IR 05000250/1987001

From kanterella
Jump to navigation Jump to search
Insp Repts 50-250/87-01 & 50-251/87-01 on 870126-30.No Violations or Deviations Identified.Major Areas Inspected: Seismic Analysis for as-built safety-related Piping Sys (IE Bulletin 79-14) & safety-related Pipe Supports
ML20207T169
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/12/1987
From: Blake J, Chou R, Vias S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20207T162 List:
References
50-250-87-01, 50-250-87-1, 50-251-87-01, 50-251-87-1, IEB-79-14, NUDOCS 8703230274
Download: ML20207T169 (10)


Text

- ____--_ -________-_

1, ;

  • * # **e UNIT 00 STCTSS

.

/

'

NUCLEAR REGULATORY COMMISSION

'

f'

REGION 11

,

g 101 MARIETTA STREET,N.W.

'

AT LANTA. GEORGI A 30323 t.y....

Report Nos.: 50-250/87-01 and 50-251/87-01 e

Licensee:

Florida Power and Light Company

"

9250 West Flagler Street Miami, FL 33102

' Docket Nos.:

50-250 and 50-251 License Nos.: DpR-31 and DPR-41 Facility Name: Turkey Point 3 and 4 Inspection Conducted: January 26-30, 1987 Inspectors: b [

lhkN 1A 7/ f7 5. J. Vf f

Date Signed

'

FXfnn/:

  • /k// Y C. Cho < '

Dite<5fgned i

,

Approved y t*

  • rw n. r, r

,f I

'

J. J.

e, Section Chief Dite figned

Engineering Branch,

Division of Reactor Safety

!

SUMMARY

,

Scope: This routine, announced inspection was conducted in the areas of seismic

!

analysis for as-built safety-related piping system (IED 79-14), safety-related

!

pipe supports, base plate designs using concrete expansion anchor bolts (IEB

[

79-02).

Results:

No violations or deviations were identified.

'

!

l

i

!

l 0703230274 070224 PDn A00cn 05000200

POR

,

m

.

- - - ---

--

-

.---

- -

-

- - -

.. -.

-....

- -

- - - -

-

- -

..

.

.

.

.

.

.

.

.

. - -. -

- - -

- -

-.. -. - - - -

-

.

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • C, J. Baker, Plant Manager - Nuclear
  • E. Preast, Engineering Manager
  • J. Arias, Jr., Regulation & Compliance Supervisor
  • W. Bladow, QA Superintendent - Nuclear
  • J. M. Donis, Site Engineering Supervisor
  • D. I. Lanier, Mechanical Engineer
  • J. M. Mowbray, Lead Mechanical Engineer
  • G. Salamon, Compliance Engineer Other licensee employees contacted included construction craftsmen, engineers, technicians, QC inspectors, and office personnel.

Other Organizations

  • J. Gnecco, Site Engineering Representative, Teledyne Engineering Services (TES)

J. Mills, QC Inspector, Stone and Webster Consulting Corporation NRC Resident Inspectors D. Brewer, Senior Resident Inspector

  • K. VanDyne, Resident Inspector
  • J. MacDonald, Resident Inspector
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on January 30, 1987, with those persons indicated in paragraph I above.

Tho inspector described the areas inspected and discussed in detail the inspection findings.

No dissenting comments were received from the licensee.

The following new items were identified during this inspection.

Unresolved Items, 50-250/87-01-01 and 50-251/87-01-01, " Discrepancies of Installed Piping, Pipe Hangers / Restraints During IED 79-14 and IEB 79-02 Walkdown," paragraph 5.

Unresolved items 50-250/87-01-02 and 10-251/87-01-02, hFailure to identify Discrepancies for Pipe Hangers / Restraints," paragraph 5.

-

-

-

- - - - _ - _. - _ - - - _ - - - - - _ _ _ _ _.,

_

!

'

'

The licensee agreed to evaluate the discrepancies identified by the inspectors to determine, a) the significance of each discrepancy, and b) why

these discrepancies had not been identified by the licensee's walkdown program.

i The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during t51s inspection.

