Quarterly Rept 37 for Apr-June 1982
ML20050D600
Person / Time
Site: Midland
Issue date: 03/31/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20050D588 List:
References
NUDOCS 8204120352
Download: ML20050D600 (54)


Text

_

Y/,g j,

CONSUMERS POWER COMPANY REPORT #37 MARCH 31, 1982 Pursuant to Conditions 2FB and 2FC of Construction Permits CPPR-81 and CPPR-82, the following report covers the period April 1, 1982 through June 30, 1981.

A) Construction work to be performed during this period.

See Attachment A.

B) Personnel with quality related duties who were assigned to the Midland Project during the period January 1, 1982 through March 31, 1982 and who are expected to be on site through March 31, 1982 and who will be trained as necessary to perform the functions required to them, are as follows:

1) Midland Project Quality Assurance MLCurland QA Superintendent PAC JScampbell Mechanical QAE Aero-Detroit KLDamre1 Civi1 QAE CPCo RDKlinzing Special Projects NIC i

WASullivan Mechanical IE&TV PDS BMPalmer Civil QAE SAI RBishop Level II Inspector CPCo LFabel QA Clerk SAI RKucharek Level I Inspector SAI Flounds Level II Inspector SAI GSweet Level I Inspector SAI

2) Bechtel Quality Assurance / Quality Control WBearden Bechtel Electrical WBigcraft CPCo Electrical CClay Bechtel Civil RCline Bechtel Electrical MCustack Bechtel Electrical MDeslippe Bechtel Electrical LEdwards Bechtel Civil JEvans CPCo Electrical BFayerman Bechtel Electrical NFoose Bechtel Civil DGabel Bechtel Electrical JGretencord Comstock Electrical RHopkins Bechtel Electrical EKent Bechtel P/M JKexel Bechtel Electrical DKincaid Bechtel Civil JKo Bechtel Civil ELimper Bechtel Electrical MMilandin Bechtel Electrical LMouring Bechtel P/M RSavoie Bechtel Electrical KO$$$$

PDR

~

.e 2

SSwiftney CPCo Electrical VUchitel Bechtel Electrical TWatts Bechtel Civil RWebster Bechtel Civil JWerner Bechtel Civil

3) B & W Construction Company ECPeterson Level II Mechanical B&W C) Quality Assurance qualifications of supervisors and engineers listed in B above are attached to this report.

D) Changes The following personnel no longer are performing quality-related tasks at the site:

1) Midland Project Quality Assurance GRAnderson Mechanical IE&TV Bechtel WTAgerter Mechanical Section Head PAC ARBurns Mechanical IE&TV NIC JCroy Civil IE&TV Bechtel JRDecker NDE/ Welding IE&TV CPCo PPorter Electrical QAE Bulter
2) Bechtel Quality Assurance / Quality Control DBunnell CPCo Electrical MKarolyi Bechtel Electrical EKent Bechtel P/M CWhatley Bechtel P/M 3)

B & W Construction Company none

4) QA/AC Nuclear Operations CEMcIntyre QA Engineer CPCo Further additions and deletions to the personnel with quality related duties will be noted in the next quarterly report.

e

3 n

AL A G nEsumi O NrA NI Z A T IO N LAST NAME F4R ST NAME DATE.

EMPLOYse' NO.

MPQAD CURLAND, MARVIN 2/5/82 PAC 101 EDUCATION YE4 RS DEG T' E E.

SCHOO L NAME.

CIT Y STATE M A JO R

477, g g,J E H6M Norwich Free Academy Norwich, Conn Science 4

COLL.EGE Diploma University of Conn Storrs Conn Eneineerine

')

linn 1941 OTHER A & M College of Texas College Sta., Texas Mech Engrg te ms e f 8; 44 OTHER University of Conn Storrs, Conn Mech Engrg 1

Jt n 1947 JO B H isTORY M /"

COMPANY / Ap0RESS YOUR T IT L E DOTIE S froM to 4/78 late Project Ascistance Corp "8'

"E ' #

Vice President 100 N. Winchester af regional office, New London, Conn.

Blvd Suite 260 (Relieved of marketing, & mgmt. whiLe San Jose CA 95128 an COCO Assignment).

5/76

'+ / 78 Proto Power Management Principal nsuhing Corp Quality Assurance ngineer sngineering Poquonnock Rd Croton, Conn 06340 12/74 5/76 M.L.Curland, Inc.

President feaching and consulting 24 Bailey ligts management and quality assurance Norwich, CT 06360 9/73 12/74 General Dynamics Corp Establish & Implement measure of Corporate Laclede Center e & dimm M Wod

""" E"#

St Louis, Mo data systems service centers Performance a new ivision)

Evaluation &

.1.

1/73 9/73 General Dynamics /

Site Program levelop and initiate the program &

Electric Boat Div.

Manager staff for 4 direct construction of Croton, Conn 06340 land based submarine nuclear power plant to navy & NRC requirements.

7/72 1/73 Ditto Deputy operations director Develop plan to restructure shipyard arganization for handling 4X increaue in work load.

Train director.

r pg. 2.

p..

e JO B W ISTO RY COMPAMY / ADDRESS YOUR T-(T 1. E DUTIE S Faom i ro i I

l 4/69 7/72 Ditto Director of l Direct:

Long range planning l

Management i marketing, communications systems, l

Engineering l management systems, EDP center, internal consultants, indust. Engrg.,

i n,- a t yt e3 q,

.g.

er employee suggestion system, pro-ductivity improvement program orga n-ization analysis, etc. also monito:-

all operations incl. corp. interna:.

auditing.

2/72 5/72 Ditto Detached for 2 (1) Audit & Assess Quaincy ship Special assignmer tsb1dg div performance & capabilty (1) Corp Dir of to design & construct very large VLCC Planning Ter m crude carriers & (2) evaluate (2) EBDiv Audit c f enmnli4nce en nuc1 re-M in nuclear performar ce EB shipyard.

5/62 4/69 Ditto Nuclear Quality Establish nuclear quality policy Manager

& organization.

Implement & ensure conformance to navy & company requ:.re ments for shipyard & prototypes.

12/60 5/62 Ditto Assistant to Directed planning & control, a bc,u t SSG Nuclear scheduling, estimating, Project Mgr progress reporting for design of USS Narwhal Power g It prt 7p_

ti i..

9/60 12/60 Ditto Nuclear Directed design & fullscale Project Mgr.

mockup of major moditication to S5W Wide S5W reactor plant to accommodate Tunnel Modif.

future long life advanced core.

5/60 9/60 Ditto Nuclear Project Directed design & construction about Manager during post shakedown USS Triton availability (PSA) of twin (PSA) reactor plant submarine after its submerged circumnavication of the world.

1958 5/60 Ditto SSW Project Developed & directed nuclear plant early Chief Reactor test program for submarines with l

Plant Test S5W plants. Chaired joint test group Engineer 5/51 1958 Ditto Several assignments Worked on seawolf prototype, in electrical, c:.vil, estimated & purchased all wire h mechanical & nue:. ear cable for nautilus, developed engineering, s ow test programs for battery supervisory water colling & air agitation systems and suomarine (cout us

F (G

~~

Pg 3 c.

y JO B W 15~ O R

COMPAMY / ADDRESS YCOR TIT L E DUTJE S FEom I ro l 5/51 1958 Continued continued l

l Degaussing system.

Directed development of shipbuilders I

portion of nautilus nuclear g

propulsion plant & managed the l

joint test group (AEC, USN, BAPL, EB, Ship).

Established management system for procurement of long lead engineered components for nuclear submarine programs.

10/49 5/51 Hanover Curland Co.

Buying, selling, advertising Norwhich, Conn Salesman furniture & appliances, custom and ki tcije ns, air conditioning.

Dept. Mgr.

6/47 10/4%

Greenpoint Coal Docks Fuels Engr Buying & selling coals & metallurgics Pablo P. Mueller, Inc.

coke-domestil & foreign-shipping &

s ummi. r New York, NY export.

Office management.

1946 l

l t

i

I f

f".9 A!. A ll RE suu z 9

oscrh m 26 rsors ms1 nwE resi nwe OAm Ersio ni na MPQAD DAMREL, KENNETH 3/2/82 :! 83-68-9098 EDUCATION SCHOO L NAME.

CIT Y STATE MAJOR g

%Cl&k HIGR O'h,tf$dh East Detroit High East Detroit, MI College Prep 3

L.mwe, j

COLLEGE Lawrence Institute Construction BSCE of Technology Southfield, MI Engineering 3

6/1981 OTHER University of Detroit Detroit, MI Engineering 1

OTHER JO B H ISTOR Y Mo/vg COMPANY / ApORESS VOOR T IT L E DL) TIE S Fatori TV 1/82 2/82 ' Consumers Power Co.

Associate Developing Computerized 1945 W.

Parnall Rd Engineer schedules for the Midland Proj_ect.

Jackson, MI 49201 Assisting a project Engineer 10/81 12/81 Consumers Power Co.

  • " ** E" Graduate 1945 W.

Parnall Rd between utility and A/E and dev-Engineer Jackson, MI 49201 eloping test methods for resin in Training sluice ball valve.

l 6/81 10/81 Consumers Power Co Graduate Pre-operational testing of 1945 W.

