Category:INSPECTION REPORT
MONTHYEARIR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists IR 05000250/19970021997-03-0707 March 1997 Partially Withheld Insp Repts 50-250/97-02 & 50-251/97-02 on 970203-07 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000250/19930201993-08-10010 August 1993 Insp Repts 50-250/93-20 & 50-251/93-20 on 930712-16. Violations Noted.Major Areas Inspected:Area of Electrical Maint IR 05000250/19920331992-12-23023 December 1992 Insp Repts 50-250/92-33 & 50-251/92-33 on 921130-1204.No Violations or Deviations Noted.Major Areas Inspected. Physical Barriers,Intrusion Detection Alarms,Communication & Training & Qualification Plan.Rept Partially Withheld IR 05000250/19910331991-08-29029 August 1991 Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted.Major Areas Inspected:Training & Surveillance Testing for Upgrade of Emergency Power Sys & Followup of Previously Identified Items IR 05000250/19910081991-04-18018 April 1991 Insp Repts 50-250/91-08 & 50-251/91-08 on 910225-0301. Violations Noted.Major Areas Inspected:Outage HP Acs, Employee Training & Qualifications,Personnel Exposure Monitoring & Assessments & Radioactive Matl IR 05000250/19910101991-04-12012 April 1991 Insp Repts 50-250/91-10 & 50-251/91-10 on 910304-08 & 18-22. No Violations Noted.Major Areas Inspected:Procedures,Work Activities & Quality Records Pertaining to Erection of Structural Steel in New Diesel Generator Bldg IR 05000250/19910061991-02-25025 February 1991 Partially Withheld Insp Repts 50-250/91-06 & 50-251/91-06 on 910128-0201.No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Protected Area Physical Barriers, Status of Security Upgrade Program & Packages & Vehicles IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures IR 05000250/19860461987-02-19019 February 1987 Insp Repts 50-250/86-46 & 50-251/86-46 on 861117-21.No Violations or Deviations Identified.Major Areas Inspected: Training IR 05000250/19870011987-02-12012 February 1987 Insp Repts 50-250/87-01 & 50-251/87-01 on 870126-30.No Violations or Deviations Identified.Major Areas Inspected: Seismic Analysis for as-built safety-related Piping Sys (IE Bulletin 79-14) & safety-related Pipe Supports ML20210T8461987-02-0505 February 1987 Partially Withheld Insp Repts 50-250/87-05 & 50-251/87-05 on 870120-21 (Ref 10CFR2.790(d) & 73.21).Violation Noted: Failure to Provide Positive Access Control to Vital Area IR 05000250/19860501987-02-0303 February 1987 Insp Repts 50-250/86-50 & 50-251/86-50 on 861215-870112.No Violations or Deviations Noted.Major Areas Inspected: Surveillance Testing,Maint Observations & Reviews & Operational Safety Reviews IR 05000250/19870041987-01-30030 January 1987 Insp Repts 50-250/87-04 & 50-251/87-04 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters,Housekeeping & Matl Identification & Control IR 05000250/19870031987-01-29029 January 1987 Insp Repts 50-250/87-03 & 50-251/87-03 on 870113-16.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Radiological Emergency Preparedness Exercise.Related Info Encl IR 05000250/19860451987-01-13013 January 1987 Insp Repts 50-250/86-45 & 50-251/86-45 on 861103-1215. Violations Noted:Failure to Meet Requirements of Tech Spec 6.8.1 Re Written Procedures & Administrative Policies & 10CFR50,App B,Criterion Xvi Re Corrective Actions IR 05000250/19860481987-01-0909 January 1987 Insp Repts 50-250/86-48 & 50-251/86-48 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters & Seismic Analysis for as-built safety-related Piping Sys IR 05000250/19860441987-01-0606 January 1987 Insp Repts 50-250/86-44 & 50-251/86-44 on 861117-21. Violations Noted:Failure to Evaluate Valve Mods for Unreviewed Safety Questions & Failure to Follow Pipe Support Procedures ML20209F3321986-08-22022 August 1986 Partially Withheld Insp Repts 50-250/86-32 & 50-251/86-32 on 860610 & 0818 (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Protected Area Barriers,Gates & Compensatory Measures.One Violation Noted IR 05000250/19860261986-08-12012 August 1986 Enforcement Conference Repts 50-250/86-26 & 50-251/86-26 on 860108 & 0217-0515.Violations Noted:Inadequate Corrective Actions Re Component Cooling Water Sys Valves 748A & B Failures & Intake Cooling Water Sys Failures IR 05000250/19860291986-07-29029 July 1986 Insp Repts 50-250/86-29 & 50-251/86-29 on 860428-0502.No Violations or Deviations Noted.Major Areas Inspected:Control & Distribution of Emergency Electrical Loads.Unresolved Item Re Emergency Diesel Generator Load Control Noted IR 05000250/19860301986-07-0202 July 1986 Insp Repts 50-250/86-30 & 50-251/86-30 on 860512-0609. Violation Noted:Failure to Properly Implement Operating Procedure for Steam Generator Protection Channels Per Tech Spec 6.8.1 IR 05000250/19860231986-04-29029 April 1986 Insp Repts 50-250/86-23 & 50-251/86-23 on 860401-04.Major Areas Inspected:Fitness for Duty & Employee Assistance Programs.Programs Do Not Meet Nuclear Industry Stds IR 05000250/19860131986-04-23023 April 1986 Insp Repts 50-250/86-13 & 50-251/86-13 on 860303-07. Violation Noted:Inadequately Supported Lube Water Piping IR 05000250/19860161986-03-18018 March 1986 Mgt Meeting Repts 50-250/86-16 & 50-251/86-16 on 860226. Major Areas Discussed:Select Sys Review Program & Milestones.Slide Presentation Encl IR 05000250/19860111986-02-24024 February 1986 Enforcement Conference Repts 50-250/86-11 & 50-251/86-11 on 860131.Violations Noted:Auxiliary Feedwater Limiting Condition for Operation Exceeded Due to Inadequate Mgt Controls IR 05000250/19850351985-11-15015 November 1985 Safeguards Insp Repts 50-250/85-35 & 50-251/85-35 on 851021-25.No Violations or Deviations Noted.Major Areas Inspected:Plan/Procedures,Organization,Records,Maint & Barriers.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850371985-08-22022 August 1985 Insp Repts 50-250/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Testing & Maint.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850201985-07-0303 July 1985 Insp Repts 50-250/85-20 & 50-251/85-20 on 850520-0610. Violation Noted:Failure to Implement Aspects of post- Maint,Preoperational Procedure & Failure to Establish Adequate Procedure for Loss of Vital Electrical Bus IR 05000250/19850191985-06-28028 June 1985 Insp Repts 50-250/85-19 & 50-251/85-19 on 850603-10.No Violation or Deviation Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Including Local & Integrated Leak Rate Test Procedures & Test Data IR 05000250/19850211985-06-19019 June 1985 Physical Security Insp Repts 50-250/85-21 & 50-251/85-21 on 850522-24 & 0604.Violation Noted:Failure to Implement Compensatory Measures Following Loss of Security Sys Effectiveness.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850171985-06-14014 June 1985 Insp Repts 50-250/85-17 & 50-251/85-17 on 850513-17. Noncompliance Noted:Failure to Package Low Specific Activity Matl for Transport in Strong,Tight Container IR 05000250/19840411985-02-0606 February 1985 Insp Repts 50-250/84-41 & 50-251/84-42 on 841217-21. Violation Noted:Failure to Establish Measures for Removing Uncalibr Instrument from Svc ML20129K1911984-09-27027 September 1984 Insp Repts 50-250/84-23 & 50-251/84-24 on 840715-0817. Violations Noted:Failure to Originate Operating Records, Perform Adequate Surveillance Test & Complete Unreviewed Safety Questions IR 05000250/19820271982-07-29029 July 1982 IE Safeguards Insp Repts 50-250/82-27 & 50-251/82-27 on 820712-16.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Security Organization & Personnel.Details Withheld (Ref 10CFR73.21) IR 05000250/19820251982-07-28028 July 1982 IE Insp Repts 50-250/82-25 & 50-251/82-25 on 820713-16.