3.

Licensee Action on Previous Enforcement Matters

This subject was not addressed in the inspection.

4.

Unresolved Items l

Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or i

deviations.

Two unresolved items identified during this inspection are

discussed in paragraph 5.

i 5.

Safety-Related Piping, Pipe Support And Restraint Systems (25528, 25529, and 50090)

I a.

Observation of Installed Piping and Hangers

!

I The inspectors selected 17 piping isometrics which included 64 hangers (pipe hangers and component hangers) that had been QC final-inspected for the component cooling water system (CCW). The piping and hangers were reinspected with the assistance of QA/QC inspectors, construction craf tsmen and engineers.

The piping was reinspected against detail j

drawings for configuration, dimension, branch / tap location, hanger location, hanger identification, clearance with adjacent structure and/or pipe, valve identification and val _ve operator orientation.

The hangers were reinspected against their detail drawings for configura-tion, identification, dimension, clearance, member size, welding,

!

baseplate, fastner/ anchor bolt installation, and damage protection, b.

Summary of Results The results were discussed with the QA/QC inspectors and engineers, to r

determine the effectiveness of the IEBs 79-02 and 79-14 programs.

!

Listed below are the comments and discrepancies identified by the

!

inspectors during the walkdown.

i Pipt.ng Isometric / Pipe Hangers Comment / Discrepancy l

2"4 branch line, 4" south I

Iso 5177-102-SK-P-286 Rev. E

-

-

of SR-300/ACH-5 not shown i

!

Design drawing shows base-

$R-300/ACH-5 Rev. 2

-

-

plate 1/2 x 8 x 8, l

installed 1/2 x 8 x 11 j

.

t

!

,

l

-

T

.

  • Piping Isometric / Pipe Hangers Comment / Discrepancy Design drawing shows U-bolt, 3-ACH-4 Rev. 0

-

-

none installed Design drawing shows base-3-ACH-6 Rev. 2

-

-

plate 1/2 x 16 x 16, installed 3/4 x 16 x 20 East rod bent ACH-52 Rev. 0

-

-

Installed wing plate and ACH-53 Rev. 0

-

-

base plate, but nat shown on drawing 2"# branch line 4" north Iso 5177-102-SK-P-287 Rev. E

-

-

of 3-ACH-39 not shown None 3-ACH-39 Rev. 2

-

-

3 separated branch lines /

Iso 5177-102-SK-P-288 Rev. E

-

-

taps, 3'-4" east of 3-SR-309 not shown No load plate on spring can 3-SR-309 Rev. 1

-

-

,

3-ARH-111/SR-307 Rev. 0 None

-

-

No load plate on spring can 3-ARH-112/SR-308 Rev. 0

-

-

ISO 5177-102-SIC-P-289 Rev. E None

-

-

South load pin threaded 3-ARH-114/SR-343 Rev. 1

-

-

inside of end attachment None A

Rev. 1

-

-

Design calculation does not SR-305 Rev. 1

-

-

indicate the loading from other support on common steel SR-306(FSK-C-709)

Rev. 1 None

-

-

Gap behind baseplate 3-ARH-128 Rev. 1

-

-

greater than 1/8"

,

!

-

. -.

-

.

.

- - -

-

-

.

r

.

'

Piping Isometric / Pipe Hangers Comment / Discrepancy 2"# branch line, 3'-4" up Iso 5177-102-SK-P-290 Rev. E

-

-

from hanger MK-222 shows wrong direction 4 branch lines / taps, north b

-

of hanger 3-ARH-117 not shown 0" gap at top and bottom of 3-ARH-117 Rev. 1

-

-

pipe None MK-222 Rev. 2

-

-

No washers on anchor bolts 3-ARH-124 Rev. N/A

-

-

No washers on anchor bolts MK-111 Rev. 2

-

-

Grout missing around part of

-

baseplate

Support unable to slide as

-

design due to corrosion Insufficient thread engage-3-ARH-123 Rev. N/A

-

-

ment for all anchor bolts Baseplate flaking and SR-311 (FSK-C-704)

Rev. 0

-

-

corroded l

!

