MONTHYEARML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML20198E0631998-01-0707 January 1998 Part 21 Rept Re Shipment by Dubose National Energy Svcs,Inc, of 40 Pieces of 4 inch,90 Degree Elbows Which Did Not Meet ASME Section II SA-234 Requirements ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20115D2001996-07-0909 July 1996 Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 ML17292A2141996-05-0808 May 1996 Part 21 Rept Re Capscrews Supplied to Wppss by Now Defunct Cardinal Industrial Products,Lp (CIP) Having Nonconforming Hardness.Failed Lots & Any Remaining Product Found to Have Been Heat Treated by CIP Scrapped & Removed from Premises ML20094M6251995-11-21021 November 1995 Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures ML17291A2571994-07-22022 July 1994 Part 21 Rept Re Westinghouse Containment Penetration Modules Scotchcast Strain Relief & Varglas Insulated Conductors. Replaced Six of 12 RPIS Scotchcast/Varglas Modules & Three Scotchcast/Okonite Modules During Refueling Outage (R-9) ML17291A2351994-07-15015 July 1994 Deficiency Rept Re Material Defects in Facility Containment Penetration Modules.Initially Reported on 940715.Modules Were Replaced ML17290B2001994-05-26026 May 1994 Part 21 Rept Re Automatic Switch Co Replacement Solenoid Pilot Valve Diaphragms Supplied by GE Nuclear Energy.Unusual Combination of Scram Soleniod Pilot Valve Pressure & Exhaust Diaphragm Degradation Caused Failure of Rod to Scram ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20044G5011993-05-26026 May 1993 Part 21 Rept Re Buffer Amplifier Modules Mfg by Bailey Controls Co Containing Suspect Negative Ref Power Supply Having Safety Implications.Caused by Design Error in Circuitry.Modules Would Not Result in Miscalibration ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20126D7211992-12-16016 December 1992 Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML17289A8241992-08-14014 August 1992 Part 21 Rept Re Undersized Yoke Clamps on Three HPCS motor- Operated Valves Supplied by Anchor/Darling Valve Co.Nde Will Be Performed on All Clamps to Determine If Condition Affects Valve Operability.Clamps to Be Replaced by 921031 ML17289A8061992-08-14014 August 1992 Part 21 Rept Re Undersized Yoke Clamps in Three Anchor Darling HPCS motor-operated Valves.Clamps Located on Return Lines to Condensate Storage Tanks & Suppression Pool.Clamps Will Be Replaced by Util by 921031 ML17289A7991992-08-13013 August 1992 Part 21 Rept Re Limitorque Failure to Use Grade 5 Housing Cap to motor-operator Housing,Per Generic Ltr 89-10. Initially Reported on 920730.Seven GL 89-10 Category Valves Could Have Failed Due to Condition ML17289A7721992-08-0606 August 1992 Interim Part 21 Rept Re Discrepancy in Procedure Used by Siemens Nuclear Power Corp to Analyze Feedwater Controller Failure Event w/COTRANSA2 Computer Code.Initially Reported on 920709.Analysis for Cycle 8 Revised & Incorporated ML17289A7851992-07-30030 July 1992 Part 21 Rept 23965:on 920730,determined That Limitorque motor-operators Had Upper Housing Cover Cap Screws Set at 100% of Mfg Rated Thrust Which Could Fail in Svc.Caused by Installation of Grade 1 or 2 Instead of Grade 5 or 7 Screws ML17289A7521992-07-0909 July 1992 Part 21 Rept Re Discrepancy in Procedure Used to Analyze Feedwater Controller Failure Event Using COTRANSA2 Code. Initially Reported by Siemens Nuclear Power Corp on 920617. Caused by Transient Analysis Error ML17289A8591992-07-0808 July 1992 Part 21 Rept Re Delta CPR Transient Analysis Error for Feedwater Controller Failure Event Performed by Siemens Nuclear Power Corp.Feedwater Transient Actually Occurred on 911119.Fuel Cladding Failure Not Possible ML17289A6971992-06-26026 June 1992 Amend 1 to Part 21 Rept 158 Re gear-wear Induced Failures in engine-driven Jacket Water Pump in DSRV-16-4 Standby DG Sys. Initially Reported on 911029.Grand Gulf Station Observed Wear Characteristics in as Little as 500 Operating Hours ML17286B2501991-11-14014 November 1991 Part 21 Rept Re Potential Deficiency W/Asl Dry Type Transformers.Initially Reported on 910610.Recommends Issue Be Pursued W/Abb Since Westinghouse Did Not Have Necessary Technical Info or Expertise to Identify Cause or Solution ML20079B8591991-06-10010 