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Monitoring Mgt & Administrative Controls,Qc of Analytical Measurements & Monitoring Stations IR 05000250/19820231982-07-0101 July 1982 IE Insp Repts 50-250/82-23 & 50-251/82-23 on 820615-17.No Noncompliance Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping (IE Bulletin 79-14) & Pipe Support Baseplate Design (IE Bulletin 79-02) IR 05000250/19820191982-05-14014 May 1982 IE Insp Repts 50-250/82-19 & 50-251/82-19 on 820412-16. Noncompliance Noted:Failure to Continuously Sample for Radioiodines & Particulate Activity at Condenser Air Ejector Exhaust IR 05000250/19820211982-05-12012 May 1982 IE Insp Repts 50-250/82-21 & 50-251/82-21 on 820403-25. Noncompliance Noted:Failure to Follow Procedure,Failure to Meet Requirements of QA Manual & Failure to Maintain Updated Procedures IR 05000250/19820201982-04-26026 April 1982 IE Insp Repts 50-250/82-20 & 50-251/82-20 on 820226-0402. Noncompliance Noted:Failure to Implement & Maintain Administrative Control Procedures 1997-09-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists IR 05000250/19970021997-03-0707 March 1997 Partially Withheld Insp Repts 50-250/97-02 & 50-251/97-02 on 970203-07 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000250/19930201993-08-10010 August 1993 Insp Repts 50-250/93-20 & 50-251/93-20 on 930712-16. Violations Noted.Major Areas Inspected:Area of Electrical Maint IR 05000250/19920331992-12-23023 December 1992 Insp Repts 50-250/92-33 & 50-251/92-33 on 921130-1204.No Violations or Deviations Noted.Major Areas Inspected. Physical Barriers,Intrusion Detection Alarms,Communication & Training & Qualification Plan.Rept Partially Withheld IR 05000250/19910331991-08-29029 August 1991 Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted.Major Areas Inspected:Training & Surveillance Testing for Upgrade of Emergency Power Sys & Followup of Previously Identified Items IR 05000250/19910081991-04-18018 April 1991 Insp Repts 50-250/91-08 & 50-251/91-08 on 910225-0301. Violations Noted.Major Areas Inspected:Outage HP Acs, Employee Training & Qualifications,Personnel Exposure Monitoring & Assessments & Radioactive Matl IR 05000250/19910101991-04-12012 April 1991 Insp Repts 50-250/91-10 & 50-251/91-10 on 910304-08 & 18-22. No Violations Noted.Major Areas Inspected:Procedures,Work Activities & Quality Records Pertaining to Erection of Structural Steel in New Diesel Generator Bldg IR 05000250/19910061991-02-25025 February 1991 Partially Withheld Insp Repts 50-250/91-06 & 50-251/91-06 on 910128-0201.No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Protected Area Physical Barriers, Status of Security Upgrade Program & Packages & Vehicles IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures IR 05000250/19860461987-02-19019 February 1987 Insp Repts 50-250/86-46 & 50-251/86-46 on 861117-21.No Violations or Deviations Identified.Major Areas Inspected: Training IR 05000250/19870011987-02-12012 February 1987 Insp Repts 50-250/87-01 & 50-251/87-01 on 870126-30.No Violations or Deviations Identified.Major Areas Inspected: Seismic Analysis for as-built safety-related Piping Sys (IE Bulletin 79-14) & safety-related Pipe Supports ML20210T8461987-02-0505 February 1987 Partially Withheld Insp Repts 50-250/87-05 & 50-251/87-05 on 870120-21 (Ref 10CFR2.790(d) & 73.21).Violation Noted: Failure to Provide Positive Access Control to Vital Area IR 05000250/19860501987-02-0303 February 1987 Insp Repts 50-250/86-50 & 50-251/86-50 on 861215-870112.No Violations or Deviations Noted.Major Areas Inspected: Surveillance Testing,Maint Observations & Reviews & Operational Safety Reviews IR 05000250/19870041987-01-30030 January 1987 Insp Repts 50-250/87-04 & 50-251/87-04 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters,Housekeeping & Matl Identification & Control IR 05000250/19870031987-01-29029 January 1987 Insp Repts 50-250/87-03 & 50-251/87-03 on 870113-16.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Radiological Emergency Preparedness Exercise.Related Info Encl IR 05000250/19860451987-01-13013 January 1987 Insp Repts 50-250/86-45 & 50-251/86-45 on 861103-1215. Violations Noted:Failure to Meet Requirements of Tech Spec 6.8.1 Re Written Procedures & Administrative Policies & 10CFR50,App B,Criterion Xvi Re Corrective Actions IR 05000250/19860481987-01-0909 January 1987 Insp Repts 50-250/86-48 & 50-251/86-48 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters & Seismic Analysis for as-built safety-related Piping Sys IR 05000250/19860441987-01-0606 January 1987 Insp Repts 50-250/86-44 & 50-251/86-44 on 861117-21. Violations Noted:Failure to Evaluate Valve Mods for Unreviewed Safety Questions & Failure to Follow Pipe Support Procedures ML20209F3321986-08-22022 August 1986 Partially Withheld Insp Repts 50-250/86-32 & 50-251/86-32 on 860610 & 0818 (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Protected Area Barriers,Gates & Compensatory Measures.One Violation Noted IR 05000250/19860261986-08-12012 August 1986 Enforcement Conference Repts 50-250/86-26 & 50-251/86-26 on 860108 & 0217-0515.Violations Noted:Inadequate Corrective Actions Re Component Cooling Water Sys Valves 748A & B Failures & Intake Cooling Water Sys Failures IR 05000250/19860291986-07-29029 July 1986 Insp Repts 50-250/86-29 & 50-251/86-29 on 860428-0502.No Violations or Deviations Noted.Major Areas Inspected:Control & Distribution of Emergency Electrical Loads.Unresolved Item Re Emergency Diesel Generator Load Control Noted IR 05000250/19860301986-07-0202 July 1986 Insp Repts 50-250/86-30 & 50-251/86-30 on 860512-0609. Violation Noted:Failure to Properly Implement Operating Procedure for Steam Generator Protection Channels Per Tech Spec 6.8.1 IR 05000250/19860231986-04-29029 April 1986 Insp Repts 50-250/86-23 & 50-251/86-23 on 860401-04.Major Areas Inspected:Fitness for Duty & Employee Assistance Programs.Programs Do Not Meet Nuclear Industry Stds IR 05000250/19860131986-04-23023 April 1986 Insp Repts 50-250/86-13 & 50-251/86-13 on 860303-07. Violation Noted:Inadequately Supported Lube Water Piping IR 05000250/19860161986-03-18018 March 1986 Mgt Meeting Repts 50-250/86-16 & 50-251/86-16 on 860226. Major Areas Discussed:Select Sys Review Program & Milestones.Slide Presentation Encl IR 05000250/19860111986-02-24024 February 1986 Enforcement Conference Repts 50-250/86-11 & 50-251/86-11 on 860131.Violations Noted:Auxiliary Feedwater Limiting Condition for Operation Exceeded Due to Inadequate Mgt Controls IR 05000250/19850351985-11-15015 November 1985 Safeguards Insp Repts 50-250/85-35 & 50-251/85-35 on 851021-25.No Violations or Deviations Noted.Major Areas Inspected:Plan/Procedures,Organization,Records,Maint & Barriers.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850371985-08-22022 August 1985 Insp Repts 50-250/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Testing & Maint.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850201985-07-0303 July 1985 Insp Repts 50-250/85-20 & 50-251/85-20 on 850520-0610. Violation Noted:Failure to Implement Aspects of post- Maint,Preoperational Procedure & Failure to Establish Adequate Procedure for Loss of Vital Electrical Bus IR 05000250/19850191985-06-28028 June 1985 Insp Repts 50-250/85-19 & 50-251/85-19 on 850603-10.No Violation or Deviation Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Including Local & Integrated Leak Rate Test Procedures & Test Data IR 05000250/19850211985-06-19019 June 1985 Physical Security Insp Repts 50-250/85-21 & 50-251/85-21 on 850522-24 & 0604.Violation Noted:Failure to Implement Compensatory Measures Following Loss of Security Sys Effectiveness.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850171985-06-14014 June 1985 Insp Repts 50-250/85-17 & 50-251/85-17 on 850513-17. Noncompliance Noted:Failure to Package Low Specific Activity Matl for Transport in Strong,Tight Container IR 05000250/19840411985-02-0606 February 1985 Insp Repts 50-250/84-41 & 50-251/84-42 on 841217-21. Violation Noted:Failure to Establish Measures for Removing Uncalibr Instrument from Svc ML20129K1911984-09-27027 September 1984 Insp Repts 50-250/84-23 & 50-251/84-24 on 840715-0817. Violations Noted:Failure to Originate Operating Records, Perform Adequate Surveillance Test & Complete Unreviewed Safety Questions IR 05000250/19820271982-07-29029 July 1982 IE Safeguards Insp Repts 50-250/82-27 & 50-251/82-27 on 820712-16.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Security Organization & Personnel.Details Withheld (Ref 10CFR73.21) IR 05000250/19820251982-07-28028 July 1982 IE Insp Repts 50-250/82-25 & 50-251/82-25 on 820713-16.