Notice of Violation from Insp on 960908-1019.Violation Noted:Plant Periodic Test Procedure,Annulus Ventilation Sys Train B Operability Test Not Adequate
ML20135C241
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/15/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20135C237 List:
References
50-369-96-08, 50-369-96-8, 50-370-96-08, 50-370-96-8, NUDOCS 9612060241
Download: ML20135C241 (2)


Text

NOTICE OF V10LATION  !

1 Duke Power Company Docket Nos. 50-369 and 50-370 l McGuire Nuclear Plant License Nos. NPF-9 and NPF-17

'T During an NRC inspection conducted on September 8 through October 19. 1996, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions." NUREG-1600.

the violation is listed below:

Technical Specification 6.8.1 recuires, in part, that written procedures shall be established. implementec. and maintained covering the activities referenced in Appendix A of Regulatory Guide 1.33. Revision

2. February 1978. i i

Regulatory Guide 1.33. Revision 2. Appendix A section 8.b. addresses  ;

procedures for surveillance testing required by Technical  !

Specifications. '

Contrary to the above. McGuire Periodic Test procedure. Annulus  !

Ventilation System Train B Operability Test. PT/1/A/4450/03B. was not ddequate. Specifically, on September 29. 1996, it was identified that PT/1/A/4450/03B did not contain adequate instructions to ensure that the ,

containment system annulus ventilation system preheaters remained energized for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> during surveillance testing.

This is a Severity Level IV violation (Supplement I). j Pursuant to the provisions of 10 CFR 2.201. Duke Power Com)any is hereby required to submit a written statement or explanation to t1e U.S. Nuclear Regulatory Commission. ATTN: Document Control Desk. Washington. D.C. 20555 with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident Inspector at the McGuire Nuclear Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply sht 'd

,~

be clearly marked as a " Reply to a Notice of Violation" and should include r each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the dat's when full compliance will be achieved.

Your response may reference or include previous docketed correspondence if the correspondence adequately address the recuired response. If an adequate reply is not received within the time specifiec in this Notice, an order or Demand for Information may be issued as to w.ly the license should not be modified. suspended, or revoked, or why s=.h other action as may be ] roper should not be taken. Where good cause is shown, consideration will 3e given to extending the response time.

ENCLOSURE 1 e

9612060241 961115 (

PDR ADOCK 05000369 e G PDR 1

Notice of Violation 2 l Because your res)onse will be placed in the NRC Public Document Room (PDR), to  !

the extent possi)le, it should not include any personal privacy, 3roprietary, or safeguards information so that it can be placed in the PDR witlout redaction. However if you find it necessary to include such information, you i should clearly indicate the specific information that you desire not to be  !

placed in the PDR. and provide the legal basis to support your request for withholding the information from the public.

Dated at Atlanta, Georgia this 15th day of November, 1996 i