Parnall Rd Engineer tossil & Nuclear Power Plants i

l Jackson, MI 49201 in Training l

l l

12/79 5/81 Mich Dept of Transport-Traffic Marking prints to show as j

ation Technicican constructed items.

2211 E Jef ferson Detroit, MI 48207 l

9/79 11/79 Structural Steel, Inc.

Surveyor Checking wall heights and anchor 47783 N. Gratiot bolt locations to find as built l

Mt. Clemens, MI 48043 dimensions.

l l

l 6/79 9/79 Mich. Dept. of Trans.

Construction Testing Concrete for Air & Slump 26308 Colman Dr.

Technician Testing compacted fill for proper Warren, MI 48089 grade & density.

I

r-5 P3

]

ALAG RESU M E O AGA N t I AT IO N LAST NAME FiRST NAME DATE EMPLOffi ha MPQAD SULLIVAN, WAYMON A.

3/15/82 PDS-64 EDUC.ATION WARS DEGR E E SCHOO L NAME.

CIT Y STATE M A JO R nt gm N

Ocala High Ocala, Florida 10 Pre Engineering AA 197 COLLEG E Central Florida Community Ocala Flordia Radiological 2 3/4 AS 1976 Health lechnolog:

OTHER United States Coast Guary N/A Flortrnnien Ovor n 90 yr p eriod JO B H ISTO RY MM COMPANY / ADDRESS VCUR T IT L E DUTIE S ftoM ro 9/81 12/81 Catalytic Inc.

Performed inspections at Florida fef[s Power Inc. Crystal river unit 3.

j PO Box 1586 r al I6C Crystal, Florida Mechanical 1

2/81 9/81 R & L Technical Service 4QC Inspector Performed inspections primarly l

electrical and record verification Georgia Power Co.

"~

l EI Hatch Plant 5/80 12/80 Catalytic Inc.

Performed inspections at Salem 1500 Market St Nuclear Generating stations Philidelphia PA 19102 QC Inspector units # 1 & 2 and Davis Bessie Nuclear generating station 3/80 5/80 Allied Nuclear Inc.

Performed radiation protection 39187 Liberty St duties under refueling outage Freemont CA 94538 Health Physics or repair conditions at Crystal Technician River Unit #3.

4/74 3/80 RAD Services Inc Health Physics Salem Nuclear Generating Stations 500 Penn Center Technician 1 and 2 Pittsgurg, PA 15235 Three Mile Island Nuclear Generating Stations 1 & 2.

2/79 3/79 Chem Nuclear Inc Health Physics Connecticute Yankee Barnwell SC Technician Nuclear Generating Station

~

t PS 2-

/y Sa f

JO B W 1STO RY

"# /"

COMPAMY / ADDRESS YOO R TIT L E DUTIE S Fr.o m I ro 1 2/78 1/79 Institute of Resource Radiation

! Oyster Creek Indian Point #3 Management Inc.

Protection lCalvertCliffs lBethesda,MD Technician

! Indian Point #2.

4/55 7/75 United States Coast Performed inspections, maintenance, Guard Master Chief training, repair, etc on all types Electronic electronic equipment on all types Technician of units in the United States Coast Guard.

e

I l'.3 AL A G M 5 U M E.

[N ORGA n t 2 A T IO N LAST NAME m7 MME DATE WOM M CPCo NIC MPQAD KLINZING, RANDALL DAVID 1/27/82-126 EDUC.ATION YEArG DEGFIE E.

SCHCO L NAME.

CIT Y STATE MAJOR ATT.

8 CATE

~ MIGN Dysart Geneseo High Dysart Iowa 4

COLLEGE Chapman College Orange Co., CA Engineering 1.5 W r2 Cest2

^ccum:Idc, CA OTHER US Navy Electronic Tech A & C Schnnin crn n e l nt g e I11 r!

t.,7 - ;

OTFIER Devry Institute of Tech Audio Engineering 2 6/76 JO B H ISTOR Y

/#

COMPANY / ApORESS YCOR T IT L E DUTIE S rom ru 6/81 1/82 Continental Power QC Inspector Inspection and documentation of all 14755 Grover St Level II electrical installation during refue l=

Omaha, Neb 68124 ing outage. This included three mil r island modifications.

8/79 6/81 Bechtel Power Corp QC Inspector 1 nspection and documenation of Imperial Highway Level II electrical instrumentation, piping Norwalk, CA next trace installations.

Hydros of piping code data package walkdown ;.

8/73 8/79 US Navy ETI Electronics Tsch.

I P3 E3 4L A S RE 5 u u E O Nr/w 2 A T :O r4 LAST NME mbt NAME DATE MPLOYsi NG MPQAD-QAE-Fluid / Mech CAMPBELL, J. SCOTT 3/1/82 EDUC.ATION WEA RS DEGI E E SCHOO L NAME.

CIT Y STATE M A JO R ATT.

t 0.E HIGH Ashbrook liigh School Castonia, NC 3

f" COLLEGE North Carolina State Raleigh, NC Nuclear Eng 4

OTHER OTHER JO B H ISTORY

" /"

COMPANY / ADDRESS VOOR TIT L E DUTIE 5 rcom ro On Shift Reactor Engineer 6/75 6/78 Georgia Power Co Tech write of mitial startup Assoc El Itatch Nuclear Plant test program procedures (fuel load Eng*

Baxley, GA to warranty run).

member of plant technical staff 6/78 7/79 TVA Engineer Prepared materials for use in liartsville Nuclear Plant QA (training instruction and certification of Ila r t s vi l l e, Tn construtction) mechanical QC inspectors.

8/79 9/80 CE Advanced Reactor QA Engineer Performed planning, review and Systems Dept 175 Curtner Ave surveill nce f r p rt procu reme n t,

San Jose, CA assembly, and testing of secondary Control Rod System hardware for Clanch D r_ > r 11/80 11/8' LA Power and Light Engineer Development of system to compile Water ford-3 plant Tracking client commitments and reg's concerning Killona, LA Program startup, ope ra t ion, administrative control into a computer system.

l l

l, I

l I

~

I Ps ALAS RES UM E 08.0AN 4 2 AT ION L.AST NAME FIRST NAME DATE EMPLOYE6 No.

CPCo MPQAD

Palmer, Brien 12/11/81 SAI-105 EDUC.ATION

! nTE SCHCO L NAME.

CIT Y STATE MAJOR ATT.

O MIGH Riverside liigh School Painesville, Ohio College Prep 3

Ce 1 gy and B.A. 6 COLLEGE Ohio Wesleyan University Delaware, Oh1 Philosophy 4

B.A.

1975 OTHER OTHER JO B H ISTORY Mo/vR COMPA NY ADDRESS VOOR TIT L E DUTIE S rom tt)

Supervised 35 employees. Write Administrative nd revise procedures and instruc-6/76 9/78 US Testing Company Assistant to tions. All document control. Audit Perry, Ohio Proj.ect Superviso:- and client liason.

All QA responsi-Nuclear Plant (Civil Level II) bilities of lab.

Originated 100,000 A m e n~o r, r F; 1 o nymton QC Supervisor for Supe rvised 5 employees.

Wrote and/

L.K Comstock E.ngineer-Civil, calibra ton or revised all civil-related pro-9/78 IV80 ing Company and receipt insp.

cedures.

Performed Civil QC in-(Level II Civil 6 spections.

Fill-in Field Engineer

,y Electrical) and Surveyer.

Quality Engineer-Supervised 7 man utility surveill-11/80 11/81 Public Service Comp, ing Construction ance group performing overview in-of Indiana Surveillance spection and document review.

Re-Marble 11i11 (New Wash-Supervisor vised surveillance programs.

Re-ington, Ind.)

(Level III Civil) viewed contractor procedures. Eval-Nuclear Plant uated adequaev of contractor's QA/QC Programs.

l l

i

AL A G cusuk a.

.. p q

',OkCr6to 2 AT ION lab 7 h4ME FIRST NAME DATE.

EnPJcycf ti SAI for CPCo.

Sweet Gerald L.

3-1-82 EDUCATION SCHCX)L.

NAME.

CIT Y '

STATE.

M A JO R D(D\\F ch a'

HIGH Vocational Draft is

'~

Port Huron Northern Port Huron, MI Math Sciences 4'

f9ff J

CDL1EGE College St. Clair County Comm.

Port Huron, MI Vocational Instr 2

OTHER Hashtenaw Comm. College Ann Arbor, MI Welding Tech.

1/2 OTHER Welding School Lincoln Elec. Comp.

Cleveland, Ohio Welding Tech.

12 wks.

JO B W ISTORY Mo/vR COMPANY / ApDRESS YOUR TIT L E DOTIE S stom to

, Science Applications, Assigned to Mechanical / Welding Inc.

Disciplines, Responsible for Public Service Ind.

0/A Procedure Dev./ review &

P.O.

Box 190 surveillance of procedure imp-New Washington, IN.

lementation 4-nn 1-n7 47162 O/A Eng.

Bechtel Power Corp Q/C Eng.

Responsible for first line Midland, MI inspections & documentation s-79 4-nn Responsible for inspection &

documentation of piping & weld-ing.