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Monitoring Mgt & Administrative Controls,Qc of Analytical Measurements & Monitoring Stations IR 05000250/19820231982-07-0101 July 1982 IE Insp Repts 50-250/82-23 & 50-251/82-23 on 820615-17.No Noncompliance Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping (IE Bulletin 79-14) & Pipe Support Baseplate Design (IE Bulletin 79-02) IR 05000250/19820191982-05-14014 May 1982 IE Insp Repts 50-250/82-19 & 50-251/82-19 on 820412-16. Noncompliance Noted:Failure to Continuously Sample for Radioiodines & Particulate Activity at Condenser Air Ejector Exhaust IR 05000250/19820211982-05-12012 May 1982 IE Insp Repts 50-250/82-21 & 50-251/82-21 on 820403-25. Noncompliance Noted:Failure to Follow Procedure,Failure to Meet Requirements of QA Manual & Failure to Maintain Updated Procedures IR 05000250/19820201982-04-26026 April 1982 IE Insp Repts 50-250/82-20 & 50-251/82-20 on 820226-0402. Noncompliance Noted:Failure to Implement & Maintain Administrative Control Procedures 1997-09-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists IR 05000250/19970021997-03-0707 March 1997 Partially Withheld Insp Repts 50-250/97-02 & 50-251/97-02 on 970203-07 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000250/19930201993-08-10010 August 1993 Insp Repts 50-250/93-20 & 50-251/93-20 on 930712-16. Violations Noted.Major Areas Inspected:Area of Electrical Maint IR 05000250/19920331992-12-23023 December 1992 Insp Repts 50-250/92-33 & 50-251/92-33 on 921130-1204.No Violations or Deviations Noted.Major Areas Inspected. Physical Barriers,Intrusion Detection Alarms,Communication & Training & Qualification Plan.Rept Partially Withheld IR 05000250/19910331991-08-29029 August 1991 Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted.Major Areas Inspected:Training & Surveillance Testing for Upgrade of Emergency Power Sys & Followup of Previously Identified Items IR 05000250/19910081991-04-18018 April 1991 Insp Repts 50-250/91-08 & 50-251/91-08 on 910225-0301. Violations Noted.Major Areas Inspected:Outage HP Acs, Employee Training & Qualifications,Personnel Exposure Monitoring & Assessments & Radioactive Matl IR 05000250/19910101991-04-12012 April 1991 Insp Repts 50-250/91-10 & 50-251/91-10 on 910304-08 & 18-22. No Violations Noted.Major Areas Inspected:Procedures,Work Activities & Quality Records Pertaining to Erection of Structural Steel in New Diesel Generator Bldg IR 05000250/19910061991-02-25025 February 1991 Partially Withheld Insp Repts 50-250/91-06 & 50-251/91-06 on 910128-0201.No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Protected Area Physical Barriers, Status of Security Upgrade Program & Packages & Vehicles IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures IR 05000250/19860461987-02-19019 February 1987 Insp Repts 50-250/86-46 & 50-251/86-46 on 861117-21.No Violations or Deviations Identified.Major Areas Inspected: Training IR 05000250/19870011987-02-12012 February 1987 Insp Repts 50-250/87-01 & 50-251/87-01 on 870126-30.No Violations or Deviations Identified.Major Areas Inspected: Seismic Analysis for as-built safety-related Piping Sys (IE Bulletin 79-14) & safety-related Pipe Supports ML20210T8461987-02-0505 February 1987 Partially Withheld Insp Repts 50-250/87-05 & 50-251/87-05 on 870120-21 (Ref 10CFR2.790(d) & 73.21).Violation Noted: Failure to Provide Positive Access Control to Vital Area IR 05000250/19860501987-02-0303 February 1987 Insp Repts 50-250/86-50 & 50-251/86-50 on 861215-870112.No Violations or Deviations Noted.Major Areas Inspected: Surveillance Testing,Maint Observations & Reviews & Operational Safety Reviews IR 05000250/19870041987-01-30030 January 1987 Insp Repts 50-250/87-04 & 50-251/87-04 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters,Housekeeping & Matl Identification & Control IR 05000250/19870031987-01-29029 January 1987 Insp Repts 50-250/87-03 & 50-251/87-03 on 870113-16.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Radiological Emergency Preparedness Exercise.Related Info Encl IR 05000250/19860451987-01-13013 January 1987 Insp Repts 50-250/86-45 & 50-251/86-45 on 861103-1215. Violations Noted:Failure to Meet Requirements of Tech Spec 6.8.1 Re Written Procedures & Administrative Policies & 10CFR50,App B,Criterion Xvi Re Corrective Actions IR 05000250/19860481987-01-0909 January 1987 Insp Repts 50-250/86-48 & 50-251/86-48 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters & Seismic Analysis for as-built safety-related Piping Sys IR 05000250/19860441987-01-0606 January 1987 Insp Repts 50-250/86-44 & 50-251/86-44 on 861117-21. Violations Noted:Failure to Evaluate Valve Mods for Unreviewed Safety Questions & Failure to Follow Pipe Support Procedures ML20209F3321986-08-22022 August 1986 Partially Withheld Insp Repts 50-250/86-32 & 50-251/86-32 on 860610 & 0818 (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Protected Area Barriers,Gates & Compensatory Measures.One Violation Noted IR 05000250/19860261986-08-12012 August 1986 Enforcement Conference Repts 50-250/86-26 & 50-251/86-26 on 860108 & 0217-0515.Violations Noted:Inadequate Corrective Actions Re Component Cooling Water Sys Valves 748A & B Failures & Intake Cooling Water Sys Failures IR 05000250/19860291986-07-29029 July 1986 Insp Repts 50-250/86-29 & 50-251/86-29 on 860428-0502.No Violations or Deviations Noted.Major Areas Inspected:Control & Distribution of Emergency Electrical Loads.Unresolved Item Re Emergency Diesel Generator Load Control Noted IR 05000250/19860301986-07-0202 July 1986 Insp Repts 50-250/86-30 & 50-251/86-30 on 860512-0609. Violation Noted:Failure to Properly Implement Operating Procedure for Steam Generator Protection Channels Per Tech Spec 6.8.1 IR 05000250/19860231986-04-29029 April 1986 Insp Repts 50-250/86-23 & 50-251/86-23 on 860401-04.Major Areas Inspected:Fitness for Duty & Employee Assistance Programs.Programs Do Not Meet Nuclear Industry Stds IR 05000250/19860131986-04-23023 April 1986 Insp Repts 50-250/86-13 & 50-251/86-13 on 860303-07. Violation Noted:Inadequately Supported Lube Water Piping IR 05000250/19860161986-03-18018 March 1986 Mgt Meeting Repts 50-250/86-16 & 50-251/86-16 on 860226. Major Areas Discussed:Select Sys Review Program & Milestones.Slide Presentation Encl IR 05000250/19860111986-02-24024 February 1986 Enforcement Conference Repts 50-250/86-11 & 50-251/86-11 on 860131.Violations Noted:Auxiliary Feedwater Limiting Condition for Operation Exceeded Due to Inadequate Mgt Controls IR 05000250/19850351985-11-15015 November 1985 Safeguards Insp Repts 50-250/85-35 & 50-251/85-35 on 851021-25.No Violations or Deviations Noted.Major Areas Inspected:Plan/Procedures,Organization,Records,Maint & Barriers.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850371985-08-22022 August 1985 Insp Repts 50-250/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Testing & Maint.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850201985-07-0303 July 1985 Insp Repts 50-250/85-20 & 50-251/85-20 on 850520-0610. Violation Noted:Failure to Implement Aspects of post- Maint,Preoperational Procedure & Failure to Establish Adequate Procedure for Loss of Vital Electrical Bus IR 05000250/19850191985-06-28028 June 1985 Insp Repts 50-250/85-19 & 50-251/85-19 on 850603-10.No Violation or Deviation Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Including Local & Integrated Leak Rate Test Procedures & Test Data IR 05000250/19850211985-06-19019 June 1985 Physical Security Insp Repts 50-250/85-21 & 50-251/85-21 on 850522-24 & 0604.Violation Noted:Failure to Implement Compensatory Measures Following Loss of Security Sys Effectiveness.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850171985-06-14014 June 1985 Insp Repts 50-250/85-17 & 50-251/85-17 on 850513-17. Noncompliance Noted:Failure to Package Low Specific Activity Matl for Transport in Strong,Tight Container IR 05000250/19840411985-02-0606 February 1985 Insp Repts 50-250/84-41 & 50-251/84-42 on 841217-21. Violation Noted:Failure to Establish Measures for Removing Uncalibr Instrument from Svc ML20129K1911984-09-27027 September 1984 Insp Repts 50-250/84-23 & 50-251/84-24 on 840715-0817. Violations Noted:Failure to Originate Operating Records, Perform Adequate Surveillance Test & Complete Unreviewed Safety Questions IR 05000250/19820271982-07-29029 July 1982 IE Safeguards Insp Repts 50-250/82-27 & 50-251/82-27 on 820712-16.