Requests Authorization to Perform Verification of post- Tension Loads in Control Tower,As Part of Remedial Soils Work
ML20083Q665
Person / Time
Site: Midland
Issue date: 02/16/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6557, NUDOCS 8302280239
Download: ML20083Q665 (1)


Text

1

-4 Consumets w m.

  • Fower sia. u -

Company ""'-'~*"

- MWiend Project: PO Box 1963. Midland, MI 48640 + (517) 631-8660

- February 16, 1983 Mr. W. D. Shafer Midland Project Sec' tion

- U. S. Nuclear Regulatory Cmmission Region III-

- 799 Roosevelt Road

Glen Ellyn, IL 60137 MIDIAND PROJECT 00 7020 RDEDIAL SOILS WORK AUIIORIZATION

. File: 0485.16 UFI: 42*05*22*04 SERIAL: . CSC--6557 12*32 We have reviewed the work controlling documents associated with the verifica-tion of post tension loads in the control tower and are ready to perfonn this operation.

We therefore request authorization to perform the following activity:

No. 102550203 ,-Verify Post Tension Loads

.Q Y D. B. Miller, Jr.

Site Manager i

DBM/RHN/lrb l

l

~

8302200239 830216 PDR ADGCK 05000329 A PDR JB/