Coordinated & oversaw Corp NDE Subcontractors with final Foster Wheeler Energy acceptance responsibilities.

8-78 5-79 West Olive, MI QA/QC Eng.

Responsible for testing &

certifying welders QC for all welding activities, Coordinator

Corp, and acceptance of subcontractor Foster Wheeler Energy Welding & Tech./NDE a-77 8-78 Homer City. PA OC Eng.

St. Clair County Col.

243 Eric St.

Instructor Voca Instructed courses in welding, 1-7a g_77 Port Huron, MI 48060 tional Tech.

drafting, & metallurgy e

.3

- JO B W ISTOR Y M /V #'

COMPANY / ADDRESS YOO R TOLE DUTIE S From 1 Tb l

Pipe fitter -Local i190 Journeyman, pipe-Certified pipe welder in SMAW, 6-68 1-74 Ann Arbor, MI fitter, welder

.GTAW & MIG Process g

4 3

0 e

e 8

l-

JL AG RE S U M okvAtoJ570tt t.%7 7.nME M 57 NAME DATL Etificycf t.

(Jr.,

450-367 coco Lo..und n Frederick J.

42-4885-EDUC.ATION sctCO L NAME.

CnT Y -

STATE M A JO R g

f

's M

11tGH X$

Soo !!ish iault Ste. Marie,MI 4

_N COLLEGE ssoc.

Lake Superior State Col. 3ault Ste. Marie,MI 3ech. Eng. Tech.

3 1971 OTilER OTilER JO B 111 STORY COMPANY / ApDRESS YOOR TIT L E DUTIE S It.o M TV Total inspection of HVAC Equip, and componants, including hgrs.

and ducts.

JPCo.-Midland Nuc. Plt.

II 1-82 Pre.. 41d land. MI 3A Inspec.-Level Receipt inspection of all in-coming gas and electric line material for conformance to CPCo G.O.

CPCo specs.

Material Services 5-79 12-81Saginaw, MI Material Inspec.

Disposition of obsolete and surplus materials and equip.

CPCo G.O.

Material Services 3-78 5-79 Jackson, MI Gen. Serv. Assoc.

Design of electric distribution substation structures.

CPCo G.O.

Distribution Eng.

6-71 3-78 (Electric)

Eng. Designer

~qEs'YN ALAG okoy23grrl L%T hME nns7 nAnE ohm E neton.i n Consumers Power Kucharek Robert 2-24-82 SAI #93 EDUCATION SClio o t NAME.

CIT Y '

STATE.

M A JO R

[T tc a

o ggggg College Prep./

IIs Gaylord High School 3aylord, MI Arch. Drafting 4

5 J

Cott.EG E 1975 Delta College Jniv. Ctr. MI Assoc.-Arch. Tec 1 3 Assoc.

OTHER OTilER JO B H ISTORY COMPANY / ApDRESS YOUR TITLE DL) TIE S (LO M T1)

3. C. Hendrick & Son L27 Atwater St.

2-80 2-82 ;iacinaw, MI 48605 Job Off. Mgr.

Complete Job office 3DK Builders 33 N.

Five Mile Self employed-All phases of th<

3-78 2-80 ildland, MI 48640 Principal Owner complete operation Nons Bldg., Inc.

611 Railway Overseeing all on-site opera-9-77 3-78 Sanford, MI Job foreman tions I

i l

l l

l i

t

y.-

9 4

+

4AG REsuul A.

,e O Mr6 H 12 4 T IO N (SA1)

L%T PdWE F AR57 NAME DATE.

E nPJ cyc f tc Contracted for CPCo-Consumers Power Co.

FABEL Lori L.

3-9-82 SAI-2 EDUCATION g g ((

SOCOL NAME.

CIT Y '

STATE MAJOR 26 s'

piGn Madison liigh School Madison Ohio College Prep 4

-n

-E 5I a

Bowling Green State Bowling Green OII Elementary Ed.

1 CDttEGE Lakeland Community Col. Mentor Ohio Liberal Arts 1

Associa x OTHER OTHER JO B H ISTORY M

COMPANY / ADDRESS YOUR TIT L E DOTIE S usM to Control of QA/QC documents.

2/82 Pre.' SAI - contracted to QA/QC Consultirg Working with controlled CPCo. - Midland Nucl.

Services drawings.

Plant - Midland MI.

Continental Power Responsible for the control of (Comm-Lord J.V. )

Quality the QA Document Filing System.

2/81 Ll/81 Marble Ilill Nuclear Assurance Processed all NCRs and CARS.

Station Document P.O.

Box 189 Coordinator New Washington, IN.

iiOME Of flCE 14755 Grover St.

Omaha, Nebraska L.K.

Comstock Eng".

Responsible for the implementa-2/80 2/81 Co.,

Inc.

Secretary to tion and control of all QA/QC Perry Nuclear Plant the QA Manager documents.

Also, performed all P.O.

Box 324 secretarial duties in the office Perry, 011 which included personnel time IIOME OFFICE:

sheets, attendance records and 920 Ft. Duquesne Blvd.

'"Uncaly manpower recoras. Assured Pittsburgh, PA.

all vendor audits and evaluations!

were performed.

1 liubbell Industrial eurchasing and rypea purchase grd rl"ls.eSain$enos d ~ ic air bi a] n 6/79 10/

Controls Division Production Con-orice quotes, 79 50 Edwards Street trol Clerk p.o.

f21es Madison, 011

- JO B W ISiO R v M M' COMPANY / ADDRESS YOO R T rT L E DUTIE S Fro m l rio l

~~

Lakeland Community Col. Receptionist Answered 14 phone lines.

8/78 G/79 Nursing Department Typed all dept. examinations, Route 306 reports and correspondence.

l Mentor, Ohio Typed all student evaluations i

from a dictaphone. Maintained student files.

Fisher BiSL Wheel Office Girl Performed all cash deposits, 7/77 7/78 6570 N.

Ridge Rd.

processed daily cash reports, Madison, OH

- processed all charge card statements, and maintained payroll records.

o e

o h

B i

AL AG LG5uy l

l

/ N el2 6 TIO N L%7 MLME F 8K b7 NAME

DATE, E /qPj C yc( tv 60-9456 CPCo
Bishop, Robert 3-1-82 349-537-EDUCATION SoloOL NAME.

C IT Y-STATE.

M A Jo R E

g

. ' ~

lhGH j:!$@f

[

Vassar Hi_g_h Vassar, MI College Curr.

4 COLLEGE 5/77 Ferris State Big Rapids, MI Elec. Power Tech.2 Tssoc.

OTilER Spring Arbor Spring Arbor, MI Bus. Admin.

4 12/80 OTilER JO B 111 STORY "M

COMPANY / ADDRESS YOOR TIT L E DOTIE 5 FtoM ro CPCo Midland Plant 11-81 3-82 MPOAD-HVAC OC QA Analyst QA & QC for Nuc. Plt. HVAC sys.

I Wrote periodic Activity Control system (PACS) for Mechanical Maintenance. Made modifications

,CPCo to Mech. Procedures. Initiated l

Midland Nuc. Plt.

Sr. Eng. Tech.

computer input of data via a 1-81 11-8)

Maint. Dept.

Nuclear TSO term, tied to Jackson ccmp.

Performed transmission studies

& Power Gen. Studies, including l

CPCo load flows & short circuit anal Parnall Rd. Office Ran plant load flow studies via Power Resources &

Eng. Tech. & Sr. the computer. Performed trans-5-77 12-90 sya _ pinnning nept.

Eng. Tech, mission line reliability studiel Jackson, MI using stat. analyses, also j

aided by a computer.

l l

l l

l Filled in for absent workers -

performed most jobs in plant inc., visual inspection on parts i

Eaton Foundry heat treat, iron pourer, con-6-76 9-76 Vassar, MI Labor pool wkr.ntructed ladles.

l e

JO B W ISiO R v Mo /v r' l

COMPA NY / ADDR ESS Yo0 R T ri L E DUTlE S reon l rv l

Maintained park facilities, inc., ball diamonds & erected lVassarCommunityEd.

& Rec.

5-75 9-76 Vassar Ifigh School Park Maine.

e 3

e 9

e e

e O

6 s

1

I r.3 g

AL A G su w u r~.

OP f, A NI Z A T iOH LA$i hMME I sM57 Na rf L:

DAi F.

M ovsf t10 '

Bechtel Quality Control Bearden William 3/10/82 814083 EDUCATION y[ A RS DLGn E E.

54HOO t.

NAME-CIT Y STATE M A JO R Att

( D.W E l'M Pala Duro Iligh School Amarillo, TX College Prep 3

(ott tGE.

Amarillo Jr. Collene Amarillo, TX blath 2

1968 I)ata O THER lil Centro Jr. College llallas, TX Processing 2

1971 OTHER JO B H isTORY

" /"

COMPANY / ADDRESS YOUR T IT L F_

DOTIE 5 it 0 M TD Penetration closures, ident-ify, problem resolved, inter-Bechtel Power Corp.

face 6 monitor S/C, inspectior Grand Gulf penetation 6 closure, docu-7/81 1/82 Port Gibson, Eli s s.