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Security Organization & Personnel.Details Withheld (Ref 10CFR73.21) IR 05000250/19820251982-07-28028 July 1982 IE Insp Repts 50-250/82-25 & 50-251/82-25 on 820713-16.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Monitoring Mgt & Administrative Controls,Qc of Analytical Measurements & Monitoring Stations IR 05000250/19820231982-07-0101 July 1982 IE Insp Repts 50-250/82-23 & 50-251/82-23 on 820615-17.No Noncompliance Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping (IE Bulletin 79-14) & Pipe Support Baseplate Design (IE Bulletin 79-02) IR 05000250/19820191982-05-14014 May 1982 IE Insp Repts 50-250/82-19 & 50-251/82-19 on 820412-16. Noncompliance Noted:Failure to Continuously Sample for Radioiodines & Particulate Activity at Condenser Air Ejector Exhaust IR 05000250/19820211982-05-12012 May 1982 IE Insp Repts 50-250/82-21 & 50-251/82-21 on 820403-25. Noncompliance Noted:Failure to Follow Procedure,Failure to Meet Requirements of QA Manual & Failure to Maintain Updated Procedures IR 05000250/19820201982-04-26026 April 1982 IE Insp Repts 50-250/82-20 & 50-251/82-20 on 820226-0402. Noncompliance Noted:Failure to Implement & Maintain Administrative Control Procedures 1997-09-26
[Table view] Category:UTILITY
MONTHYEARIR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures IR 05000250/19860461987-02-19019 February 1987 Insp Repts 50-250/86-46 & 50-251/86-46 on 861117-21.No Violations or Deviations Identified.Major Areas Inspected: Training IR 05000250/19870011987-02-12012 February 1987 Insp Repts 50-250/87-01 & 50-251/87-01 on 870126-30.No Violations or Deviations Identified.Major Areas Inspected: Seismic Analysis for as-built safety-related Piping Sys (IE Bulletin 79-14) & safety-related Pipe Supports ML20210T8461987-02-0505 February 1987 Partially Withheld Insp Repts 50-250/87-05 & 50-251/87-05 on 870120-21 (Ref 10CFR2.790(d) & 73.21).Violation Noted: Failure to Provide Positive Access Control to Vital Area IR 05000250/19860501987-02-0303 February 1987 Insp Repts 50-250/86-50 & 50-251/86-50 on 861215-870112.No Violations or Deviations Noted.Major Areas Inspected: Surveillance Testing,Maint Observations & Reviews & Operational Safety Reviews IR 05000250/19870041987-01-30030 January 1987 Insp Repts 50-250/87-04 & 50-251/87-04 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters,Housekeeping & Matl Identification & Control IR 05000250/19870031987-01-29029 January 1987 Insp Repts 50-250/87-03 & 50-251/87-03 on 870113-16.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Radiological Emergency Preparedness Exercise.Related Info Encl IR 05000250/19860451987-01-13013 January 1987 Insp Repts 50-250/86-45 & 50-251/86-45 on 861103-1215. Violations Noted:Failure to Meet Requirements of Tech Spec 6.8.1 Re Written Procedures & Administrative Policies & 10CFR50,App B,Criterion Xvi Re Corrective Actions IR 05000250/19860481987-01-0909 January 1987 Insp Repts 50-250/86-48 & 50-251/86-48 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters & Seismic Analysis for as-built safety-related Piping Sys IR 05000250/19860441987-01-0606 January 1987 Insp Repts 50-250/86-44 & 50-251/86-44 on 861117-21. Violations Noted:Failure to Evaluate Valve Mods for Unreviewed Safety Questions & Failure to Follow Pipe Support Procedures ML20209F3321986-08-22022 August 1986 Partially Withheld Insp Repts 50-250/86-32 & 50-251/86-32 on 860610 & 0818 (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Protected Area Barriers,Gates & Compensatory Measures.One Violation Noted IR 05000250/19860261986-08-12012 August 1986 Enforcement Conference Repts 50-250/86-26 & 50-251/86-26 on 860108 & 0217-0515.Violations Noted:Inadequate Corrective Actions Re Component Cooling Water Sys Valves 748A & B Failures & Intake Cooling Water Sys Failures IR 05000250/19860291986-07-29029 July 1986 Insp Repts 50-250/86-29 & 50-251/86-29 on 860428-0502.No Violations or Deviations Noted.Major Areas Inspected:Control & Distribution of Emergency Electrical Loads.Unresolved Item Re Emergency Diesel Generator Load Control Noted IR 05000250/19860301986-07-0202 July 1986 Insp Repts 50-250/86-30 & 50-251/86-30 on 860512-0609. Violation Noted:Failure to Properly Implement Operating Procedure for Steam Generator Protection Channels Per Tech Spec 6.8.1 IR 05000250/19860231986-04-29029 April 1986 Insp Repts 50-250/86-23 & 50-251/86-23 on 860401-04.Major Areas Inspected:Fitness for Duty & Employee Assistance Programs.Programs Do Not Meet Nuclear Industry Stds IR 05000250/19860131986-04-23023 April 1986 Insp Repts 50-250/86-13 & 50-251/86-13 on 860303-07. Violation Noted:Inadequately Supported Lube Water Piping IR 05000250/19860161986-03-18018 March 1986 Mgt Meeting Repts 50-250/86-16 & 50-251/86-16 on 860226. Major Areas Discussed:Select Sys Review Program & Milestones.Slide Presentation Encl IR 05000250/19860111986-02-24024 February 1986 Enforcement Conference Repts 50-250/86-11 & 50-251/86-11 on 860131.Violations Noted:Auxiliary Feedwater Limiting Condition for Operation Exceeded Due to Inadequate Mgt Controls IR 05000250/19850351985-11-15015 November 1985 Safeguards Insp Repts 50-250/85-35 & 50-251/85-35 on 851021-25.No Violations or Deviations Noted.Major Areas Inspected:Plan/Procedures,Organization,Records,Maint & Barriers.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850371985-08-22022 August 1985 Insp Repts 50-250/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Testing & Maint.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850201985-07-0303 July 1985 Insp Repts 50-250/85-20 & 50-251/85-20 on 850520-0610. Violation Noted:Failure to Implement Aspects of post- Maint,Preoperational Procedure & Failure to Establish Adequate Procedure for Loss of Vital Electrical Bus IR 05000250/19850191985-06-28028 June 1985 Insp Repts 50-250/85-19 & 50-251/85-19 on 850603-10.No Violation or Deviation Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Including Local & Integrated Leak Rate Test Procedures & Test Data IR 05000250/19850211985-06-19019 June 1985 Physical Security Insp Repts 50-250/85-21 & 50-251/85-21 on 850522-24 & 0604.Violation Noted:Failure to Implement Compensatory Measures Following Loss of Security Sys Effectiveness.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000250/19850171985-06-14014 June 1985 Insp Repts 50-250/85-17 & 50-251/85-17 on 850513-17. Noncompliance Noted:Failure to Package Low Specific Activity Matl for Transport in Strong,Tight Container IR 05000250/19840411985-02-0606 February 1985 Insp Repts 50-250/84-41 & 50-251/84-42 on 841217-21. Violation Noted:Failure to Establish Measures for Removing Uncalibr Instrument from Svc ML20129K1911984-09-27027 September 1984 Insp Repts 50-250/84-23 & 50-251/84-24 on 840715-0817. Violations Noted:Failure to Originate Operating Records, Perform Adequate Surveillance Test & Complete Unreviewed Safety Questions IR 05000250/19820271982-07-29029 July 1982 IE Safeguards Insp Repts 50-250/82-27 & 50-251/82-27 on 820712-16.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Security Organization & Personnel.Details Withheld (Ref 10CFR73.21) IR 05000250/19820251982-07-28028 July 1982 IE Insp Repts 50-250/82-25 & 50-251/82-25 on 820713-16.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Monitoring Mgt & Administrative Controls,Qc of Analytical Measurements & Monitoring Stations IR 05000250/19820231982-07-0101 July 1982 IE Insp Repts 50-250/82-23 & 50-251/82-23 on 820615-17.No Noncompliance Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping (IE Bulletin 79-14) & Pipe Support Baseplate Design (IE Bulletin 79-02) IR 05000250/19820191982-05-14014 May 1982 IE Insp Repts 50-250/82-19 & 50-251/82-19 on 820412-16. Noncompliance Noted:Failure to Continuously Sample for Radioiodines & Particulate Activity at Condenser Air Ejector Exhaust IR 05000250/19820211982-05-12012 May 1982 IE Insp Repts 50-250/82-21 & 50-251/82-21 on 820403-25. Noncompliance Noted:Failure to Follow Procedure,Failure to Meet Requirements of QA Manual & Failure to Maintain Updated Procedures IR 05000250/19820201982-04-26026 April 1982 IE Insp Repts 50-250/82-20 & 50-251/82-20 on 820226-0402. Noncompliance Noted:Failure to Implement & Maintain Administrative Control Procedures 1989-09-21
