Notice of Violation from Insp on Stated Date.Violation Noted:Licensee Had No Specific Procedure in Place Nor Any Preventative Maint Schedule Developed for Lake Level Instrumentation,For Purpose of Entering Emergency Plan
ML20056E317
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/09/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20056E315 List:
References
50-369-93-11, 50-370-93-11, NUDOCS 9308230172
Download: ML20056E317 (1)


Text

. - . . - . - -

l l

l .

ENCLOSURE 1 l NOTICE OF VIOLATION l Duke Power Company Docket Nos. 50-369 and 50-370 McGuire Units 1 and 2 License Nos. NPF-9 and NPF-17 ,

i During an Nuclear Regulatory Commission (NRC) inspection conducted on June 13, 1993 through July 17, 1993, a viclation of NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC i Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed i

below

Technical Specification 6.8.1 requires that written procedures be established, '

implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February,1978, which  ;

includes calibration of instrumentation and development of a preventative maintenance schedule.  !

Contrary to the above, the licensee had no specific procedure in place nor any preventative maintenance schedule developed for lake level instrumentation, which is used to monitor lake level for the purpose of entering the emergency plan.  :

1 This is a Severity Level IV (Supplement I) violation.

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Comission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region II, a copy to the NRC Resident Inspector, at the McGuire facility within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2).the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be

_ proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Dated at Atlanta, Georgia this 9th day of August 1993 i

v-4308230172 930809 1;q DR ADDCK0500g9 eg