Anchor bolt nut (South-

-

east) missing on plate 36 x 6

,

Iso 5177-102-SK-P-291 Rev. D None

-

-

.

Elevation direction shown 3-ARH-116 Rev. 0

-

-

incorrectly NLR written re:

pipe gap SR-304 (FSK-C-708)

Rev. 0

-

-

Washer plates on channels 3-ARH-120 Rev. 2 l

-

-

shown incorrectly l

l No washer plates shown 3-ARH-119 Rev. 2

-

-

,

Minimum spacing between top 3-SR-301 Rev. 1

-

-

abandoned holes and 3/4"(

Hilti bolt measured 2" l

!

I

-

- -

-

-

. -

.

-

-

-

..

.

-.

, _ _

_

__

_ _ _ - _ _ _ _ _ _ _ _ _ _. _ _ _ _ _. _ _.. _ _ _ _ _ _ _ _ _ _ _

.

-

.

Piping Isometric / Pipe Hangers Comment / Discrepancy SR-303(FSK-C-708)

Rev. 0 Minimum spacing requirement

-

-

between anchor bolts is not met.

2 branch lines / taps, south Iso 5177-102-SK-P-271 Rev. C

-

-

of 3-ARH-91 not shown Isometric shows deleted

-

Hanger "A" Deleted A

Rev. 0

-

-

None 3-ARH-91 Rev. 0

-

-

Load plate painted over 3-ARH-92 Rev. 1

-

-

Elevation direction shown

-

incorrectly None SR-158 Rev. 1

-

-

1 branch line/ tap, near Iso 5177-102-SKP-272 Rev. C

-

-

hanger 111 not shown Isometric shows deleted

-

Hanger 111 Deleted 111 Rev. 0

-

-

None 3-ARH-105 Rev. 0

-

-

None 3-ARH-104 Rev. 0

-

-

SR-343 (FSK-C-717)

Rev. 0 None

-

-

I branch line/ tap, r, ear Iso 5177-102-SK-P-273 Rev. 0

-

-

hanger "A" not shown Hanger 3-ARH-108 location

-

is 6h" outside tolerance for location shown on Isometric Isometric shows deleted

-

hanger "A" No drawing provided during A

Rev. N/A

-

-

walkdown

. _ _ _ - _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _

-

- __

,

/,.

't

'

'.-

-

.

.

.

'

.

Piping Isometric / Pipe Hangers

' Comment / Discrepancy-None 3-ARH-107',.

Rev. 0

-

.

,

.3-ARH-108

~Rev.'O None

-

Design calculation does not SR-342 (FSK-C-715)

Rev. O'

-

-

indicate the loading from other hanger 3-ARH-93 on e

common steel P

' Iso'5177-102-SK-P-304 Rev. D None

-

-

..

3-ARH-98 Rev. 1 None

-

-

None 3-ARH-99 Rev. N/A

-

-

.3-ACH-136 P.ev. O'

~ Orientation of angle

-

on Detail "A" shown incorrectly Orientation of angle on 3-ACH-137 Rev. 0

-

-

Detail "A" shown incorrectly Gap on bottom of. pipe

-

Orientation of angle 3-ACH-138 Rev. 0

-

-

on Detail "A" shown incorrectly

,

Isometric does not indicate

- Iso 5177-102-SK-P-317 Rev. D

-

hanger installed 9'-11" west of hanger 3-ACH-164 3-ACH-164 Rev. 0 None

-

-

Nut loose on upper clamp 3-ACH-165 Rev. 0

-

-

bolt

>

This hanger not shown on Unknown hanger no.

Rev. N/A

-

-

Isometric Unknown lateral supports Iso 5177-102-SK-P-322 Rev. E

-

-

shown on isometric east of temperature mode change None SR-144 (FSK-C-638)

Rev. 0

-

-

3-ARH-197 Rev. 1 None

-

-

--

.

.