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists ML20149E5981997-03-20020 March 1997 Partially Deleted Investigation Rept 2-96-027 on 970320.No Noncompliance Noted.Major Areas Investigated:Allegation Re Discrimination Against I&C Technician for Raising Safety Concern Re Calibr of Test Equipment IR 05000250/19970021997-03-0707 March 1997 Partially Withheld Insp Repts 50-250/97-02 & 50-251/97-02 on 970203-07 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20136E5151997-03-0707 March 1997 Partially Withheld NOV on 970203-07 (Ref 10CFR73.21). Violations Noted:Employee Denied Unescorted Access & Was Not Provided Opportunity for Review of Info on Which Denial of Access Authorization Was Based PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure1993-10-0101 October 1993 PNO-II-93-052:on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure PNO-II-93-040, on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified1993-08-25025 August 1993 PNO-II-93-040:on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified ML20056E6661993-08-12012 August 1993 Notice of Violation from Insp on 930712-16.Violations Noted: Work Procedure Used for Overhaul of 3B Charging Pump & Pull of Motor Lead Cables Inadequate to Assure Important Activities Satisfactorily Accomplished IR 05000250/19930201993-08-10010 August 1993 Insp Repts 50-250/93-20 & 50-251/93-20 on 930712-16. Violations Noted.Major Areas Inspected:Area of Electrical Maint PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 9306131993-06-10010 June 1993 PNO-II-93-025:on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 IR 05000250/19920331992-12-23023 December 1992 Insp Repts 50-250/92-33 & 50-251/92-33 on 921130-1204.No Violations or Deviations Noted.Major Areas Inspected. Physical Barriers,Intrusion Detection Alarms,Communication & Training & Qualification Plan.Rept Partially Withheld PNO-II-92-055C, on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled1992-09-0303 September 1992 PNO-II-92-055C:on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew1992-08-31031 August 1992 PNO-II-92-055B:on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request1992-08-27027 August 1992 PNO-II-92-055A:on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request PNO-II-92-055, on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified1992-08-24024 August 1992 PNO-II-92-055:on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified IR 05000250/19910331991-08-29029 August 1991 Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted.Major Areas Inspected:Training & Surveillance Testing for Upgrade of Emergency Power Sys & Followup of Previously Identified Items ML20138F6711991-04-18018 April 1991 Notice of Violation from Insp on 910225-0301.Violation Noted:On 910225-26,licensee Failed to Follow Procedures for Labeling Resin Liners Having Contact Dose Rates Exceeding 1.5 Mrem/Hr Which Were Maintained in Storage Area IR 05000250/19910081991-04-18018 April 1991 Insp Repts 50-250/91-08 & 50-251/91-08 on 910225-0301. Violations Noted.Major Areas Inspected:Outage HP Acs, Employee Training & Qualifications,Personnel Exposure Monitoring & Assessments & Radioactive Matl IR 05000250/19910101991-04-12012 April 1991 Insp Repts 50-250/91-10 & 50-251/91-10 on 910304-08 & 18-22. No Violations Noted.Major Areas Inspected:Procedures,Work Activities & Quality Records Pertaining to Erection of Structural Steel in New Diesel Generator Bldg IR 05000250/19910061991-02-25025 February 1991 Partially Withheld Insp Repts 50-250/91-06 & 50-251/91-06 on 910128-0201.No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Protected Area Physical Barriers, Status of Security Upgrade Program & Packages & Vehicles ML20059N3511990-09-21021 September 1990 Notice of Violation from Insp on 900804-31.Violation Noted: Administrative Policies Not Established to Control Changes to Master Instrument Calibr Data Sheet for Component Cooling Water Pump Automatic Start Pressure Switch PNO-II-90-039, on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const1990-07-23023 July 1990 PNO-II-90-039:on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info ML20235U2121989-02-24024 February 1989 Notice of Violation from Insp on 890117-20.Violation Noted: Licensee Failed to Promptly Classify Event Involving Unit 3 RCS Leakage Greater than 50 Gpm & to Make Timely Notification to State of Fl & NRC IR 05000250/19880151988-11-18018 November 1988 Corrected Pages to SALP Repts 50-250/88-15 & 50-251/88-15 for June 1987 - June 1988 PNO-II-88-030A, on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False1988-05-17017 May 1988 PNO-II-88-030A:on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed1988-04-19019 April 1988 PNO-II-88-027:on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed ML20196B8921988-02-0808 February 1988 EN-88-008:on 880211,notice of Proposed Imposition of Civil Penalty in Amount of $150,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Multiple Failures to Maintain Positive Access Control PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-81988-01-15015 January 1988 PNO-II-88-005:on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 ML20236J9531987-11-0505 November 1987 EN-87-060A:on 871105,order Imposing Civil Penalty in Amount of $75,000 Issued to Licensee Based on Two Violations Re Access Control & Search.Nrc Concluded That Violation Did Occur Following Review of Util 870826 Response PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing1987-10-28028 October 1987 PNO-II-87-075:on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing PNO-II-87-074, on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls1987-10-26026 October 1987 PNO-II-87-074:on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls ML20236A1511987-10-15015 October 1987 EN-87-086:on 871019,order & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $225,000 Will Be Issued Based on Loss of Emergency Boration Flow Paths & Failure of Personnel to Follow Procedures PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-062, on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls1987-09-29029 September 1987 PNO-II-87-062:on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls ML20236D7571987-07-23023 July 1987 EN-87-060:on 870728,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued.Action Based on Violations Re Failure to Maintain Positive Access Control Over Personnel & Equipment ML20236D4291987-07-16016 July 1987 EN-87-057:on 870721,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000 Will Be Issued Based on Licensee Failure to Take Prompt Corrective Action for Reactor Coolant Leak IR 05000250/19870161987-05-19019 May 1987 PNO-II-87-030:updating PNO-II-87-019 & PNO-II-87-019A. Augmented Insp Team Repts 50-250/87-16 & 50-251/87-16 on Boric Acid Leakage & Buildup Problem Issued on 870515.Loss of Offsite Power Test Scheduled for 870520 ML20213A7261987-04-16016 April 1987 EN-87-032:on or About 870421,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued for Licenses.Action Based on Violations of Physical Security Plan Involving Sleeping Guard & Unescorted Visitor PNO-II-87-024, on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees1987-04-0909 April 1987 PNO-II-87-024:on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc1987-03-24024 March 1987 PNO-II-87-017:media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp1987-03-23023 March 1987 PNO-II-87-019A:on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted1987-03-20020 March 1987 PNO-II-87-020:on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors ML20207T7141987-03-11011 March 1987 Notice of Violation from Insp on 870112-0209 IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures ML20207T4441987-02-20020 February 1987 Accelerated Requalification Exam Rept 50-250/OL-86-05 on 861215-17.Exam Results:Three of Eight Senior Reactor Operators Passed.Exam Questions & Answer Key & Util Comments Encl 1997-09-26
[Table view] |
Text
- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ .
~,.
o UNITE 3 STATES
,
- g Mo NUCLEAR REIULATORY COMMISSION
.h o,$
-
REolON11 8 E - 101 MARIETTA STREET, # ATLANTA, GEORGIA 30303
Report Nos.: 50-250/84-41 and 50-251/84-42 Licensee: Florida Power and Light Company -
9250 West Flagler Street-Miami,-FL 33101
Docket Nos.: 50-250 and 50-251 License Nos.: DPR-31 and DPR-41
'
Facility Name: Turkey Point 3 and 4 Inspection Conducted: December 17-21, 1984 Inspector: Md/ Ad '
2. /4 / %5'-
C . SMth"' D(te Signed >
Approved by: M/f/f 2 f C.~M.UprighffSecffonChief ITatafSigned Division of Keact6f Safety
- . SUMMARY Scope
- This routine unannounced inspection involved 33 inspector-hours on site in the areas of Licensee Action on Previous Enforcement Matters, Surveillance Testing and Calibration Control Program, Test and Measurement Equipment Program, and Licensee Action on Previously Indentified Inspection Finding .
-
Of the four areas inspected, no violations or - deviations were
.'identified Re sul in ts:three areas;- one apparent violation was found in one area (Failure to Establish Measures for Removing Uncalibrated Instruments From Service). i
/
f g5200644850404 o ADOCK 05000250 PDR
'
.&
m i
. *
-
.
REPORT DETAILS . Licensee Employees Contacted
- J. Arias, Jr., Regulatory Compliance Supervisor J. Ferrare, QA Engineer B. Gorodetzer, QC Electrical I&C Supervisor
- K. Harris, Vice President-Turkey Point Plant
-
J. Kenny,. Mechanical Maintenance Supervisor D. Henry, QCSE W. Highfoot, System Performance Tech Dep *J. Kappes, Maintenance Supervisor C. Haughabrook, I&C Specialist
- J. Labarraque, Technical-Department Supervisor
- R. Longtemps, Mechanical Maintenance Supervisor F. Martone, Mechanical Maintenance Coordinator S. Matalosy, Electrical Maintenance J. Mosesso, I&C Specialist R. Reinhardt, QC Operations Inspection Supervisor H.-Schneider, Electrical Maintenance R. Sontag, I&C Measuring & Test Equipment Supervisor M. Wayland, Electrical Measuring & Test Equipment Supervisor W. Williams, Jr., Electrical Maintenance Asst. Superintendent NRC Resident Inspectors
-
T. Peebles, Senior Resident Inspector
- D. Brewer, Resident Inspector
- Attended exit interview Exit Interview
..
The inspection scope and findings were summarized on December 21, 1984, with those persons indicated in paragraph 1 above. The licensee acknowledged the following inspection result:
Violation, Failure to Establish Measures for Removing Uncalibrated Instruments From Service, paragraph Inability to perform surveillance of the Post Accident Hydrogen Monitoring (PAHM) system was initially identified as an Inspector Followup Ite Subsequent discussions between NRC staff and licensee management has resolved this issue by establishing temporary measures to perform the surveillance within the TS perio _- _ _ _ _
. .
-
.
l
! Licensee Action on Previous Enforcement Matters (Closed)~ Severity Level IV Violation (250, 251/83 ~.3-01): Response to Audit Findings are not Completely Adequat The licensee response - dated July 20, 1983, was considered acceptable by Region II. ~ The ' inspector reviewed Quality Assurance Procedure QP 16.1, which was revised. March 7,1984, in response to the violation. The revised-procedure paragraph 5.5, Corrective Actions for Audits Conducted by the .
Quality. Assurance Department, delineates the requirements for responses from audited ' organizations. Additionally, requirements for the scheduling of corrective actions-have been addressed in paragraph The inspector concluded that the licensee had determined the full extent of
. the violation, taken action to correct current conditions, and developed corrective actions needed to preclude recurrence of similar probels Corrective actions stated in the licensee response have been implemente (Closed) Severity Level IV Violation (250, 251/83-36-01): Failure to provide procedures to assure purchased materials meet or exceed original requirements; resolve differences between staff relative to safety classi-fication The licensee response dated January 23, 1984, was considered acceptable by Region II. The inspector reviewed Quality Assurance procedure QP 4.1 which was revised May 24, 1984, in response to the violation. This procedure assigns responsibility to the Plant QC Supervisor for specifying the quality level of items which are consistent with the original requirements or as modified by design related document. Additional requirements are delineated throughout the body of the procedure. Administrative procedure AP 0190.4, Procurement Document Control, last revised on November 21, 1984, also addresses the requirements in paragraphs 5.1.8, 8.4.1.3 and Appendix B to assure that replacement parts are at least equal to the origina The inspector concluded that the licensee had determined the full extent of the violation, taken action to correct current conditions, and developed corrective actions needed to preclude recurrence of similar problem Corrective actions stated in the licensee response have been implemente (Closed) Severity Level V Violation (250, 251/82-07-01): Failure to include acceptance criteria in a maintenance procedur The licensee response dated May 17, 1982, was considered acceptable by Region II. The inspector reviewed maintenance procedure 1207.1, Pressurizer Safety Valve Repair, Test and Setting, wherein Step 9.14.21 delineates the quantitative values for torquing the pressurizer safety valve inlet flange bolts. The flange bolting criteria calls for tightening the bolts to obtain an even compression of the gasket. The basis for this criteria is that the
,
_ _ - _ _ _ _ _ _ _ - - - - - - -
r
. *
,
-
.
outlet flange does not constitute a high energy barrier, because the outlet side'of the Pressurizer Safety Valve is not safety-related. Step 9.14.21 of MP 1207.1 specifies the size of the impact wrench and the approximate torque to be applie The inspector concluded that the licensee had determined the full extent of the violation, taken action to correct current conditions, and developed corrective actions needed to preclude recurrence of similar problem Corrective actions stated in the licensee response have been implemente . Unresolved Items Unresolved items were not identified during this inspectio . Surveillance Testing and Calibration Program (61725)
References (a) 10 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (b) Regulatory Guide - 1.33, Quality Assurance Program Requirements (Operations), Revision 2 (c) ANSI N13.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (d) Technical Specifications, Section 4 and 6 (e) Topical Quality Assurance Report, TQR 11.0, Test Control, Revision 1 The inspector reviewed the licensee surveillance testing and calibra-tion control program required by references (a) through (e) to verify that it had been established in accordance. with regulatory require-ments, industry guides and standards, and Technical Specification The following criteria were' used during this review to determine the overall acceptability of the established progra A master schedule for surveillance testing and calibration has a been established which includes: frequency; responsibilities for performance; and testing statu The master schedule has been updated to reflect Technical Specification or license revisions.
L
'
-
Responsibilities have been assigned to maintain this schedule up-to-date.
<
>-
. .
.
.
-
' Requirements have been established -for conducting surveillance testing in accordance with approved procedures which include appropriate acceptable criteri Responsibilities have been assigned for review and evaluation of test dat Responsibilities have been assigned for assuring that required schedules for surveillance are satisfie .'he inspector also verified that similar controls have been established for calibration of instrumentation not specifically identified in Technical Specifications. The documents listed below were reviewed to verify that these criteria had been incorporated into surveillance testing and calibration control activitie OP 0204.2, Schedule of Periodic Tests, Checks, and Operating Evolutions, dated October 24, 1984 QP 12.2, Calibration Control of Installed Plant Instrumentation and Control Equipment, dated July 15. 1977 AP190.16, Scheduling and Surveillance of Periodic Tests and Checks Required by Technical Specification, dated August 19, 1982 AP190.73, Quality Control Surveillance Program, dated August 3, 1983 )
AP 190.19, Control of Maintenance on Nuclear Safety Related and Fire Protection System dated March 24, 1984 AP 0103.18, Facility Operating License Amendment and/or Changes, dated August 29, 1984 AP 0103.18, Facility Operating License Amendment and/or Changes, dated August 29, 1984 AP 0190.27, Electrical Department Installed Instrument Calibration Program, dated September 26, 1979 j OP 0209.1, Valve Exercising Procedure, dated September 28, 1984
'
AP 0190.26, Calibration Control of Installed Nuclear Safety Related Instrumentation and Control Equipment, dated October 24, 1984 The inrpector interviewed QC personnel and reviewed several surveil-lance reports of activities conducted by the Instrumentation and Control (I&C) department. The follo, wing surveillance reports and findings were reviewed by the inspector.
