING PROCEDURE: E0P-01-SRP-TBCCW VOLUME VI Rev 002 ONLY ittsvts, 4 FOR mainteesete, INFO tests, srvrd utat a Rd13beV:tf toperformfputa's chaeges, p' ant systems, c e

(; rate t ra"t u lt;terter.t desip Approved By: - I Gendra1 Manaufr/

Date: I[2 I (

Manager - Operations Page 1 of 7 kk P

LIST OF EFFECTIVE PAGES EOP-01 SRP-TBCCW Page(s) Revision 1-2 2 3 1 4 2 5-7 1 I-BSEP/Vol. VI/EOP-01-SRP-TBCCW Page 2 of 7 Rev. 2

A. TITLE - Turbine Building Closed Cooling Water System Recovery B. ENTRY CONDITION TBCCW header pressure CANNOT be maintained above 42 psig.

C. CPERATOR ACTIONS 4444 A A44 444 44 4 A A A A A n

  • A** A A A A A A A A A A A A A** A ** ***e** A A A A A A A A A A A *** A A ta A A 444 A A 4 4 4* A CAUTION

~

If TBCCW Pump 2C is opercting AND both selector switches are placed in "0PERATE." THEN the pump will TMIP and all suction and discharge valves will i close. I

    • enae**nA**e********************s****************************nene******.......
l. SELECT TBCCW Pump 2C to the affected unit and START the pump.

l Selector Switch Valve Position Ut U2 V3 V4 ' V14 Vi$

Spare TBCCW Pump OPER IDLE C 0 C 0 2C to Unit 1 3 Spare TBCCW Pump IDLE OPER 0 C 0 C 2C to Unit 2  !

2. IF TBCCW header pressure is below 42 psig. THEN VERIFY or INITIATE ,

the following steps:

a. IF the TBCCW head tank level is low (UA-3 1-4 or local). THEN UNLOCK and CLOSE Head Tank TBCCW Supply To Unit 1(2). TCC-V1, for the affected unit.
b. TRIP both reactor recirculation pumps.
c. TRIP both reactor feed pumps.
d. TRIP all condensate and condensate booster pumps, i
e. TRIP TBCCW pumps supplying the affected unit.
f. ISOLATE the service air header.
g. TRIP main turbine.

BSEP/Vol. V!/EOP-01-SRP-TBCCW Page 3 of 7 Rev. 1

a .

NOTE An operating unit should have at l 1 east one unloaded ccmpressor BEFORE cross-tying air systers.

h. UNLOCK and OPEN Unit I and Unit 2 Cross-tie Valve, SA-V7.
1. IF opening the service air cross-tie adversely affe:ts an operating unit. THEN CLOSE and LOCK CLOSED SA-V7
j. TRIP affected unit's air compressors.
k. PLACE all MSIV switches to "CLOSE."
1. TRIP SJAE, SPE, and rechanical vacuum pumps.
m. OPEN condenser vacuum breakers (OC-VB-1 and 2).
3. IF the TBCCW pumps have lost electrical power OR will not start,

, THEN CONTINUE in Section 1 on page 5 of this procedure.

4 IF the TBCCW pumps were running AND the header pressure could NOT be maintained above 42 psig THEN CONTINUE in Section 2 on page 6 of this procedure.

1 BSEP/Vol. VI/EOP-01-SRP-TBCCW Page 4 of 7 Rev. 2

r 9ection 1 - A/C power is NOT available to the TBCCW pumps OR the pumps will NOT start.

~~

1. IF the af fected unit's 4KV bus C OR D is deenergized. THEN PERFORM Ihe "Auxiliary Electrical Power System Recovery Procedure concurrently with this procedure.
2. CHECK pump breakers locally.
3. H2 SET thermal or magnetic trips as required. l
4. NOTIFY Maintenance to begin repatra as necessary.

~~

5. VMEN electrical pow 3r in restored. THEN CONTINUE in Section 3 on page 7 of this procedure. l l

l BSEP/Vol. VI/EOP-01-SRP-TBCCW Page 5 of 7 Rev. 1

,Section 2 - TBCCW pumps are NOT maintaining the TBCCW header pressure above 42 psig.

~~

1. IF the TBCCW head tank level is low (UA-31-4 OR local). THEN PERFORM the following stepst
a. WALK DOWN system piping to locate leakage.
b. ISOLATE any source of leakage that is found.
c. NOTIFY Maintenance to begin repairs se necessary.

~~

2. VHEN system leakage has been isolated, repaired. OR it has been determined that no leakage exists. THEN PERFORM tee following steps:
a. REST 0kE the TBCCW head tank level to normal (26-38 inches)

~~

b. OPEN and LOCK OPEN the Head Tank TBCCW Supply To Unit 1(2), '

TCC-V1. for the affected unit.

c. CONTINUE in Section 3 on page 7 of this procedure.

BSEP/Vol. VI/EOP-01-SRP-TBCCW Page 6 of 7 Rev. 1

,Section 3 - Restoring the TBCCW System

1. START TBCCW pumps as necessary to maintain TBCCW header pressure above 42 psig.
2. IF the TBCCW header pressare is below 42 psig, THEN PERFORM the following steps:

~~

a. MONITOR TBCCW header pressure locally (TCC-PI-556-2) to ensure j validity of the low pressure alarn.
b. VERIFY proper valve alignment and pump coupling integrity  ;

(OP-44).

~~

c. IF TBCCW header pressure CANNOT be restored and maintained above 42 psig, THEN RETURN to Step C on page 3 of this l procedure.
3. START the Instrument and Service Air Systems (OP-46). l
4. START the Condensate /Feedvater System (OP-32).
5. START Reactor Recirculation System (OP-02).

BsEP/Vol. VI/EOP-01-SRP-TBCCW Page 7 of 7 Rev. 1