- Piping Isometric / Pipe Hangers Comment / Discrepancy 3 places of clearance Iso 5177-102-SK-P-323 Rev. E

-

-

-less than 3/4" 1"4 Hilti bolt not shown on SR-145 (FSK-C-643)

Rev. 0

-

-

drawing Design calculation'does not 3-ARH-93 Rev. 0

-

-

indicate the loading from other hanger SR-342 on common steel

,

3 places of clearances less Iso 5177-102-SK-P-324 Rev. E-

-

-

than 5/8"

,

2 branch lines / taps not

-

shown on south of hanger

,

3-ARH-82 i

I branch line/ tap shown

-

wrong direction up from valve 3-701-A Isometric states " carries 3-SR-292 (FSK-C-724) Rev. 0

-

-

no weight load," hanger has zero clearance on bottom of pipe Elevation direction shown 3-ARH-79 Rev. 2

-

-

incorrectly

- 3-ARH-82 Rev. 0 None

-

5177-102-8074-A-370-01/

L

-

(

SR-147 Rev. 1 None

-

f Actual location of hanger l

Iso 5177-102-SK-P-325 Rev. E

-

-

!

3-ARH-87 is 2'-11" north l

of elbow, isometric shows hanger on elbow

'

3-ARH-87 Rev. 2

- Old hanger not removed as

-

l L

required on hanger drawing

!

No washers on anchor bolts 3-ARH-89 Rev. 0

-

-

Gap greater than 1/8" SR-142 (FSK-C-640)

Rev. 0

-

-

behind top of baseplate i:

,

,

re-

--

w,,


7

, - - -

-,w y

,

,rw-w---

-mm

---r7

-

--v--rw-e w

--e v-w

--

,,v-,

-

c

-

,-

. Piping Isometric / Pipe Hangers Comment / Discrepancy SR-140 Rev. 2

- No washers on anchor bolts

-

in center of baseplate No washers on anchor bolts

- 3-ARH-125 Rev. 2

-

Support unable to slide as

-

designed due to corrosion Iso 5177-102-SK-P-326 Rev. F

- Valve 3-701C incorrectly

-

shown on isometric 2"4 branch line/ tap

-

3'-7" east of 18 x 18 x 16 reducing tee not shown

- 1/2" clearance south of-3-ARH-77 3-ARH-76 Rev. 0

- None

-

- 8074-R-326-01/

SR-146 Rev. 0

- Nut loose on top-north anchor bolt (NCR written)

Dimension between center

-

line of pipe and center line of top anchor bolt shown incorrectly

-

3-ARH-77 Rev. 0

- None 3-ARH-78 Rev. 0 None

-

-

- Iso 5177-102-SK-P-327 Rev. J None

-

- SR-138 Rev. 1

- None The discrepancies are to be reviewed and evaluated by the licensee, (as agreed during the exit meeting, on January 30, 1987). The evaluation and corrective actions proposed and/or taken will be reviewed by the inspectors in future inspections.

This matter is identified as Unresolved Item 50-250, 251/87-01-01, " Discrepancies of Installed Piping, Pipe Hangers / Restraints During the IEB 79-02 and IEB 79-14 Evaluation Walkdown."

c.

Corrective Action During discussions with the licensee, concerning the discrepancies identified in paragraph 5 above, the inspectors pointed out that the lack of attention to detail and failure to identify and establish-

._

-

.

'

corrective actions in these areas, ~ were of particular concern, in that the regulations require that-licensee's programs assure that a) conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment are promptly identified and corrected, and b) nonconformances are promptly identified and corrected.

In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action is taken to preclude repetition.

Also the. identification of the significant conditions adver>e to quality, the cause of condition, and the corrective action taken shall be documented and reported to appropriate - levels of management.

The licensee indicated that they will investigate to determine why there were so many unidentified discrepancies. Pending the completion of the licensee's investigation, and the subscquent NRC evaluation to determine whether the licensee violated 10 CFR 50, Appendix B, Criterion XVI, this matter will be identified as Unresolved Item 50-250, 251/87-01-02, " Failure to Identify Discrepancies for Pipe Hangers / Restraints."

.

_

-, -

,