E
_ _
_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _
'
. ..
,
-
.
,
'
QC Surveillance Report'84-3240, Steam Ge'nerator Protection Channel Periodic Test, dated December- 13, 1984 QC Surveillance Report 84-3134, Source Range Instrumentation
' Adjustments, dated November 26,'1984 QC Surveillance Report 83-3111, Tavg and AT Control Loop Calibra-tion Check and Adjustments The inspector interviewed licensee personnel within the Technical Department to verify that inservice inspaction and testing of pumps and
- valves as required by 10 'CFR 50.55a(g) are performed. The inspector-
.
reviewed the following documents in connection with this program:
FP&L letter number -L-84-84, dated ' March 30,. 1984, from J. W. Williams, Jr. , Gre;p Vice President Nuclear Energy to D. G. Eisenhut, Director, Division of Licensing, NRC, Subject:
Revisions to Inservice Test Program for-Pumps and Valve FP&L letter number L-84-190, dated July 26, 1984, from J. W. Williams, Jr. , Group Vice President Nuclear Energy to D. G. Eisenhut, -Director, Division of Licensing, NRC, Subject:
Revisions to Inservice Test Program for Pumps and Valve Letter from Steven A. Varga, Branch Chief, Operating Reactors Branch #1, Division of Licensing, to J. W. Williams, Jr. , Vice President Nuclear Energy Department, FP&L, dated August 17, 1984, Subject: Inservice Inspection - Second 10 Year Summary Progra The inspector determined that .the licensee is - conducting inservice inspection and testing of pumps and . valves. This program has not yet received final approval from the Division of Licensing, Office of Nuclear Reactor Regulation. The following procedures were reviewed by the inspector:
Cperating Procedure 3104.1, Component Cooling Water System -
Periodic Test of Pump, dated October 30, 1984 Operating Procedure 3204.1, Residual Heat Removal System -
Periodic Test, dated September 18, 1984 Operating Procedure 4004.1, Containment Spray Pumps - Periodic Test, dated September 18, 1984 The inspector interviewed licensee personnel to verify that TS amendments are incorporated within the surveillance testing and calibration progra The inspector determined that AP 0103.18'
delineates the administratve controls which ensure proper plant review,'
approval and implementation of license amendments and/or TS change e
. .
-
.
L License TS was amended pursuant to the issue of Amendment No.110
,
to Facility Operating License No. DPR-31, and Amendment llo.104 to Facility Operating License No. DPR-41. These amendments. revised the-TS for the TMI- items in - response to generic letter 83-37, and became effective on December 17, 1984. The inspector verified implementation of the administrative controls delineated in AP0103.18 relative to the incorporation of the following items in the surveillance testing and calibration program:
Containment High-Range Radiation Monitor Containment Pressure Monitor Containment Water Level Monitor Containment Hydroge'n Monitor
.The inspector verified that implementing procedures for conduct of the TS required activities had been prepared, and the activities had been -
incorporated in licensee surveillance testing and calibration progra The . inspector reviewed the following documents in connection with TS
. amendment numbers 110 and 10 ;(1) FP&L Interoffice correspondence from J. A. Labarraque to S. G. Brian,-dated December 6, 1983 (2) FP&L interoffice correspondnece from J. A. Labarraque to J. P. Mendieta, dated June 8, 1984, Title: Calibration Flowpath Addition to PAHM AE-3-6307A and AE-3-6307B (3) FP&L interoffice correspondence from C. J. Baker to J. P. Mendieta, dated (none), Subject: Implementation of Attached PC/M 84-10 (4) Letter from Daniel G. Mcdonald, Jr., Project Manager, Operating Reactors Branch #1, Division of Licensing, NRC, to Mr. J. W. Williams, Jr. , Vice President, Nuclear Energy i
Department, FP&L, dated October- 17, 198 (5) FP&L Letter number L-84-329 from J. W. Williams, Jr. , Group Vice President Nuclear Energy Department to Mr. J. P. O'Reilly, Regional Administrator, Region II, NR In reference number 1, the licensee identified an inability to perform calibration . testing of the Post Accident Hydrogen Monitoring (PAHM)
System during normal power operation. This inability is caused by the
!
need to maintain containment integrity and isolation in accordance with the TS requirements. Reference 1 further states that the Post Accident Sampling System (PASS) is similarly affected by the TS constraints, and in addition, the Post Accident Containment Ventilation (PACV) System cannot be run to perform operational checks and trouble shooting tasks during normal operation.
t-
-
'- -
.
. *
References 2-and 3 address the preparation.and implementation of Plant-Change / Modification (PC/M) No.84-101 intended to provide a calibration flow path addition to Post Accident Hydrogen Monitors AE-3-6307A
- and AE3-63078. . This PC/M was prepared specifically for Unit 3. The inspector was informed that the implementation of this PC/M would enable the surveillance requirements of TS Table 4.1-1 to be performed for the containment hydrogen monitors, without the breaching of containment integrit The inspector reviewed the following P& ids:
Dwg #5610-T-E-4534, Post Accident Containment Vent and Sampling System,. Revision 5 Dwg # JPE-M-84-101/102-002, Turkey Point Unit 3 and 4 Calibration Flow Path Addition to PAHMs, Revision 1 Dwg # 5610-M-381, Hydrogen Analyzer Calibration Gas Supply These drawings showed the modifications to be made to the PAHM -system via the' implementation of PC/M 84101/102 for Units 3 and 4, which would enable the- performance of TS required surveillances without breach of
,
the containment integrity. The inspector determined that a problem existed in connection with the delivery of valves required for implementation of PC/M 84-101/132. Consequent to the late delivery (Mid February 1985) of these valves, licensee management confirmed that one channel of the Hydrogen Monitoring system for Units 3 and .4 is incapable of being calibrated or tested in accordance with the require-ments of TS Table 4.1- Reference 5 addresses the submittal of a proposed TS change to allow breaching of containment integrity of a unit at power or refueling by opening certain va.1ves under administrative control The licensee
-
, committed to a submittal date of January 15, 1985, for the proposed TS changes reques Pursuant to the implementation date (December 17, 1984) of TS amend-ments numbers 110 and 104, and the licensee not having submitted a request for a TS change waiving the surveillance requirements for the
~
PAHM system, licensee was in a Limiting Condition of Operation (LCO),
- and was subjected to the following Action Statement for Unit 4 which was operating at 100"? power on December 17, 1984:
Action 6 With one hydrogen monitor operable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Unit 3 on December 17, 1984, was not in operation because of repairs
being made to the generator exciter system. The inspector determined that both PAHM channels for Unit 3 was inoperable at this time, v
. _ _ _ _ _ _ _ - _ _ -
.; . .
.
_
Licensee management stated that repairs would be made to the modified
' channel prior to startup of the uni Upon unit startup, a LC0 will exist and Action Statement 6 will be applicabl The issue of licensee inability to perform surveillance of the PAHM
-
system was discussed with regional management. Subsequent discussions between NRC staff and licensee management resolved this issue, in that temporary measures have been established to- perform the surveillance within the required TS perio Within this area, no violations or deviations were identifie . Test and Measurement Equipment Program (61724)
References: (a) _10 CFR 50 Appendix _ B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, Criteria II and XII (b) Regulatory Guide 1.33, 1978, Quality Assurance Program Requirements (Operation)
(c) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the _ Operational Phase of Nuclear Power i'
, Plants (d) Regulatory Guide 1.30, Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment (e) ANSI N45.2.4-1972, IEEE Standard Installation, Inspec-tion, and Testing Requirements for Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations The inspector reviewed the licensee test and measurement equipment program required by references (a) through (e) to verify that it had been estab-lished in accordance with regulatory requirements, commitments in the application, and industry guides and standards. The following criteria were used during this review to determine the overall acceptability of the established progra An equipment inventory list or equivalent has been prepared which identifies the following:
All . test and measurement equipment which will be used for any reason on safety-related structures, systems, or components
The calibration adjustment frequency for each piece of equipment
_
.