Ass't. Engineci mentation 6 closure detail.

Inspection, documentation, 6 review of raceway supports Bechtel Power Corp.

and bracing, and noncon-Grand Gulf Ass't.

formance reports.

2/80 7/81 Port Gibson, hiiss.

QC Engineer Inspection, documentation, and review of cadwelding minoi Bechtel Power Corp.

inspection of concrete place-11/

Grand Gul f Ass't.

ment 6 preplacement, rebar 78 2/80 Port G i b s o n, bli s,s.

QC Engineer struct. steel and boltinn.

Cadweld dwgs, receiving documents log, dwgs. distri-f Bechtel Power Corp.

bution, documentation distri-11/

11/

Grand Gulf Ass't.

bution, vendor dwgs. logs.

77 78 Port Gibson, h!iss.

Engineer g

f s

t:

Bechtel Power Corp.

Grand Gulf Ass't.

9/78 5/ 7 Port Gibson, h!iss.

Engineer Inspection of pipe hangers.

I 0

Ass't. supervision of con-Bechtel Power Corp.

crete, main duty curing, day 11/

Grand Gulf Ass't.

shift supv. of concrete place 6/75 77 Port Gibson, 51iss.

Engineer ment set-un 6 clean-up.

I m

Ataa ursuu2 o p (, A N 8 2 6 T IO t1 LAST NAt1E F sM57 NAME OteiE E/1PlCY1f NO.

379-Bechtel Quality Control Bigcraft William 2/22/82 38-1338 EDUC.ATION scitoot.

NAME' c.lT Y STATE MAJOR T

E

~ HIM Jackson liigh School Jackson, h!I General 3

Jackson

\\ssoc-B5 CDLLEG E, Community Collene Jackson, h!I Business 2

4/81 OTHER OTilER JOB :MISTORY M M coMPAt4y / ADDRESS YOU R TIT LE DOTIE S It o P4 TV Functionally responsibic for overseeing dielectric and Construction acoustic emission testing 12/

Consumers Power Co.

h!ethods of the companies bucket 81 2/82 Jackson, h1I Analyst truck fleet.

Inspection and control of 46KV pole line construction 12/

Consumers Power Co.

Sr. Construct-on the companies system.

9/76 81 Jackson, 51I ion Advisor Cost estimating - calculat-l ions, determine equipment

(

Consumers Power Co.

Engineering location, load flow studies 9/68 9/68 Jackson, blI Technician computer programmine.

s 3

I i

I

  1. 3 AL A G cu s uu G o k O A N12 /s i lO N LAST ' N AME 7 sMST NAME
DATE, CMPJCYst No.

Bechtel Quality Control Clay Charles 3/10/82 238445 EDUCATION

^"

soloot.

NAME CITY STATE M A JO R TY (C

~ HIM Troy liigh School Troy, MI General 4

m COLLEGE Oakland Community Collene Avon. MI General 1

None Eastern THER Michigan University Ypsilanti, MI General b

None

.OTilER JO B M ISTORY M M -

COMPANY / ADDR ESS YOU R TIT LE DL) TIE S ROM TO Operation and maintenance of naval nuclear power plants.

In submarines performed, 11/

Machinest Mate supervised, planned, tested 75 2/82 U.S.N.

First Class and documented maintenance and repair on various mech-anical fluid and high pres-sure air systems on the RX plant and auxillairies. Per-formed insepctions of re-pairs and maintenance per-formed.

Supervised and per-formed evaluations of 14 persons in my division.

E 3

h

I o.s ALAG nisuus o p tahres t h i nott LAST knnE.

mbt NMiti DNil EnFicrLi tso.

Bechtel Quality Control Cline, Jr.

Richard 3/10/82 967224 EDUCATION

$[ f g,(fg scHoot NAME-CIT Y STATE M A JO R Kelloggsville liigh Wyoming,hil College Prep.

4 A

Electrical co m iaginaw Valley State Saginaw, h!I Engineering 2+

1982 Technology OTHER

.OTilER JO B M ISTORY COFLPANY / ADDRESS YOUR TIT L E DOTIE S flo ti TV h!cDonalds 12/

Saginaw Road Cook; and close down 5/81 81 blid land, 511 Grill Closer erill area af ter close.

51cDonalds S.

Division Cook; and close down 6/80 9/ 8(

Grand Rapids, h!I Grill Closer grill area after close.

h!cDonalds S.

Division 3

6/76 6/79 Grand Rapids, 511, Grill Opener Cook and open up the store.

i I

e I

E 679 AL A G Rf S u %% f.

oY luhtd lis T 5094 LA'ai 94hML l 6%I NAMh ChiE.

L E ICYNE N O-Bechtel Quality Control Custack h!atthew 3/10/82 967249 EDUCATION v1ARS DEGR E E.

Soloot NAME CIT Y STATE M A JO R ATT.

/ DATE M

Flint Northern Iligh Flint, 51 1 College Prep 3

CotttGE Saginaw Valley Electrical State College Saninaw, 51 I Ennineerine 2

1982 Central omER Michigan University Mt. Pleasant, MI Math 2

1972 bI ll

'OTHER Community College Flint, MI Math 1

1979 JO B 111 STORY M M coMPAr4Y / APDRESS YOUR T IT L E DUTIE S ft0M n) f 7-11 Cashier, stock person, Gratiot Road janitor - (mopping and 3/81 9/81 Shields, MI Cashier general clean-up).

Chevrolet Metal Fabricating Plant, Bristol Rd.

Operation of a fender 5/78 7/7F Flint, MI Fender Bender bending press.

Reigle Funeral Receptionist, flower arranger flome, Clio Rd.

client pick-up.

5/70 8/ 7 ':

Flint, M1 Done Designated l

l l

I I

i i

i

in i ALAG RE suu s oru, A NI Z A T ION LAST NAME 7m7 NAME DATE Et#J Cn( two.

Bechtel Quality Control Deslippe Mark 3/10/82 967168 EDUC.ATION solooL tJAME~

c tT Y STATE M A JO R T

$ DA pigg University of Detroit liinh School Detroit. MI Collece Pren.

3 e

Electrical COLLEGEL Marquette University Milwaukee, h'I Engineering 215 1981 Electrical O*EE University of Detroit Detroit, MI Engineering 1

1982 3

OTilER JO B

.H ISTORY COMPAt4Y / ADDRESS VOOR TIT L E DOTIE S FloM TO Farmington Nursing Ilome Repair of electrical and i

5/78 8/78 Farmincton MI Mech. Maint.

mechanical eauinment.

10/

Marquette Universit> Electronics Cabic pulling, routing 78 3/79 Milwaukee, h'I.

Installer and terminations.

Installing, inspecting, and Gallagher Fire servicing automatic fire Systems systems, electrical and 5/79 8/80 Farmington, MI Systems Man mechanical aspects.

W G

ii i

I B

t

  1. .s U ALAG RE 5 u u s okGANi4 Tron LAsi NAME Ox57 N4 r1E DAiE EMFACf6C Na Bechtel QC Edwards Lane 2/16/82 967476 EDUc.ATION

~

VIARS DEGR E E.

saloot.

NAME ctTY STATE MAJOR

477, g og7g_

College f b' HIGR Eden Central Eden, NY Entrance 4

None Gannon College Eric, PA Chemistry 1.5 12/75 None OBIER Millard Fillmore Col.

Buffalo, NY Civil Engin.

.5 12/82 OTilER JO B.:H ISTORY M /YR COMPANY / ApDRESS YOUR T IT LE DOTIE S froM TO 4/79 2/82 L. M. Edwards Owner

-All phases of concrete Concrete Co.

work 2800 W. Pleasant Avc

-Minor work in plumbing and Eden, NY 14057 carpentry 4/76 4/79 Edwards Concrete Finisher and

-Concrete testing, placing 2819 George St.

Supervisor and finishing Eden, NY 14057

-Placement of personnel 3/75 3/76 Town of North Collii s Laborer

-Ilighway maintenance and liighway Department inspection Shirley Road North Collins, NY 14111 t

a e

l i

S l '.S ALAS 4rsvus OMr AH 6 Lh18094 LA%1 NAt1E IuthT NME 04 2.

Er)FicYLE no.

364-Bechtel Quality Control Evans John 2/22/82 38-2597 EDUCATION 54tbot.

NAME ctT Y STATE M A JO R TT

$0 Jackson Iligh School Jackson, h!I Science /hfath 4

w.e COLL EGE.

I,awrence Inst. Tech.

Southfield. MI B.S.E.E.

1 1967 OTHER OTilER JO B M ISTORY

" /"

COMPANY / APORESS YOUR T IT L E DL)T IE S Ff oM TV Acceptance Quality Control of major Elect, bulk power equip. - Quality Assurance Consumers Power Co.

Equipment coordination of vendor U.R.D.

9/71 2/82 Jackson, 511 Coordinator product testing. - A1plicat-ion coordination of Julk power equip., specification drawings approval.

Layout inspection of vendor products, set up procedures 12/

Iluebner Corp.

for QC in accordance with 69 9/71 Jackson, h!I QC Supervisor requirements of ford Q-101.

