05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment

From kanterella
(Redirected from ML20138H662)
Jump to navigation Jump to search
Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment
ML20138H662
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/02/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16441, NUDOCS 9705070240
Download: ML20138H662 (3)


LER-2096-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment
Event date:
Report date:
4232096028R00 - NRC Website

text

- _ _ _ . . .~ . - - - ~ ~ ~ - ~ - - - - ~ ~ ~ ~ ~ ' - ' -~

=

~

Nordwest ""P'F"'"*""'*"'*""'*' l

$r NucTear Energy - Minwone Nuclear Power sudon f Nortlwant Nuclear Energy Company i P.O. Box 128  ;

Waterford, CT 06385-0128 '

(860) 447 1791 i Fax (860) 444-4277 l

The Nortlwast Utilities System Docket No. 50-423 .

B16441-  !

U. S. Nuclear Regulatory Commission MAY 2 1997 .

Attention: Document Control Desk  !

Washington, DC 20555  !

Millstone Nuclear Power Station, Unit No. 3 - '

l Commitment Revision - Charging Pump Cooiing System Temporary Modification '

The purpose of this letter is to inform the NRC of a revision to a commitment that we  ;

made in LER 96-028-01 regarding a temporary modification of the Charging Pump Cooling (CCE) system. In the LER we stated that a temporary modification would be i L installed prior to service water temperature reaching 39 degrees to maintain CCE operability until no longer required ~as the result of either. permanent modification or establishment of operability at a lower temperature. The temporary modification was j installed in December 1996 and was in place over the Winter. The Lona Island Sound  :

temperature is increasing to the point that the temporary modification will not support coatinued CCE operability. Therefore, the temporary modification will be removed -

during the Spring, Summer and Fall and will be reinstalled prior to the Long Island Sound temperature reaching 39 degrees in the Fall if the CCE operability issue has not <

been resolved.  ;

The revised commitment is provided in Attachment 1. ,

Should you have.any questions regarding this matter, please contact Mr. J. M. Peschel at (860) 437-5840.

NORTHEAST NU ENERGY COMPANY O ~

. ~

pirector- Millstone Unit No. 3 i cc: H. J. Miller, Region I Administrator (pf #

J. W. Andersen, NRC Project Manager, Millstone Unit Nc. 3 f L A. C. Ceme, Senior Resident inspector, Millstone Unit No. 3
W. D. Travers, PhD, Director, Special Projects Office 1

~

9705070240 970502 **',

t. PDR ADOCK 05000423

.S PDR u

e.

Docket No. 50-423 )

B16441 ,

)

.i I

t t

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments I

l c l

l i

l 4

{

May 1997 i

! i.

.. . . . . _ . . . ~ . _ _ _ _ _.._ _ _ _. . _. _ _ ._ _.._ _. _ . _ _ _ ._ _ .._._._

U.S.'Nucisar Regulatory Commission B16441\ Attachment 1\ Page 1 '

! t Enclosure ,

List of Regulatory Commitments j.

l The following table identifies those actions committed to by NNECO in this document.

j Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information-and are not regulatory commitments. Please notify the Manager - Nuclear Licensing at the '

Millstone Nuclear Power Station Unit No 3 of any questions regarding thic document or any associated regulatory commitments.

Number Commitment Due B15966-1 The Charging Pump Cooling (CCE) system will Prior to service be temporarily modified prior to service water water temperature 3 (SW) temperatures falling below 39 F.- reaching 39 F.  ;