..
-
.
.
The calibration standard (national standard (s)) if applicable for each piece of equipment
.A calibration procedure to be used for each' piece of equipment
-
Formal requirments exist for marking the latest inspection / calibration date on each piece of equipment or otherwise identifying the status of calibratio A system has been provided for assuring that each piece of equipment is calibrated and adjusted on or before the date require A written recuirement has been ' established which prohibits the use of test and measuring equipment which has not been calibrated within.the prescribed frequency and describes controls to prevent inadvertent use of such equip-men Out-of-calibration controls have been established which require the following:
When a piece of equipment is found to be out-of-calibration, the acceptability of items previously tested or measured will . be evaluated and documented
Evaluation of cause of out-of-calibration
-
A formal system has been established to assure that new test and measurement equipment will be added to the inventory list and-calibrated prior to being placed in servic The following documents were reviewed to verify that previously listed
- criteria had been incorporated into the licensee test and measurement equipment progra QP 12.1, Calibration and Control of Measuring and Test Equipment, Revision 4 AP 0190.9, Control of Measuring and Test Equipment, dated May 18, 1984 AP 0190.23, Electrical Department Instrument Calibration Program, dated September 18, 1984 Maintenance Procedure 0731, Calibration of Mechanical Maintenance ,
Department Measuring and Test Equipment, dated May 18, 1984 The inspector reviewed the following QA audits and associated findings for
'
,
audits conducted in this functional area by the on-site QA staf Audit Number: -QAO-PTP-84-597 Date of Audit: November 26, 1984 i
_ . . . _ _ _ . _ _ _ . . .
_ . . . . . . , . .,___ , _
_ _ _ - _ _ . - _ . _ _ _ . - . - . _ _ _ _ _ _
.
. >
-
Audit Scope: This activity audit was conducted to verify the adequacy, ,
of control of Measuring and Test Equipment by the Plant Technical Department in accordance with Administrative Procedure 019 .- Audit Number: QAO-PTP-84-555 Date of. Audit: May 24, 1984 Audit Scope: Electrical Department Instrumentation Calibration Progra Verification of Administrative Procedure 0190.23 Audit Number: QAO-PTP-84-02-532 Date of Audit: March 20, 1984 Audit Scope: Mechanical Maintenance Department Measuring and Test Equipment Calibration Progra The inspector determined that adequate administrative controls are being
' implemented within the Instrumentation and Control (I&C) calibration
. department relative to the calibration of M&TE. Additionally, this depart-ment has implemented a training program which provides certification of personnel who conducts calibration activities in this functional are These I&C Specialists are trained in test equipment repair and calibration activitie The inspector determined that other than calibration of crimping tools, no calibration activities are conducted within the Electrical Department. The licensee presently uses the service of an off-site contractor for the calibration of electrical measuring and test equipment. The inspector verified that a Certificate of Calibration is provided which includes information concerning calibration equipment and reference standard.used for calibrating each instrumen The inspector reviewed the administrative controls and its implementation within the Mechanical Maintenance Department Measuring and Test Equipment
. (; calibration progra Within this area, one violation was identified, and is discussed in the following paragraph The inspector reviewed the PTP tool room M&TE Information Log to verify the implementation of the calibration program for mechanical M&TE. The inspector found numerous examples of instruments that were beyond the past due date for, the next calibration, without any records to indicate whether or not these instruments were removed from the program and placed in an out-of-calibration statu Instruments were identified for which the records indicate calibration having been performed beyond the "next due date", without any records to indicate whether the instruments were removed from service during the period they were past due calibration. The root m .- -.
. - ,
.
cause appears to be a deficiency not only in the implementing procedure MP G703, but also in AP-0190.9. Typical examples are as'follows:
.
. DIAL INDICATORS Calibration Due-Equipment Number Frequency -Date Status
,
P-5 6 months 8/11/84 -Unknown P-3 6 months 12/3/84 Unknown
.
, P-1 6 months 12/3/84 Unknown O. D. MICROMETERS Calibration Due Equipment Number Frequency Date Status P-111 6 months 9/4/84 2 mos. late P-112 6 months 9/4/84 2 mos. late P-113 6 months 9/4/84 2 mos. late >
+
P-114 6 months 9/4/84 2 mos. late P-115 6 months 9/4/84 2 mos. late GI-39 6 monnths 8/3/84 10 days late
.
GA-40 6 months 8/3/84 10 days late T .GI-41 6 months 8/3/84 10 days late V GI-42 6 months 8/3/84 10 days late GI-43 6 months 8/3/84 10 days late P-100 6 months 11/27/84 24 days late
'
sP-101 6. months 11/27/84 24 days late
Administrative Procedure 0190.9, paragraph 8.5 states the requirements
,
~for removal from service of any Measuring and Test Equipment (M&TE) that is out of calibration, past due calibration, or requiring s repai Additionally, paragraph 8.5.2 states that if the subject M&TE cannot be satisfactorily repaired and recalibrated, it shall be removed from' service by:
Removing its Equipment Calibration Record
Entering on the Equipment Calibration Control Log,
" Permanently removed from Service", and the date of such remova *
Disposition of the M&TE
, The implementing procedure for calibration of M&TE in the Mechanical T- Maintenance Department is MP 073 This procedure references 4 AP 019 It does not establish within the body of the procedure, administrative controls that are applicable to the removal from service, instruments that are out of calibration for whatever cause.
r Additionally, while AP 0190.9 delineates the programmatic controls applicable to the removal from service of instruments that cannot be
'
repaired and recalibrated, it does not address the removal from service of instruments that are past due calibration, or are out of calibra-tio Instruments that. are past due calibration or exceed required
.
?
p ..
. .
.
calibration tolerances does not inherently mean the instrument is damaged and repairs and recalibration of the instrument is require The procedure does not address the removal from service of instruments that are past due calibration or are found to exceed required calibra-tion tolerance Quality Assurance audit GAO-PTP-84-02-532 finding IV, " Failure to follow procedure for removal from service", addresses programmatic deficiencies in the removal from service of broken and out of calibra-tion instruments. The corrective action delineated in FP&L interoffice correspondence from R. A. Longtemps to K. L. Jones dated May 14, 1984, does not address the root cause of the problem in that the distinction between the administrative controls applicable to removal from service of broken instruments, and the controls applicable to instruments that are past due calibration or are found to exceed required calibration tolerances, have not been addresse This failure to establish measures to assure that tools. gages, ;
instruments, and other M&TE used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within limits is identified as Violation 250/84-41-01 and 251/84-42-0 . Licensee Action of Previously Identified Inspection Items (92701)
(Closed) Inspector Followup Item 250, 251/83-36-03, General Employee Training Procedure Inconsistency. The inspector reviewed Administrative Procedure 0304 which had been revised in response to the previously identfied inspection finding. Paragraph 8.5 has been upgraded to require that all employees who need to enter the plant protected area be given the General Employee Training Orientation. Additional requirements for Health Physics training and a description of the responsibilities assigned to the Health Physics Supervisor and the Security Supervisor have been addresse (Closed) Inspector Followup Item 250, 251/83-36-04 Upgrading of I&C Maintenance Department lesson Plans. The inspector reviewed the Steam Generator Level Lesson Plan PRA-IC-IV-4(e)-1, revised January 1984, and verified that the lesson plan had been upgraded to include changes implemented by Plant change / modification 79-33. Additionally, the inspector reviewed the Condensate System lesson plan PRA-IC-IV-5(D)-1, revised
, January 1984, and verified that the lesson plan had been upgraded to reflect (. changes to system configuration caused by design change k (Closed) Inspector Followup Item 250, 251/81-30-01, Safety-Related Instru-
- ment Not on Calibration Schedule. The inspector reviewed the Document 1 Verification Actions / Feedback Sheet (page 48 of AP 0190.15) for PC/M-CPWO
\ No's81-314 and 81-113, and verified that BIT electrical heat tracing had j been disconnected. Pursuant to the BIT having also been isolsted from the
CVCS system by the above PC/M's, surveillances of BIT temperature instru-
) ments is no longer require \
\
\
\
\
L ...___J