Notice of Violation from Insp on 930822-0925.Violation Noted:Vendors Replacing Roof on Unit 1 Fuel Handling Building Failed to Adhere to Requirements to Use Fire Extinguishers & Obtain Hot Work Permit
ML20059K429
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/20/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059K412 List:
References
50-369-93-18, NUDOCS 9311160057
Download: ML20059K429 (1)


Text

. _

,, c ENCLOSURE 1 NOTICE 0." VIOLATION Duke Power Company Docket No. 50-369 McGuire Unit 1 License No. NPF-9 During an Nuclear Regulatory Commission (NRC) inspection conducted August 22, 1993, through September 25, 1993, a violation of NRC requirements was >

identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is <

listed as follows:  ;

Technical Specification 6.8.1 requires that written procedures be i established, implemented and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33,  ;

Revision 2, February, 1978, which includes administrative procedures to implement the fire protection program.

Contrary to the above, on August 12, 1993, vendors replacing the roof on the Unit I fuel handling building failed to adhere to requirements to use fire extinguishers, obtain a hot work permit, or notify the control '

room of a fire, as was required by licensee procedure, MSD 462, Hot Work Authorization, Revision 1.

This is a Severity Level IV (Supplement I) violation.

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the McGuire Nuclear Station, within 30 days of the date )

of the letter transmitting this Notice of Violation (Notice). This reply  ;

should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that  ;

will be taken to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the  ;

time specified in this Notice, an order or c'emand for information may be ,

issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time. >

-i i

Dated in Atlanta, Georgia f this 20th day of Oct.1993  ;

9311160057 931020 PDR ADOCK 05000369 G PDR .

--