June 1991 Interim Deviation/Noncompliance Rept 067 Re dry-type Insulator Cracking in Transformer Supplied by Westinghouse.Initially Reported on 910513.Util Notified Vendor on 910430 That Problem Affects Class 1E Transformer ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating GO2-89-144, Part 21 Rept Re Defect in Fault Tripping Design for Class 1E safety-related 480 Volt Divs 1 & 2 Ac Power Distribution Sys for Motor Control Ctrs.Caused by Improperly Designed Volt Electrical Distribution Sys.Circuit Breakers Replaced1989-08-21021 August 1989 Part 21 Rept Re Defect in Fault Tripping Design for Class 1E safety-related 480 Volt Divs 1 & 2 Ac Power Distribution Sys for Motor Control Ctrs.Caused by Improperly Designed Volt Electrical Distribution Sys.Circuit Breakers Replaced ML17285A5001989-06-0202 June 1989 Part 21 Rept Re Defect Discovered in Valve Motor Operator of RCIC Inboard Containment Isolation Valve RCIC-V-63.Upper Housing Cover Will Be Machined to Remove Excess Matl to Provide Required Recess ML17285A4771989-05-19019 May 1989 Part 21 Rept Re Defects in Target Rock Actuator Kits (Part 300562-1).Initially Reported on 890516.Defects Noted in Cold Solder Condition,Insufficient Solder Joints & Failed Solder Joints.Defective Kits Returned to Mfg for Repair ML17285A4321989-04-26026 April 1989 Part 21 Rept Re Defect in Limitorque Valve Motor Operator Model SMB-2 W/Soft Worm Shaft Clutch Gear Assembly.Caused by Failure to Install Split Spacer of Worm Shaft Clutch Gear assembly.Safety-related Valves Manually Operated ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20207P0451988-10-0505 October 1988 Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015 ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20207R7031987-03-11011 March 1987 Part 21 Rept Re Potential Defect in Static Exciter Voltage Regulator (Sevr) Reset Design.Recommends Mod to Control Circuits to Energize Sevr Upon Receipt of Emergency Start Signal.Mods Will Be Completed by 870331 ML20211P7211987-02-23023 February 1987 Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly ML20210S3151987-02-0404 February 1987 Revised Final Deficiency Rept Re Unsuccessful Attempt to Synchronize Diesel Generator W/Sys.Initially Reported on 860730.Generator Endturns Cleaned & Greased Before Repairs Made.Permissive Sychronization Relay Scheme Installed ML20207Q6601987-01-21021 January 1987 Final Part 21 & Deficiency Rept Re Misinterpretation of Pipe Movement Data for Itt Grinnell Designed Pipe Supports. Initially Reported on 840208.Pipe Support Detail Sheet Reviewed & Incorrect Drawings Revised ML20207Q6461987-01-21021 January 1987 Forwards Two Lists Revising Commitment Completion Dates for Final Deficiency Repts.Encl 1 Lists Items to Be Completed at Least 6 Months Prior to Fuel Load.Encl 2 Lists Items Scheduled to Undergo Peer Review ML20212A5601986-12-17017 December 1986 Part 21 Rept Re Amplified Response Spectra.Applicable Floor & Wall Mounted safety-related Equipment Reviewed & as-built Geometry & Mass of Seismic Category I Structures Compared to Original Use in Generating Amplified Response Spectra ML20214K5271986-11-17017 November 1986 First Interim Deficiency Rept Re Missing Internal Lockwelds on Anchor Darling swing-check Valves.Initially Reported on 861016.Two Subj Valves Found Thus Far Inspected & Found Acceptable.Final Rept to Be Submitted 1 Yr Before Fuel Load ML20214G0191986-11-10010 November 1986 Revised Final Deficiency Rept Re Target Rock Solenoid Valves on post-accident Sampling Facility Not Meeting Backpressure Requirements.Corrective Action Will Not Be Complete Until 6 Months Before Fuel Load ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing 1999-01-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
_ _ -___-___ __________ _ ___
BW BGW NUCLs?AR TECHNOLOGIES ant l92-276 3 15 O'd I'"*" **d l
December 16, 1992 lyndeurg V 4 60 f5 itinhme 804 385 2000 T,'lecopy 804 385 3663 Document Control Desk U.S. Nuclear Regulatory Commission, Washington, D.C. 20555
Subject:
Potential Safety Issuo Regarding Bailey BQ Differential Pressure Transmitters Gentlemen:
The purpose of this letter is to advice you of a concern regarding Bailey BQ Differential Pressure Transmitters that may have safety implications.
