Notice of Violation from Insp on 891113-17.Violation Noted:Licensee Declared Unusual Event,But Failed to Notify State/Local Agencies Until 30 Minutes After
ML20005E658
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/26/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20005E657 List:
References
50-369-89-38, 50-370-89-38, NUDOCS 9001100058
Download: ML20005E658 (2)


Text

-

i r

ENCLOSURE 1 NOTICE OF VIOLATION i

Docket Nos. 50-369 and 50-370 Duke Power Company License Nos. NPF-9 and NPF-17 McGuire During the Nuclear Regulatory Commission (NRC) inspection conducted on November 13-17, 1989, violations of NRC requirenents were identified.

In accordance with the "Ceneral Statement of Policy and Procedure for NRC Enforcement Actions " 10 CFR Part 2. Appendix C (1989), the violations are listed below:

A.

10 CFR 50.54(q) requires that nuclear power reactor licensees follow and maintain in effect Emergency Plans which meet the requirements of 10 CFR 50.47(b).

Technical Specification 6.8.1.e requires, in part, that written procedures shall be implemented and maintained coverino the Emergency Plan implen.entation.

Section H.10 of the McGuire Emergency Plan states that station specific i

procedures define the inspection, inventory, and operational - checks required of emergency equipnent.

The specific requirements for the periodic test and fonctional operability of equipment are defined in Periodic Test (PT) Procedures PT/0/A/4600/79 and PT/0/A/4600/11.

According to PT/0/A/4600/79, on a quarterly basis (weather permitting), an operability test is performed on the emergency boat motor and radio communications.

Contrary to the above, during Calendar Year 1989, the emergency boat operability tests were not being conducted at the specified frequency in 3.1 of PT/0/A/4600/79. At the time of the inspection, only one test had been conducted during Calendar Year 1989.

This is a Severity level V violation (Supplement VIII).

B.

10 CFR 50.54(q) requires that nuclear power reactor licensees follow and maintain in effect Emergency Plans which meet the requirements of 10CFR50.47(b).

Technical Specification 6.8.1.e requires, in part, that t

written procedures shall be implemented and maintained covering the Emergency Plan implementation.

Section E of the McGuire Emergency Plan addresses notification and activation of the onsite and offsite emergency response organization.

Section 2.0 of RP/0/A/5700/01 " Notification of Unusual Event" details the activities regarding notification and activation following the classification of an event at the Notification of Unusual Event (NOVE) level. According to Section 2.1.2, the State and county notification must be made within 15 minutes of declaring the emergency.

9001100058 891226 PDR ADOCK 05000369 0

PDC

t l

Docket Nos. 50-369 and 50-370 Duke Power Company McGuire 2

License Nos. NPF-9 and NPF-17 Contrary to the above, on August 24, 1989, the licensee declared an unusual event at S:20 p.m., but failed to notify State / local agencies until 30 minutes after the event declaration (5:50 p.m.).

This is a Severity Level IV violation (Supplement VIII).

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit a written statement or explanation to the Nuclear Regulatory Consnission, ATIN: Document Control Desk Washington, DC 20555, with a copy to the flegional Administrator, Region II, and a copy to the NRC Resident Inspector, McGuire, within 30 days of the date of the letter transmitting this Notice.

This reply should be clearly marked as a " Reply to a Notice of Violation"andshouldinclude[foreachviolation]:

(1)admissionordenialof the violation (2) the reason for the violation if admitted. (3) the corrective steps which have been taken and the results achieved. (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

FOR THE NUCLEAR REGULATORY COMMISSION

+to T

Ff Douglas M. Collins, Chief Emeroency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards Dated at Atlanta, Georgia this ?lrkday of pmv1/v+1989 l

,