MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
r " ~ '
. 4 I
Attachment to TXX-94041 Page 1 of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 ;
NRC MONTHLY OPERATING REPORT ,
DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 02/14/1994 i COMPLETED BY: Janet Hughes TELEPHONE: 817-897 5331 OPERATING STATUS l
- 1. REPORTING PERIOD: JANUARY 1994 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe Net): 1150
- DESIGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY): '
THIS MONTH YR TO DATE CUMULATIVE ,
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 23,283
- 6. REACTOR RESERVE SHUTDOWN HOURS O O 2,354 ,
l
- 7. HOURS GENERATOR ON LINE 744 744 22.837 l
- 8. UNIT RESERVE SHUTDOWN HOURS O O O
- 9. GROSS lHERMAL ENERGY GENERATED (MWH) 2,536,090 2,536,090 72,285,895 i
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 854,089 854,089 23,989,346
- 11. NET ELECTRICAL ENERGY GENE' ATED (MWH) 821,112 821.112 22,816,963
- 12. REACTOR SERVICE FACTOR 100.0 100.0 76.5
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 84.3
- 14. UNIT SERVICE FACTOR 100.0 100.0 75.1
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 75.1
- 16. UNIT CAPACITY FACTOR (USING MDC) 96.0 96.0 65.2
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.0 96.0 65.2
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 5.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESliMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813 j
ESTIMATED 9402240142 DR 940131 ADDCK 05000445 PDR .j
, ...., . - . - . . - . .~.-.. ...~ . - - - .- --. - - - . . . . . . ..- . ~ . -
l
.4
. ?. l 4
i f
i l
Attachment to TXX-94041 i Page 2 of 13 l
, AVERAGE DAILY UNIT POWER LEVEL $
I i DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 02/14/1994 ,
COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331- !
MONTH : JANUARY 1994 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL ;
(MWe-Net) (MWe-Net) :
, l
] 1 1105 17 1099 ;
4 2 1105 18 1102 i
. 3 1105 19 1105 c
4 1104 20 1105 ;
i 1
5 1104 21 1107 I I
i i 1 6 1104 22 1105 1 7 1104 23 1105 4
8 1103 24 1106 :
l i j 9 1103 25 1105 :
10 1104 26 1105 i
- 11 1105 27 1106 '
12 1111 28 1106 l 13 1098 29 1102 .
14 1105 30 1105 I 15 1076 31 1105
- t a
16 1110 i
h 8
- u , -
e.--e.~ -.,r - we, ,.e.-w-,---.r- we --w~--- *.--------------=~-r - - ~ ~ - * - - - - - - - '= l
~ . _ . _.
k e
?
l i
Attachment to TXX-94041 Page 3 of 13 !
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH !
DOCKET NO.: 50-445 UNIT: CPSES 1 ,
DATE: 02/14/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 MONTH : JANUARY 1994 DAY TIME REMARK / MODE 01/01 0000 Unit started month in MODE 1. ,
1 1
01/08 2245 Protection inverter IV1PC1 failed, instrument bus re-energized from alternate power.
01/09 1808 inverter IV1PC1 returned to OPERABLE status following replacement of f ailed i resistor. l 01/31 2400 Unit ended month in MODE 1. i l
l
Attachment to TXX-94041 ,
Page 4 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 02/14/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 REPORT MONTH : JANUARY 1994 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS l
1 a
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING . G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
I
l Attachment to TXX.94041
, Page 5 of 13 !
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 7
{
NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 I I
UNIT: CPSES 2 DATE: 02/14/1994 '
COMPLETED BY: Janet Hughes TELEPHONE: 817-897 5331 :
-i OPERATING STATUS )
- 1. REPORTING PERIOD: JANUARY 1994 GROSS HOURS IN REPORTING PERIOD: 744 l
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
- DEStGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 4,033
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 327
- 7. HOURS GENERATOR ON LINE 744 744 3,989
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,471,383 2,471,383 13.089,341
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 840,410 840,410 4,427,637
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 808,488 808,488 4,240,294
- 12. REACTOR SERVICE FACTOR 100.0 100.0 92.5 4
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 100.0
- 14. UNIT SERVICE FACTOR 100.0 100.0 91.5
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 91.5
- 16. UNIT CAPACITY FACTOR (USING MDC) 94.5 94.5 84.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 94.5 94.5 84.6
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 1.4
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIA'. O?ERATION 930803 2 1
i ESTIMATED I I
or
Attachment to TXX-94041
. Page 6 of 13 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-446 UNIT. CPSES 2 DATE: 02/14/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 MONTH : JANUARY 1994 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l 1 1120 17 1118 2 1120 18 1097 j 3 1118 19 1092 I
4 1118 20 1095 5 1121 21 1070 I 6 1119 22 1096 7 1119 23 1100 8 1120 24 1100 9 1121 25 1101 10 1120 26 1099 11 1119 27 1100 12 1121 28 1095 1
I 13 1120 29 873 14 1120 30 867 15 1121 31 870 16 1118
1
. i i
Attachment to TXX 94041 J
, Page 7 of 13
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-446 l UNIT: CPSES 2 :
DATE: 02/14/1994 !
COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 l l
1 MONTH : JANUARY 1994 l DAY TIME REMARK / MODE 01/01 0000 Unit started month in MODE 1.
01/06 The electric governor, governor booster servo motor, motor operated potentiometer and normal voltage regulator for Unit 2 Emergency Diesel
, Generator (EDG) 01 was replaced. The diesel generator had experienced f ailures on two occasions. See Special Reports 2-SR-93-004 and 2-SR-94-001.
01/19 1500 Due to intermittent problems associated with Turbine Spt > s input to electro-hydraulic control (EHC) causing minor turbine load swirgs, reduced power to 98% with EHC at 98% and mechanical hydrauhc control (MHC) at 100%.' With MHC at 100%, an upward load swing weutd be hmited by the MHC control system and mainta:ned at 100%
01/29 0600 Commenced operation at 80% power for fuel cycle optimization purposes.
01/31 2400 Unit ended month in MODE 1.
1 1
l w -+v4 Y'we - s- -
Pege 8 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446
DATE: 02/14/1994 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 REPORT MONTH : JANUARY 1994 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 1 940129 S 0.00 H 4 Fuel cycle optimization purposes.
- 1) REASON 2)- METHOD A: EQUlPMENT FAILURE (EXPLAIN) E. OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING . G: ' OPERATIONAL ERROR iEXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)