The concern arose as the result of a letter from Bailey controls Company dated October 15, 1992. Bailey advised that they had received a notification from their sub-vendor, Rosemount, to the effect that the actual performance of a Rosemount supplied component differs from Rosemount's original specification. This requires a change in Bailey's published product literature and qualification reports. Bailey characterizes the changes as relatively small. A copy of the Bailey letter is attached.
The change in performance is in the static pressure effect on span. In three of the six types of transmitters corresponding to three differential pressure ranges, the changes result in an improvement in transmitter performance; and, in three, the changes are non-conservative. B&W Nuclear Technologies (BWNT) has learned that the component involved is the sensing element that was procured by Bailey from Rosemount. The revised static pressure effect data is based on new testing information that Rosemount obtained from their calibration and test facility.
BWNT supplied the BQ transmitters to the Bellefonte Units 1 and 2 of TVA, to the WNP-1 unit of Washington Public Power Supply system, and to the Midland units of Consumers Power Company.
Bellefonte and WNP-1 are presently in a deferred status of constructior,. The Midland units were canceled.
TVA has informally advised that they are now in the process of evaluating the use of +%ese transmitters.
BWNT has not performed an evaluation to determine if the subject concern has safety significance and is reportable under 10CFR21.
BWNT is, therefore, notifying TVA, Supply System and Consumers 9212280125 921216 I gDR ADOCK 05000329 l
' I PDR i
=
l I
)
U. S. HRC l JitT/92-276 i
.Docomber 16, 1992 Page 2 i
................................................................. j I
Power of this concern for their uvaluation. DWHT plans no further ovaluation of this matter for reportability unless :
requested and authorized by the utilities. ,
i This informational lottor to the NRC is not a notification under I 10CFH21.
Please contact the undersigned at (804) 385-2817 if you have any questions concerning this matter, or you may contact Mr. David Mars at (804) 385-2852. j Yours very truly, e .m g/
/bJ. II.
d Tay1 ,
b
-Manager, Licensing Services l JitT/bcc j i
Attachment j ca s . B. S. Schoflold, TVA '!
L. C. Oakes, WPPSS a i
R. Bockor, CPCo E. E. Mahoney, Bailey F. C. Sillag, Bailey l r
i w
4
+
t 1
b
i ', '. . _L . s 1
- - 'JU) .2 1992 Bailey Controis Company 29601 Escud A.enue
- WoWo. ONo 440921696 V 3 A
~. n , sis m . 1.... . m ,. n. m m m , '
Balley' 15 October, 1992 B&W Nuclear Service Company P. O. Box 10935 Lynchburgh, VA 24506-0935 Attention: Mr. J. H. Taylor Manager, Licensing Services
Subject:
Notification of Potential Deviation
Dear Mr. Taylor:
Bailey controls company has long been a leader in the supply of control and safety system components for the nuclear industry.
