ML20034C206
| ML20034C206 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/20/1990 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20034C204 | List: |
| References | |
| 50-369-90-01, 50-369-90-1, 50-370-90-01, 50-370-90-1, NUDOCS 9005020167 | |
| Download: ML20034C206 (2) | |
Text
,
i ENCLOSURE 1 NOTICE OF VIOLATION Duke Power Company Docket Nos. 50-369, 50-370 McGuire Nuclear Station License Nos. NPF-9 NPF-17 During the Nuclear Regulatory Commission (NRC) inspection conducted on February 26 - March 2,1990 and March 12-16, violations of NRC requirements were identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1990), the violations are listed below:
A.
Technical Specification (TS) 6.11 requires procedures for personnel radiation protection be prepared consistent with the requirements of 10 CFR 20 and be approved, maintained and adhered to for all operations involving personnel radiation protection.
Radiation Protection Manual Section 2.3, Contamination Control, Revision (Rev.) 23, dated November 11, 1989, requires that all personnel exiting-from radiologically-controlled areas (RCAs) must frisk personal items such as hardhats, notebooks, and flashlights.
Contrary to the above, during the week of March 12, 1990, approximately i
50 percent of 20 workers observed exiting the 774 foot elevation of the Unit 2 Auxiliary Building RCA failed to perform an individual radiation survey of personal items, for example hardhats.
This is a Severity Level IV Violation (Supplement IV).
B.
TS 6.11 requires procedures for personnel radiation protection be prepared consistent with the requirements of 10 CFR 20 and be approved, maintained and adhered to for all operations involving personnel radiation protection, i
Radiation Protection Manual, Section 3.4, ALARA Pre-job and Post-job Evaluation, Rev.1, dated September 15, 1989, requires documentation of Pre-job ALARA evaluations including work hour / dose rate reduction methods-for each activity; and adjusted work hours, exposure estimates, and Pre-job meeting minutes.
pgS020167900420 o
ADOCK 05000369 PDC i
Duke Power Company Docket Nos. 50-369, 50-370 McGuire Nuclear Station 2
License Nos. NPF-9, NPF-17 Contrary to the above, the licenese failed to maintain adequate documentation of Pre-job Reactor Coolant Pump (RCA) ALARA activities conducted in association.with.the Unit 2. End of Cycle.Six (U2-E006) refueling outage.
This is e Severity Level V violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit a written stetement or explanation to the Nuclear Regulatory Commission, ATIN:
Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector.
l within 30 days of the date of the letter transmitting this Notice.. This reply should be clearly marked as a " Reply to a Notice of Violation" and should include [for each violation]:
(1) admission or denial of the violation, (2) the reason for the violation if admitted. (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will.
be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
l l
FOR THE NUCLEAR REGULATORY COMMISSION Swpb N/ h'u i
Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards.
Dated at Atlanta,A MGeorgia this kct.) day of P
1990 I
P
,