ML20063J940

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1993 for Comanche Peak Steam Electric Station,Unit 2,Revision 2
ML20063J940
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/30/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20063J702 List:
References
NUDOCS 9402250033
Download: ML20063J940 (1)


Text

. .

m ,

Attachment to TXX-94041 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT REVISION 2 DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 02/14/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 OPERAYING STATUS

1. REPORTING PERIOD: NOVEMBER 1993 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150 3, POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 682- 2,545 2,545
6. REACTOR RESERVE SHUTDOWN HOURS 38 327 327
7. HOURS GENERATOR ON LINE 663 2,501 2,501
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,063,460 8,105,455 8,105,455
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 698,030 2,731,497 2,731,497
11. NET ELECTRICAL ENERGY GENERATED (MWH) 666,354 2,609,488 2,609,488
12. REACTOR SERVICE FACTOR 94.8 88.6 88.6
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 100.0 'I
14. UNIT SERVICE FACTOR ,

92.1 87.1 87.1 i

15. UNIT AVAILABILITY FACTOR 92.1 87.1 87.1
16. UNIT CAPACITY FACTOR (USING MDC) 80.5 79.0 79.0 i
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 80.5 79.0 79.0
18. UNIT FORCED OUTAGE RATE 7.9 2.2 2.2 l
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED ,

COMMERCIAL OPERATION 930803 ESTIMATED I

i 9402250033 931130 25 PDR ADDCK 05000445 ':1 R PDR 4 ,

_- __. ,