Text

_ ._. _ _ _ _. _ _ _ _ __ --__ . _ _ _ _ _ . . _ - - . _ . ___ . __

i

i i

,

,

'

! ENCLOSURE 2 NOTICE OF DEVIATION

The following deviation was identified during an inspection conducted August 21 -

September 20, 198 McGuire FSAR Section 9.4.2.3 and Table 9.4.2-3 stipulate that in-place testing of the Auxiliary Building Ventilation Systems (VA), had been conducted in accordance with Regulatory Guide 1.52 (Revision 2, March 1978)

which in turn obligates the licensee to ANSI N 510-197 Contrary to those comittments, a review of completed pre-operational tests performed on both McGuire units revealed that Regulatory Guide 1.52 and/or ANSI N 510-1975 were not adhered to in that the number of data sets taken with respect to charcoal adsorber efficiency were not in compliance with ,

those in the reference documents nor was filter air flow distribution

, testing performed as specifie This is a deviation applicable to Units 1 and 2.

l

Date: OCT 211985

1 J

l

,

8511040262 851021 I

PDR ADOCK 05000369 G PDR

!