Notice of Violation from Insp on 850401-0505
ML20127K913
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/22/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20127K910 List:
References
50-339-85-12, NUDOCS 8506270648
Download: ML20127K913 (1)


See also: IR 05000401/2005005

Text

-

.

,.

-

ENCLOSURE 1

N0TICE OF VIOLATION

Virginia Electric and Power Company Docket No. 50-339

North Anna Unit 2 License No. NPF-7

The following violation was identified during an inspection conducted on

April 1 - May 5,1985. The Severity Level was assigned in accordance with the

NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification suiveillance requirement 4.8.2.3.2 requires in part

that each 125 volt battery be verified OPERABLE at least once per seven days

by ensuring the electrolyte level of each pilot cell is between the minimum

and maximum level indication marks. 2-PT-85 (D.C. Distribution System) is

the procedure the licensee uses to verify the requirements of Technical

Specification surveillance 4.8.2.3.2. Step 5.2 of 2-PT-85 requires that

individual performing the procedure verify electrolyte of the pilot cells is

between the maximum level and one inch below that level.

Contrary to the above, when 2-PT-85 was performed on April 30, 1985, the

electrolyte levels were initialed as satisfactory when, in fact, electrolyte

level for the pilot cell on at least one battery (2-II) was above the

maximum level indication mark.

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30

days of the date of this Notice, a written statement or explanation in reply,

including: (1) admission or denial of the alleged violation; (2) the reasons

fer the violation if admitted; (3) the corrective steps which have been taken

and the results achieved; (4) corrective steps which will be taken to avoid

further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)