4

[

Lear Jet Industries Coordination of product de-f 11/

Stereo Division ficiencies resolution with 9/67 68 Detroit, 51 1 QA Technician industrial engineer's.

b i:

Evaluation of final testing Control Data Corp.

for peripheral computer 3/69 9/67 Roches t er, 511 QA Technician equipment.

l f

Production testing of scaler-h!artin h!arietta Co.

and adhesives for auto-3/58 1963 Jackson, 511 QC Technician motive industry.

'k o.s \\

1 ALAS REsuuc g

)

os.c, Ar.i m nor.

usi met us7 u m:

oAre.

Enhovse no.

Bechtel Quality Control Fayerman Boris 12/14/81 906466 EDUCATION 50100 L NAtoE.

cit Y STATE M A JO R j^T C

E

~ MM Iligh School BAKU, Russia 10 COLLEG E, 51a s t e rs industrial University B A KII. Russia Encineerine 5.5 1965 OTHER OTilER JO B H ISTO RY COMPANY / ADDRESS YOUR T)T L E DUTIE S IE D M TO Designed electrical control for automobile welding sys-Blid-Western tems and equipment and also Processes, Inc.

for chemical plants j

7/81 9/81 Stadison Iici ght s, til Designer systems.

8 Designed electrical control l

and instrumentation:

i Petrochemical

- Functional and block l

Research Institute

diagrams, 1968 1980 BAKil, Russia Sr. Engineer

- Electrical wiring diagrams j

interconnection and assem-bly wiring diagrams,

- Blain and local control panels.

l Typical Industrial Proj ect :

1. Water supply systems for l

petrochemical plants:

- Control and measurement l

with local control stations l

2.

Gas fired steam boiler in-l stallation for petroche-l mical plants

- Combustion and level con-8 tols 3.

Conveyors and material handling systems:

- Control stations

- Relav and pronrammable controllers

[

l

- Stass flow and weight trans l

dulers and switches

P9 2-4 Boris Fayerman (continued)

JO B W1STORV M #

COMPAMY [ ADDR ESS YoOR T IT L E.

DUTIE S ra e I ro i I, Designed schematic and wiring l diagrams:

jEngineering and jl. Power distribution in-Design Company Electrical sta11ations:

1966 1968fBAKU, Russia Engineer

- Electrical wiring diagrams interconnection and assem-bly wiring diagrams 2.

Relay protection schematics 3.

Electro - Welding Systems a

i e

I i

i; 9

U

i e3 Q

ALAG RE S U M L b

OMsAN6 447 Ott Lwi NAME F arb7 N A Mfi DATE.

El1ffovii NO.

Bechtel Quality Control Foose Nelson 12/21/81 967079 EDUCATION Scioot NAME.

CIT Y S7 ATE M A JO R T

C E

Manherm Township l

" 'G" lligh School Neffsville, PA General 4

CottEGE BS Wheaton Collene Wheaton, fl.1, Biology 4

1976 Pennsylvania (Jni ve rs i ty OTHER State University Park, PA Genetics 2

N/A OTHER JO B H ISTORY M bR COMPAt4y / ApDRESS YOUR T IT L E DOTIE S Itot$

ru Quality Assurance and Field 1.evel II QC Quality Control of nuclear 10/

11/

Oliver B.

Cannon Coatings coatings at WPPSS I f II j

i 79 81 Philadelphia, PA Inspector sites, Richland, WA.

i l

1 10/

10/

Coyne Construction 78 79 State College, PA Carpenter Residential Construction.

l 1

i f

Pennsylvania State Assist on design, construct-10/

University Research ion f, implementation of 9/76 78 liniversity Park,PA Assistant forest nenetics experiments.

i I,

I t

c s

t.s 1 ALAG RE 5U u d J

DtTE E/SPACYsf 14 0.

o kCr A NI Z A T IO N LAST NAME F #RST NAME i

Bechtel Quality Control Gabel Donald 12/21/81 928247 EDUCATION e7[

50 COL NAME CIT Y STATE M A JO R

~

Eagle River Iligh Eagle River, WI General U

University of WI Superior, WI English 2

OTHER Several specialized training pregrams.

OTilER JO B HISTORY "M

COMPANY / ADDRESS YOUR T IT L E DUTIE S Mor$

70 Responsible for quality pro-gram, training and docu-mentation.

Field support Barber Greene Co.

startup and maintanence of i

9/77 8/81 Aurora, ILL OA Manacer asnhalt nlant couinment.

Sales, service support, train - l ing, modification, field i

support startup and maint-l Barber Greene Co.

enance of asphalt plant l

1/77 9/77 Aurora. ILL Sr. Sales Ene.

equipment.

[

Sales, service support, h

training, modification, field support startup and Barber Greene Co.

maintenance of asphalt 8/75 1/77 Aurora, ILL Sales Engineer plant equipment.

I' l

Design, test (in house 6 field) prototype and pro-l duction computerized asphalt i

l1/

Barber Greene Co.

Develope-plant control systems.

l 72 8/75 Aurora, ILL ment Engineer j

i Install, maintain and trouble

[

shoot computerine batch 12/

11/

University Comp.Co.

processing systems.

69 72 Schiller Park, ILL F1d. Engineer l

i

I

  1. 3 ALAG QE s u u f.

o kG AN a 26 T IQN LAST NAME F sRST NAME DAiT.

EMPJOYuf No.

Bechtel Quality Control Gretencord John 2/23/82 141 EDUC.ATION

$7f [gfg mcoL NAME-ctTY STATE M A JO R

~H M Ottawa Township liigh Ottawa, ILL General 4

CoLLEGEL A.A.

Valley Community Collet e Onlesby, ILL Pre-law 2

1973 OTHER Norther ILL University Dekalb, ILL Urban Stds.

1977

.OTilER JO B M ISTORY "M

COMPAr4Y / ADDRESS YOUR TIT L E Dt) TIE S froM ro A611 Engineering LaSalle County St.

issistant ioil and cement field and 6/73 6/75 Scueca, ILL.

]C Engineer lab tests.

Iron Workers Local LaSalle County Nuc.

Erection of structural 6/77 5/78 LaSalle, ILL Iron Worker steel.

Operating various banks of heavy machinery in the i

12/

Union Carbide Co.

leavy Machineryproduction of plastic i

5/78 78 Ottawa, ILL Operator film.

l

~

l l

Figure rates, weights, and

(

in and out frt, shipments.

t Rock Island R.R.

Station Computer control of trains and l

1/79 4/79 Ottawa, ILL.

Manager the transportation network.

l t

Sheridan Correct-Run all Phys, Education

[

12/

ional Center Gym Coach 6 activities, coach sports, 4/79 79 Sheridan, ILL Supervisor and supervise inmates.

i l

Inspection and signoff of 10/

Transco, Inc.

all materials in' stalled and 7/80 81 Chicago, ILL QC Manager maintaining all quality docu-

u. c u t a,

P"3 4AG REsuu d O KCr A hi 2 A T :ON LAS T NAME FIRST NAME DATE.

EMPACyst' N O.

Qua1ity Control flopkins Roger 12/1/81 906555 EDUCATION YEA RS DEGR E E.

SCHOO L NAME.

CIT Y STATE M A JO R a

pt ggg HIM Interboro ll.S.

Glenolden PA Academic 4

Univ. of DL Newwark DL Chemical Eng.

1 No/195(

CONE Univ. of AL Mobile AL Chemistry 1

No/197 OTHER 11SAF Radar Repairman Keesler AFB Autotrack Radt r3/4 l

Biloxi MS Maintenance

~A rnrt i

l Blueprints, Drafting Ingalls Shipbuild - Af ter IIours OTHER Oil Rig Const., Maint. ing Pascagoula MS Courses 3MOS Cert l

JO B W lSTO RY CCF1PANY / ADDRESS VCO R T IT L E DUTIE S rom ro Tech. h'rit er -

Revised Power 6 Lighting Managerial Ass' Tech Manuals in accordance 10/

Ingalls Shipbuildin3: Nuclear Elect.

with contract changes, pre.

44 9/81 Pascagonla, MISS rical Inspector pared reports of progress me

., g c + : 7.,,

q, spected for procedure com-pliance and installation I

of electrical equipment.

Inspected installation of f

electrical equipment (sur-face h ; ju ),

rcj,arca dccu g

ments to perform work in i

nuclear area of subs, re-solved problems with elect-rical engineering for con-struction of panels for j

muus, iu.ma11cu c icm ma i equipment.

l i

I i

1

0 m

L

>taa ursuus

).

o k t, APH 26 T iOri LAST Nhf46 F ut>T N A P.F.

Oto E CIVJors( two.

Ilechtel Quality Control Kent E.

Earl 3/6/82 504721 EDUCATION Y7(' [gf 54 Hoot.

NAME' ctTY STATE M AJO R

~" "

LaGrange liigh I.ake Charles I.A 1

International Structural 1953 gg Dhlomo Correspondence School: Scranton, PA EngineeringCou se International blodern Super-OmER Correspondence School: Scranton, PA vision Course 1962 Diplomo OTHEg Quality Engi-CA State University Northridne. CA neerinn Course 1978 Cert.

