Notice of Violation from Insp on 850821-0920
ML20138M726
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/21/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20138M724 List:
References
50-369-85-30, 50-370-85-32, NUDOCS 8511040256
Download: ML20138M726 (1)


See also: IR 05000821/2009020

Text

-- . _. . - _ - . - . . . - - . ._ . --- . . - . - . _ _ - - - - . ---

4

i  !

!

! -

i .

i

j ENCLOSURE 1  ;

'  ;

NOTICE OF VIOLATION i

i

!

1

l

'

Duke Power Company Docket Nos. 50-369 & 50-370

McGuire Nuclear Station License Nos. NPF-9 & NPF-17

i

The following violations were identified during an inspection conducted on  ;

August 21 - September 20, 1985. The Severity levels are assigned in accordance  !

with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

1. Technical Specification 3.8.1.1 states that with one diesel generator  ;

,

inoperable, all systems, subsystems, trains, components and devices that

i depend upon the remaining operable diesel generator as a source of emergency

1 power must also be operable for that train to be operable and states that if

two trains are inoperable for two hours, the unit must be in at least hot

standby within the next six hours and cold shutdown within the following 30

hours.

,

Technical Specification 3.4.3 requires for a pressurizer to be operable,

, that at least two groups of pressurizer heaters be operable each having a

J capacity of at least 150 KW.

Contrary to the above, on September 11, 1985, two trains of pressurizer

'

heaters with their required emergency power supplies were not available from

i 9:50 a.m. until 7:33 p.m. on September 11, 1985.

This is a Severity Level IV violation (Supplement I) applicable to Unit 1.

2. Technical Specification 6.8.1 requires that current written approved

procedures be established implemented and maintained covering shift relief,

turnover and maintenance of minimum shift complement.

Contrary to the above, on September 6,1985, at 3:00 p.m., none of the

Senior Reactor Operators (SRO) designated on the shift supervisor's turnover

checklist as being required to be in the control room at the time were

present. A non-designated SR0 was present in the control room.

l This is a Severity level IV violation (Supplement I), applicable to Units 1

and 2.

8511040256 851021

PDR ADOCK 05000369

DCT E l 1985 8