Notice of Violation from Insp on 900425-0521.Violation Noted:Failure to Follow Procedure by Not Signing Off Required Step & Failure to Follow Procedure for Documentation of Problem Investigation Process
ML20044A540
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/15/1990
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20044A539 List:
References
50-369-90-09, 50-369-90-9, 50-370-90-09, 50-370-90-9, NUDOCS 9006290186
Download: ML20044A540 (2)


Text

!

Mu-"

-1 1

ENCLOSURE 1 NOTICE OF VIOLATION l

Duke Power Company '

Docket Nos. 50-369 and 50-370 McGuire Units 1 and 2 License Nos. NPF-9 and NPF-17 During the Nuclear Regulatory Connission (NRC) inspection conducted on i

April 25,1990 through May 21, 1990, a violation of = NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1990), the violation' is identified below:

10 CFR 50, Appendix B, Criterion 1/; Instructions, Procedures and Drawings; requires that activities affecting quality shall be. prescribed ; by documented procedures and shall be accomplished in accordance with-these.

procedures..

Station Directive 2.8.1, Problem Investigation Process, step 5.4.2.1, requires, in part, that when corrective action has.been completed,Section VIII of the PIR shall be completed-by the group assigned the-action.

The i

description of the corrective action shall include reference to procedural-and administrative actions and actions taken to restore structures,-

4 systems, and components.

[

l Contrary to the above,Section VIII :of PIR 2-M89-0234, was' signed as.

completed on December 5,1989 for two corrective actions concerning the revision of procedure MP/0/A/7150/69, when the revision was submitted for L

review, not when the corrective. actions were complete. 'The corrective actions had not been complete as of May 21,-1990..

inis is a Severity Level IV violation'(Supplement I)..

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby.

required to submit a written statement or explanation to the. V.S.1 Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region II,'and a copy to the NRC Resident l

Inspector, McGuire Nuclear Station within '30 days of -the date of the letter

(

transmitting this Notice.

This reply should be clearly marked as a " Reply. to a' i

Notice of Violation" and should include for each violation: (1)' admission or ~

denial of the violation, (2) the reason.for the violation if. admitted, (3) the corrective steps which have been taken and the results ' achieved, (4) the j

corrective steps which will be taken to avoid further violations, and (5).the date when full compliance will be' achieved.

Where good cause is shown,

~

consideration will be given to extending the response time.

If an adequate-9006290186 900615 PDR ADOCK 05000369 O

PDC l

F.

Duke' Power Company-2 Docket Nos. 50-369 and 50-370 McGuire Units 1 and 2 License Nos. NPF-9 and NPF-17 reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

FOR THE NUCLEAR REGULATORY COMMISSION 2'ch dp Alan R. He

, Chiev Reactor Projects Branch 3 Division of Reactor Projects Dated at Atlanta, Georgia

- this 15th day of June 1990