JO B H ISTORY M /"

COMPANY / ADDRESS YOUR TIT LE DOTIE S froM TO Bechtel Power Corp.

In training for certificat-12/

hlidland, h!I Senior ion in piping and pipe weld-81 2/82 Project #7220 QC Engineer ing inspection.

Bechtel Power Corp.

12/

Palisades Nuc. Plant Senior 9/81 81 Covert, h11 QC Engincer Weld inspection.

Bechtel Power Corp.

Songs #2f3 J

i Nuclear Plant Welding inspection, docu-

{

10/

Proj ec t #10079 Senior mentation review and pre-80 9/81 San Onfre, CA QC Engineer para t ion o f N-5 forms.

i Welding Technical Supervisor l

10/

Fluor Engineering-Nelding in Venezuela, South America.

4/80 80 Irvine, CA Engineer Welding Engineer in CA.

i f

I Boyle Eng. Corp.

l (on Diemer Intestic Field Welding 5/79 3/80 Pipeline)

Inspector Weld inspection.

0

(

Review of structural engi-The Austin Co.

Structural neering Dwgs, and 6/78 2/79 Irvine, CA Job Captain Blueprints.

P+ 2 E.

Earl Kent JO B W !STO R Y COMPAMY / ADDRESS YOU R T i1 L .

DUTIE S raem to i l

l Prepared design and instal-

'WP Div. of jlationdwgs for equipment 6/71 6/78fJoyMfg.

Co.

Designer iper AWS D1.1.

Wrote welding procedures G inspection instructions, performed procurement source inspections G investigated QC Engineer product quality problems.

Prepared welding charts, tables and examples.

In-vestigation and resolution 10/

1,itton Industries Senior Welding of welding problems.

69 5/71 Culver City, CA Engineer Structural steel detailing, Riverside. Steel and drawing review per AWS, 10/

Construction Structural AISC, and UBC Codes.

4 9/68 69 Sante Fe Springs,CA Steel Detailer i

Correlated architectual, structural, civil, and 4

Daniel, Mann, John-mechanical dwgs. for accur-l son 6 Mendenhall Structural acy, conflicts, and struct-8/65 9/68 1os Angles, CA Dwg. Checker ural integrity.

i s' orth American Avia-Ass. Construct-Prepared drawing, job orders, j

2/62 8/65 tion, Norwalk, CA ion Engineer bill of materials, etc.

i l

Cerritos College Welding Taught evening instruct-Norwalk, CA Instructor ion in welding.

I 1, Yuba Consolidated

[

2.

HolmesGNarver,IncVarious Draft-Structural, design, de-

3. Albert C. Martin ing and Engi-tailing and drafting.

Plot-4.

Cryogenics, neering ting and evaluation of 4

5/52 2/62 Vicktor Equip.Co. positions test data.

5, Aerojet Gen. Corp j

6. Southwest Eng.Co.

7.

Univ. of South 1

CA i

1

P9.E E.

Earl Kent JO B W tSTO R Y COMPANY / ADDRESS YOO R T l'T L E DOTlE S run 1 rv f l

Welding I US Navy Const.

Instructor 6 l Instruction in electric 6 3/46 5/52fBattalionCenter Welder

!oxyacetylenewelding.

7/43 3/46 (JS Navy Shipfitter Metals work.

Ilouston Shipbuilding.

6/42 7/43 Ilous t o n, TX Welder Welding in shipyard.

9 i

l 8

I I

i i

1

i r.3 AL AG R1 h u u E onshu s zh1 \\o rt usiNAME hRbT HAME DATE.

EnFICril tso-Bechtel Quality Control Kexel John, Jr.

3/9/82 541122 3

EDUCATION scHoot.

NAME' ctT Y STT.TE M A JO R D

~ M l" i

Fitch Sr. High School Groton, CT.

General 1

CottEGE.

US Armed Forces Camp Casey University of h!D.

Korea. US Army GED 1

1963 i

Board of Education Di lloma OTHER State of CT.

Hartford, CT.

General 1969 OTilER JO B M ISTORY COMPAt4Y / ADDRESS YOUR T1T L E DUTIE S It 0 M TV Continental Power Lead Inspector coordinating Station - h!arble inspection activities 6 re-l Ilill Nuclear Gen-Lead Inspector viewing documentation gener-12/

erating Station Electrical ated by inspectors.

Resol-5/81 81 New Washington, IN Level II vinn quality related matters.

Interfacing with engineers 4

and superintendents.

Stone 6 Webster Inspected duct lines, con-Engr. Corp.

Level II duits.

Trays, tray supports River Bend Station Electrical and embedded conduit and l

2/81 5/81 St. Francisville,LA Inspector tray supports.

I l

Performed second-line inspect-l ion to assure the electrical Kaiser Engincers, Level II contractor was properly im-1 Inc. - Perry Nuclea: Electrical plementing his quality prograr 6/79 2/81 Power Plant Inspector per specifications.

j l

Persy, Ohiv

{

l Inspected conduit}, conduit l

supports cable pulls, termin-y Bechtel Power Corp.

Level I ations and switchgear and hiidland Nuclear Power Electrical

>!CC's all safety related cabit 5/78 5/79 h!idland, BII Inspector tray supports, hilti anchor Dolts.

General Dynamics Electric Boat Electrican S Starine electrician on nuclear Eastern Point Rd.

Procurement submarines installing elect-Groton, CT Inspection rical components on subs pro-5/72 5/78 curement inspection, nonde-1

79

?-

o, o.

Kexel, John, JR.

JO B W !STO R Y I

COMPAMY / ADDRE.SS Yo0R TIT L E DOTlE S rnom I ro i I

!structive material I

l verification.

l i

Installed f repaired commun-4 ication systems,'also in-11/

US Army Communications spected installed commun-4/62 72 F1d. Communications Chief ication systems.

i i

i i

1 I

-l l

i

ni O

ALAS R.E 5 u u f.

9

\\

o M,/$ Ni z AT ao N LAST NAME M ST NAME DGE EMPlWcf M.

,.,.._1..)

o.,' _ '. o

.',,m,,

c o u,,1 s

o,.

..t-.t t,

i EDUC.ATION YEA RS DEGRE7 5000 L NAME.

CIT Y STATE MAJOR m.

( DE HIGH

o :' 1 r:11 :n it..

, a01

'.C-11 tan, bi o Colh,

'r,.

'e

'7 L> d r * * ' ~ '

CC'

'1.~...

"'5..,_.4 COLLEGE e,

'4,,,

1 7-

~-

OTHER

.v.

"> a...*

c ' y.. <, > -

i H. '.: *', " ch'.

a..

m ' ' ". r 4 '

.e..

3,,

i 2

OTHER JOB HISTORY MM COMPANY / ADDRESS YOOR T IT L E DOTIE S FloM to M cil

' w :.e"1 tim ~ c ra t rM 1r cifil 1-

.nr

..i,,>i,,,

,y,

3.- -.

. i. m, m.,

a. i,.- s. -.~,.,

.,,,,.a_n,,

u....

-.~

3.,,.
o.,.,,,q g..,,.,. ~,

> p.

i.;

. p..-

p..

s 4,

v_ m.c = r.,., a.g., +,,,, mr.,.,.,,, a. ~.. i,.

c ',:

}_'

}-

pi, gyp p

r, i

n 7,3,4

{n4 1 -- 1. { } } { v 8

=b

.. - u. 4. p _

5_

,.,n.

- - - 4.

,a...,.

m..

I

=m.

1 m

'.. 3e3

,Iv. b.,..1

,,,ya 37, k

+ ',

5-g3v4 s 9

Ci(- *,,14=,g h [3 4 P.,P.

m. E, y e s. e 7, 44 y* 9 i

bC

]

, ' i7 ) J'

',3

' ', j l,1 ' ' '

D F

s

.- - ~ ~.

r.e ;.1.

,e. ',1 4

.,.... -,_J,~,

s t

.,, - - 1, 7

.-n.+.,u.

17..

,, - 8 s

,r..Is e

, 4.A.

+1 b'.1 p"

L

,., r,;,

m t

_1.,

. f-..,,,,

7

.sA p O.., 4.,.,

4

.es 4 1

1

}.'

J 3

y t(

e

t. -

1, 7

  • t t

t

'i 6 1

a e

' 1

1 1
  • R

' s

+,,,

v,9 vi>

.s.,

e 1,

3 u.

l I

I L'

o w*

$4 e

y 4s

_sg l. 4 4

K'

. r s,

7 1

6. - '. 7.

.- p j, ~,- o A.

2,

u.

u

,3 s

7 1*

.~

A

.7 4

+

  • e

.t

-s

, t e.,

v.$

p, e&*-

.,6Ls'.t

+

, '. 1,

9 my' J

e 3

s

+ +

.es v

s.

e q

v pg. 2.

l 9

JO B M !STO RY Mo/vR l

COMPANY / ADDRESS Yo0R T ri L E.

DUTIE S FAom to.I G

9-73

/-74 Y pulla nti ablic choolo 7th

  • Oth ;rado instructor: inplo-Y nn11 anti,':Ilchi4;an In1. "d teacher

~.ent new curriculum nro. ject entitlnd-

':anufacturin - Tec'enolocy e

d

'-7 ?