The safety and quality of nuclear qualified products are of paramount concern to Bailey. Our designs and the manufactured or purchased materials of which they are constructed are carefully scrutinized to assure that we maintain quality and performance as we c antinue to support the needs of our nuclear utility customers.
On September 1st, we received notification from a sub-supplier (Rosemount, a division of Emerson Electric) that on June 23rd they became aware that the actual performance of a Rosemount supplied component varied from Rosemount's original specification. This announcement by Rosemount requires a change inThe Bailey's previously revised product published product performance specifications.
performance specification more accurately reflects the measurement s
of the static pressure effect on span for type N_BQ nuclear differential pressure transmitters. These changes are relatively small and, in three of the six ranges offered by Bailey,Bailey's result in an improvement in the overall transmitter performance.
report under 10 CFR 21 is included as an attachment to this letter.
The affsets, if any, of this specification change are very application specific. For this reason, we are unable to precisely determine the importance of this change for each of our customers.
Accordingly, we have classified thisthis change as adess classification potential not require a deviation. As you are awar6, notification to be sent to the NRC. We do urge you, however, to review your system error calculations and take any indicated corrective actions.
l
i
~ l Bailey is notifying its customers of this change in our specifications as a result of our commitment to Bailey's Total Quality Assurance Program. Bailey stands ready to supply any I support that you may need in evaluating the significance of this I change. Please feel free to contact either Frank Sillag (216) 585-5711 or myself (216) 585-7832.
Very truly yours, E. E. ahoney Director, Quality Assurance l
l l
l
BAILBY CONTROLS COMPANY Safety Concern Report SCR-067 Rev. Original 15 October 1992 10CFR21 report issued by:
Mr. Edward E. Mahoney Director of Quality Assurance Phone: (216) 585-7832 Dailey controls Co. Fax: (216) 585-5090 29801 Euclid Ave.
Wickliffe, OH 44092 Items supplied:
Bailey type N_BQ nuclear qualified differential pressure transmitters Items supplied by:
Bailey Controls Co.
29801 Euclid Ave.
Wickliffe, OH 44092 Potential Deviation:
The effect of static pressure on span differs from that previously specified in product literature and qualification reports as follows:
systematic static pressure effect on span Bailey Nomenclature New Span shift Old Span Shift
(% input /1000 psi) (% input /1000 psi) i Range Digit 4
W 1 BQ 7 _ _ _ _
N 2 BQ 7 _ _ _ _
N 3 BQ 7 _ _ _ _
N 1 BQ s _ _ _ _
N 2 BQ s _ _ _ _
N 3 BQ 3 ___
4 3 1.75%. 1.5%
4 0.87% 1.0%
5 0.81% 1.0%
6 1.45% 1.0%
7 1.05% 1.0%
s 0.55% 1.0%
(Correction uncertainty is 10.25% of reading per 1000 psi with-the exception of the: new span ef fect for range 3 - (30" H O range) 2 which.is to.50% of' reading per 1000 psi.)
l E As a result, a control cr safety system having input from'an N_BQ transmitter may not perform within the limits of the safety l analysis-calculations.
l 1
,, - ,r, , J ,, m,,,,.._,.-c - . , , . . , . . _ , - , . - - - . , , - , -f-...x,- '
c This change came to our attention on:
1 September 1992 This change applies to All N_BQ nuclear qualified differential pressure transmitters of the nomenclatures listed above.
corrective action:
i Bailey controls Co. is providing this notice to its customers. l Qualification reports and product literature will be revised as appropriate to include the changed specification.
Our customer is advised as follows:
system error calculations based on inputs from Bailey N_BQ -
differential pressure transmitters should be reviewed to determine the consequences of the reported changes. The safety implications, if any, should be evaluated and appropriate action taken.
I Bailey controls Co. remains committed to serving the needs of our nuclear utility customers as well as our total worldwide customer base. We apologize for any inconvenience this change in product specification may cause you. Bailey stands prepared to provide any support you may require in the evaluation of this spocification change. We trust that you will continue to look to Bailey for your continuing control needs. please direct questions or comments regarding this notification to Ed Mahoney (216) 585-7832 or Frank Sillag (216) 585-5711.