ENCLOSURE 2
'
NOTICE OF DEVIATION
The following deviation was identified during an inspection conducted August 21 -
September 20, 1985.
McGuire FSAR Section 9.4.2.3 and Table 9.4.2-3 stipulate that in-place testing of the Auxiliary Building Ventilation Systems (VA), had been conducted in accordance with Regulatory Guide 1.52 (Revision 2, March 1978)
which in turn obligates the licensee to ANSI N 510-1975.
Contrary to those comittments, a review of completed pre-operational tests performed on both McGuire units revealed that Regulatory Guide 1.52 and/or ANSI N 510-1975 were not adhered to in that the number of data sets taken with respect to charcoal adsorber efficiency were not in compliance with
,
those in the reference documents nor was filter air flow distribution testing performed as specified.
,
This is a deviation applicable to Units 1 and 2.