6-73

'iouth ;atCuhlic lchcob

'loutigtto, ':1chien Ind.

"d.

tnacher D r.., i.r. ab ovo l

itankrda lab, tech, callit ratin-

. > uz. a e

r. o,<

,,one.nto,m carc,o G,orn.

e,.,,

m 7 "IN ' WD' ' !

' WW ' i "

196')

197r

':ia,io'aur, '~hio

, n,o, technicinn d5a1 indicatorn, m. ic rom et e rr,, etc.

l j

i 1

h h.

1 h

3 I

E i

y-

--..-,m

--v.

--_--,m.-

I 13 A L A ll nr s u u f.

O P G A t4144 T IO tt LAST NAME Ox57 NAME DATE E/1Pjoys( No.

Bechtel Quality Control Ko Jeffrey 5/10/82 967760 EDUCATION SolooL tJAME CITY STATE MAJOR

"^ 7 g e '[g 47

~HlW John Glenn fligh Bay City, MI General 4

COLLEGE.

51ichigan Civil BSCE Tech. University lloughton, MI Ennineerinc 4

1981 OTHER OTilER JO B H ISTO RY "M

coMPAt4Y / 4DDRESS YOUR T IT LE DOTIE S FloM TV

oncrete aggregate testing 12/

Champion, Inc.

supervision of batching 9/81 81 Iron Mountain, MI QC Engineer

)p e ra t io n.

i i

1 2

e, I

I l

i I

t

D '.)

AL AB RL su ui O Mr A P4116 T iO f.

L,WT NAME 14RST NArth DATE.

2/1F2Cys( No.

Bechtel Oyality Control Limper Edward 3/9/82 238487 EDUCATION stiloo t.

NAME clT Y STATE M A JO R

$7f g

Fulton fligh School Fulton, MO General 4

COLLEG E.

OT11EP.

OTilER L

JO B. M ISTO RY MM COMPAt4Y / ADDRESS YOUR T nT LE DOTIE S flor $

70 Bechtel Power Corp.

Job #7220 2/82 Pre-Midland, MI QC Engineer Terminations inspection, sent Lead Inspector over fire L.K. Constock Co.

protection. Inspected raceway, Perry Nuclear Power Level II cable pulls, and termination Plant Elect.

Review of paperwork of my 7/81 2/82 Perry, Ohio QC Inspector inspectors.

Responsibic for inspection of raceway, cable pulls, and Daniel Internation-terminations.

Lead term.

al - Callaway Plant Elect. Engr.

inspector 1/81 to 3/81 in 1/78 3/81 Reform, MO Inspector turbine and aux. b1dgs.

Performed material receipt, in-process, and final in-

[

spections for the mfgr. of 6

10/

11/

Mo. Mfg. Co.

Assembly switch boxes, transformers, l

76 77 llolts Summit, NO.

Inspector cct.

j.

t b

+

l ea ALAG RE S UM L onc, Ato 24T IOtt LAST NAr!E FioT NAME DATE EMP20Ylf NO.

Bechtel Quality Control Milandin Milton 2/22/80 642819 EDUCATION 50100t.

NAME clT Y STATE M A JO R T

C E

General HiGH Pascagoula Iligh Pascagoula, MISS.

College Prep.

12 COLL EC7 E. Centre Collene of Ky.

Danville, Kv.

Liberal Arts 1

5/74 San J se Electrical OTHER State University San Jose, Calif.

Ennineerinn 3

12/79 Welding OTilER Welding Trade School San Jose, Calif.

Technology 1

9/80 JOB HISTORY COMPANY / t,p0RESS YOUR T IT 1.E DOTIE S floti TV Used arc welding process to fabricate oilfield ser-L2/

Capital Welding,Inc vice equipment made of fillet 80 7/81 Ilouma, La.

Weldor and full penetration welds.

Allen helders Used arc and mig welding i

12/

Fabrication Dept.

processes to fabricate oil-6/80 80 llouma, La.

Weldor field service equipment.

I Performed routine operator l

Signetics Corp.

Computer functions on 300 IBM l

3/79 9/79 Sunnyvale, Calif.

Operator Computer.

Developed and maintained QC audit for manufacturing Signetics Corp.

area.

Performed various 9/78 3/79 Sunnyvale, Calif.

QC Technician product integrity test.

i Assisted in processing in-l tegrated circuit drawings i

Signetics Corp.

Design for computer implementation.

l 3/78 9/78 Sunnyvale, Calif.

Technician 0

Bechtel Power Corp.

Data Processing Computer Performed routine operator 8/74 9/75 SanFrancisco, CA.

Operator functions.

en i AL>a nt sume o n, A NI Z A T io tt L%T NAME FMT NME DATE 25Ficys( tvo.

Bechtel Quality Control Mouring Lynn 3/9/82 779807 EDUC ATION 77 7 g 'g'['[g SctboL NAME CIT T STATE MAJOR IION Snake River liigh Schoo l Moreland, Idaho General 4

COLL EG E.

Idaho State liniversity Pocutello. Idahi, General is 1978 OWER Training / Technology Oak Ridge, Tenn NDE b

1979 OTHER JO B MISTORY "M

COMPANY / ADDRESS YOUR TIT L E DUTIE S IEOM TD Filler Metal Control, Sur-Bechtel Power Corp.

veillence of NDE and Subcon-Port Gibson, Miss.

tractor welders. welding in-Grand Gulf Nuclear QC Welding spection of AWS, ANSI and 4/81 2/82 Station Engineer ASME weldinc in field and fab shop, impicment docu-mentation.

Filler Metal Control, Per-Tenn. Valley Auth-form NDE, MT, PT, welding i

ority - Phipps Bend inspection of ASME, ANSI, Engineering AWS items.

Implement field 10/

Nuclear Plant 79 4/81 Surno i nesvil I c. T,enn, Aide documentation.

1 h

i y

I

?

_y l

AL A G 4 E 5 u u f.

O F=.GA r48 2 AT IOtt L A *2T NAME f iRST NAr1E DATE EtiPj oys( N O.

365-Bechtel Quality Control Savois Robert 2/23/82 46-8547 liDUC.ATION ScicoL NAME'

f. lT Y '

STATE MAJOR 77f gg'

)

51 1 hN nicn Loretto Catholic Hinh Sault Ste. Sta r i e.

General N

Lake Superior h!I blechanical C utR State College Sault Ste. hfarie, Engineering 2

1967 OT14ER s

.OTilER JO B ~ M ISTORY M /YR COMPANY / ADDRdNa ivo0R i'IT L E DUTIE S ftoM m

I Run and design mechanical test 12/

Ford blotor Co.

k on auto components,mostly 6/67 67

Dearborn,

51I Testing Eng, endurance testine.

s Repair transmitters (radio)

'psed by combat units in 2/68 9/69 U.

S. Army L-5 Vietnan.

\\

Tr ansmission line environmental reports - transmission line lif.

Consumers Power Co.

engineering - transmision 3/69 81

.lackson, blI

~

Eng. Analysis' line selection, (133KV 4 345KV Iype Trans.

.f Lines)

V

(

1

=

(

l

'l

I to

.(~

uAa nrsuuE OfW AN 4 MT iott LWT NAME M57 NAME DATE.

EMP20Y6t' No.

374-Bechtel Quality Control Swiftney Steven 2/23/82 54-0115 EDUCATION scicot.

NAME.

CIT Y STATE MAJOR

(([, g g

Grand flaven liigh Schoo l Grand llaven,MI College Prep 4

Z- '

~H M COLtEGE.

Muskegon Community Muskecon. MI Pre-Encineerin 7 3 6/72 OTHER Grand Valley State Allendale, MI Business 1

12/81 OTHER JO B HISTORY COMPANY / pORESS VOOR T IT LE DOTlE S FRO M TV Bechtel Power Corp.

1/82 2/82 Midland, MI QC Engineer Inspect Electrical Construction.

Scheduling and field checking of new business construction.

Consumers Power Co.

Electrical Determine the use of equip-9/79 1/82 Muskegon, MI Technician ment and manpower.

Sale of life, health, dis-Equitable of Iowa Insurance ability and pension products.

1/75 9/79 Grand Rapids, MI Agent Trainine new acents.

Drafting and design all phase of civil eng., community plan ning airport master plans, 12/

John Kistler 6 Assoc Designer road and sewer sonstruction, 6/72 75 Grand llaven. MI Draftsman commericial buildine desien.

Pinkerton Detective Agency Store Security -

4/70 6/72 Grand Rapids, MI Security Guard Plant Security A

Vander Meiden Office work, field surveys, commercial office design.

12/

Koteles 5 Assoc.

Architectural 6/68 70 Grand llaven, MI.

Drafting

73 L v

i Steven Swiftney JO B

'4 :sTo R v Mo/vR l

COMPANY / ADDRESS Yo0 R tit L E DUTIE S rem to I

! John Scylhower Restaurant 6/66 5/68fSpringLake,MI Worker Dish washer, cook, manager.

e l

i

?

i

't i

I.

l 1

i

I ea Q

AL A S c<t s uu E o kCrA hi Z A T IO N LAST NAME F aRST NAME:

DATE E/1P/CYsi NO.

