IR 05000250/1985021
| ML20133A928 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/19/1985 |
| From: | Ennis J, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20133A904 | List: |
| References | |
| 50-250-85-21, 50-251-85-21, NUDOCS 8508060016 | |
| Download: ML20133A928 (1) | |
Text
._______
_
-
..
.
[@ Kicg UNITED STATES
'o NUCLEAR REGULATORY COMMISSION
['
- 'n REGloN 11 g
g
,j 101 MARIETTA STREET. N.W.
- '
t AT L ANTA, GEORGI A 30323
\\.~..*/
AUG 1885-
Report No. 50-250/85-21 and 50-251/85-21 Licensee: Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33012 Docket Nos.
50-250 and 50-251 License Nos. DPR-31 and DPR-41 Facility Name: Turkey Point 3 and 4 Inspection Date1:
May 22-24 and June 4, 1985 Inspector:
Wh #
de//V/8'f J(r fy D. Ennis, Physical Security Inspector Date S'igned Approved by:
h 6 /I4/g5
$ 0. R. McGuire, Chie(\\ Physical Security Section 0$e SFgned i
y Nuclear Materials SMety and Safeguards 8 ranch Division of Radiation Safety and Safeguards
'
.
SUMMARY Scope: This special, announced physical security inspection entailed 16 inspector-hours on-site reviewing the facts and circumstances surrounding two physical security events reported by the licensee in accordance with the provisions of 10 CFR 73.71(c).
Results:
One violation was identified relating to the failure to implement approved compensatory measures in a timely manner following a loss of security system effectiveness.
'
.
l 8500060016 850001 INCt057'(0ppU, PDR ADOCK 05000250 ggD 'ITO'.",f)T,tg
PDR W SEPARAD % y *
l * * * *
.