Bechtel Quality Control Uchitel Vladimir 12/21/81 967046 EDUCATION 50 COL NAME.

cit Y STATE M A JO R T

$D E

~ MiGR N 10 Odessa USSR 10 t

COLLEGE Electrical Electrical 5fa-BSEE hiachinerv College Odessa. IISSR chinery Design 4

1979 RETS OWER Electronic School E.

Detroit, h!I 2

OTilER JO B H isTORY COMPANY / ADDRESS YOOR TIT L E DOTlE S FroM ru Troubleshooting, repairing 6 electrical control of h!cdsker Electric high power trans formers.

i 7/79 2/80 Fa rmington Ilill s,51T Technician i

Responsible for installation j

and termination of elect-Project and Con-rical items (instruments, struction Company Construction equipment, cables, raceways, 1/77 9/78 Odessa, USSR Engineer and supports).

l Proj ect and Con-Construction Quality Control of cable f

struction Company Quality pulling and terminations.

7/76 8/ 7(i Odessa, USSR Controller i

r I

t e

~

0

,3 AL A G nr s vu 6 i

osonen e non casi reqE m:,7 mme oAra GFioru no.

Bechtel Quality Control Watts Terry 3/10/82 967232 EDUC.ATION VIARS DEG TI E E.

Saloot imME~

clT Y STATE M A JO R 477 gggg

' H IGH Maiden fligh School Maiden, NC General 4

J Civil BS cetttgg NC State University Raleinh, NC Engineerine 4

1975 OTHER OTilER JO B

'H ISTO R Y M /N "

COMPAt4Y / ADDRESS YOUR TIT L E DUTIE S It o ti TO Drafting, minor design work, Martin Marietta helped prepare plans and Aggregate Div, assemble specs. for field Eng. Dept.

Summer eng. and QC personnel, 5/73 8/73 Raleigh, NC Draftsmen various calculations.

Surveying, layout, p roj ect i

Martin Marietta Summer Asst.

elevations, daily diary, Aggregate.Div.

to Project checking formwork f

steel, 4

Eng. Dept.

Field concrete tests, cylinders, 5/74 8/74 Charlotte, NC Engineer quantity calculations.

Daily reports for cost, quantities, concrete yield, J.A. Jones Constr.

paving, labor, monthly pay-Co. Div. Concrete Summer Asst. ty 5/75 8/7f Paving Dept.

~

Project Supt. ~

mentestimates, other office f field work for concrete 4

iti c ko ry, NC paving operation.

l Pield and of fice assignments:

l Ilydrographics' roadway de-NC Dept.of.

sign, structure design, con-

.Fransportation E,ngineer struction, resident engineer, 9/79 5/79 Raleigh, NC in Training rnnintonnnco onginc.cr, div-i I

l ision staff engineer.

I I

Field work for resurfacing NC Dept. of quantity and cost estimates, 12/

Transportation review and processing of 5/79 81 Al bema rl e, NC S t a f f Erdnerr_rarious renorts for h i glucty constr. and maintenance, k

l checking constr. final estimates, reviewing corre-spondence and test reports.

l 4

i

i es ALAS er svu t O k& A NI Z A T IO r4 LAST NAME MST NAME DATE EISPlcre,ti N O.

Bechtel QC Webster Rodney 1/18/82 967387 EDUCATION

~

YEARS DEG R E E.

SC11oo t NAME.

CIT Y STATE M A JO R ATT.

$ CATE HIGH Edward Little Auburn, ME College Prep.

4 BloomficId Hills,

1 0

Eb Oakland Comm. College M1 Business Law Sem.

OTHER 0 tiler JO B W ISTORY M M COMPANY / ApDRESS YOUR TIT L E DOTIE S ftoM TV 4/76 1/82 O'Connor Realty Salesman llandling of Sales, Listings, Marysville, MI Financing and Property Management i

7/74 4/76 Vito Const. Co.

Foreman Supervision of Excavation, Utica, MI Pipelaying and Backfilling l

i 6/73 7/74 Turlillo Const. Co.

Foreman Supervised Drilling of Piles, Richfield, Ohio Pouring of Concrete and i

Grading l-l 4/69 12/71 Greenfield 6 Assoc.

General Responsible for Roof Drilling Livonia, MI Foreman Mining, Trains, Laying of l

Track, Air Lines, Vent Lines, Forms and Concrete for a 1

Water Tunnel 68 69 Cianchette Bros.

Assistant Covering All Phases for j

Portland, ME Superintendent Laying of a Natural Gas Pipeline i

I 67 68 Contracting 6 Foreman Responsible for Right of Way

~

Material Clearing, Excavating Ditch Evanston, Il and Maintained Equipment for Pipeline

.l

1 e.3 AL A a nrsums op c,Am z A T ion LAST NAME DRbT NAt1E DATE EI V l0YLC ff0-Bechtel Quality Control Werner Jeff 2/23/82 697087 l

EDUCATION WARS DEG R E E.

ScHoot.

NAME CIT Y STATE M A JO R ATT.

$ DATE

'HiGM Petersburg liigh Petersburg, IN General 4

s COLLEGE Indiana University Bloominnton. IN Business Admin 1

1976 OTHER Oakland City College Oakland City, IN Welding 1

1978

.OTHER JO B H ISTORY M /"

COMPANY / ApDRESS YOUR TIT L E Dt) TIE 5 IEOM TV Duties included, concrete testing and inspection and Indiana State surveying on bridge con-Ilighway Department struction and interstate 5/74 3/75 Vincennes, IN Ass't. Engineerhighway construction.

Duties included, concrete American Testing testing and inspection, Engineers Corp.

Level I field and lab construction 3/75 9/75 Indianapolis, IN.

Concrete Insp.

of fossil fuel plant.

Duites included, purchasing Pike County High-parts and materials for high-way Dept.

way garage, operated front 5/76 5/77 Petersburg, IN.

Parts blan end loader.

(

h!ize Construction Co Duties included, laborer 5/77 9/77 Vincennes, IN I,aborer railroad construction.

g t

I a

h Wood C.

Smith Chevrolet New Car Duties included, preparing 9/77 5/78 Oakland City, IN Preparation new cars for delivery.

Duties included, operated dip tank machine on air Wirlpool Corp.

Sta ch ine conditioning production line.

5/78 8/7E livansville, IN.

Operator

. i 4 Aa qs s.r.u okvara z o iori t.%7 r,ans ne37 uee 047e eg;pgo ng r,0.

B&W PETERSON, EDWARD 3/11/82 1153 EDUCATION SCIICO L NAME.

c tT Y STATE M A Jo R

?"' ?

ATT.

c C' N e gigg Brooklyn Technical

r. g pr liigh School Brooklyn, NY jfQ$hj COLLEGE New York Maritime Bronx, NY BE (Marine) 4 1969 OTHER Muskegon Community Muskegon, MI OTilER JO B W ISTO RY Mo/vR COMPANY / ADDRESS YOUR T fT L.E DOTIE S FROM TO July Presd it llartford Steam Inspector Inspector of boilers machines and 1981 Inspection &

businesses for Hartford Steam boiler Insurance Co June July Se l f-Employeed 1976 1981 Trucking Business Nov June Story Chemical Asst Plant Maintenance Engineer maintenance l972 1976 Corporation Manager supervisor ass't plant m.inager for Muskegon, MI Story.

June Nov U.S. Navy Engineering Maintenance and supervision of 1969 1972 officer unlicensed personnel of marine power plants boilers and engine.

)/

1nent to 0-4368

,' Page 1 QUARTERLY REPORT April 3982 Thru June 1982 Project Work Schedule 1.

Continue installation of piping, hangers and raceway in the Auxiliary Building.

2.

Continue work on the reactor coolant pumps in both Containment Buildings.

3.

Resume work on the control rod drive rechanisms in both Containment Buildings.

4.

Continue installation of snubbers in both Containment Buildings.

5.

Continue HVAC installation in all facilities.

6.

Mobilize subcontractor and begin penetration sealant work.

7.

Start installation of radiation monitors and associated control panels in the Auxiliary Building.

8.

Subcontractor to resume fireproofing in Diesel Generator Building.

9.

Subcontractor to continue underpinning activities.

10.

Subcontractor to begin insulation of piping and equipment in Containments.

11.

Mobilize subcontractor to begin underpinning of Service / Circulating Water Buildings.

12.

Continue blockwall pours and fixes and installation of new masonry block-walls in the Auxiliary Building.

13.

Receive and start installation of watertight and airtight doors, wire mesh gates and pressure relief panels in the Auxiliary and Containment Buildings.

14.

Mobilize subcontractors for architectural finishes and lab facilities.

15.

Continue work on the Pond Blowdown Structure.

J

?p:achnent to 7-4368 f

page 2 16.

Continue work on relocating the circulating water pumps.

17.

Continue the installation of mechanical and electrical instruments and tubing throughout the plant.

18.

Continue installation of piping, hangers and raceway throughout iurbine: 1 6 2.

19.

Continue installation of piping, hangers and raceway in the Evaporator building.

20.

Continue installation of piping, hangers and raceway in Containments 1,

21.

Continue to pull and terminate wire and cable throughout the plant.

.