Documents Requested by NRC from Package Presented by G Keeley,Project Manager,But Not Used as Deposition, Exhibits 801023
ML20090K838
Person / Time
Site: Midland
Issue date: 05/02/1984
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-02, CON-BOX-2, FOIA-84-96 NUDOCS 8405240439
Download: ML20090K838 (28)


Text

....

~Qacume h Repsted by

/V/?C fro m Smye fres es red b

eif (1e e l ey,

y n.Ad

/%j ee N, y er, hur noY os eef.

9 s Dep a r}hh E Atb fs 10/ 1 3 / 90 i

84 5 39 840517 RICE 84-96 PDR

f sk 1/4/80 DOCUMENTATION AND MEETINGS RELATIVE TO SOILS 3/13/73 Hunt /Hanson (Regn 33-73)

C-210 Comments i

9/19/74 CAHunt Comment on C-210 Compaction of Plant Area - Hunt 110-74 8/25/77_

Grade Beam Failure - See Also 3CCC (See Below 2794), 3010 Sechtel - UST Memo of 2/1/78 9/ S/77 TCCooke Serial 2538 to Newgen on Article 9 9/23/77 BCCC-2794 Newgen Acknowledgement 2/ 1/78 Newgen to US Testing 8/22/78 Verba'l Discussion With RCCook by WR3 and JLC on Settlement (78-13); Also 8/24 Cook Exit 8/?5/78 Article 9, TCC/JFN - See Also CSC-3797, Loose Sands, Serial 3478 8/31/78' SHH/GSK/RC3/JJZ NRC Meeting in Washington 9/ 7/78 30.33(e) Telecen Report to NRC on Settlement - WR3 and JLC to RCCook 9/8-Exit &

9/10-29/78 RCCook 78-14 9/14/78 GSK (GSK Handwritten Notes)

Meet With Bechtel at Site on Foundation Settlement 9/22/78 MCAR 24, Interim Report No 1, 3LC-6578 9/26/78 PAM - GSK Telecon Question on Removal of Natural Sands 9/23/78 Dr Peck on Soils at Site 9/29/78 Wuokko to CAH/GSK and Wuckko CAE to Review of Settlement GSK 9/29/78 Siple/ Cheek Note Test on Fill 9/29/78 30.35(e) Report ti1CSO-03044100 n.

2 6/3/80 c0/78 RCCook 78-21 10/ 4/78 GSK/DBM/TCC Discuss Earthwork Specifications 80/ 8/78 Dr Hendron Site Visit 10/ 9/78 Afifi to Peck Transmitted Vol IV of FSAR 10/ 9/78 Afifi to Hendron Transmitted Vol IV of FSAR 10/ 9/78 RMW - 11/1/78 - Settlement Status -

AA 10/10/78 TCC/JFN Serial 3487 Dike Borings 10/11/78 GSK Soils Discussion on Site 10/12/78 Field - AA Telecen Dike Borings 10/12/78 Afifi to Peck Transmitted. Settlement Concours for DGB SK-C-620 10/12/78 Afifi to Hendron Transmitted Settlement Concours for DGB SK-C-620 10/17/78 GSK/CAH Visit Site on Foundations 10/18/78 Dunnicliff Site Visit j

10/18/78 Afifi to Peck Meeting in Urbana 10/20/78 Pond Fill and D/S Settlement AA 10/23/78 Hendron to Afifi Comments on Site Visit 10/23/78 JFN/TCC Dike Borings

. 10/24-27/78 Region III Site Inspection 78-12 NRC Notes Dated.11/17/78; also 280 FQA78 (DER) 10/25/78 GSK (Handwritten Notes) BLv 6747 D/G Settlement Meeting at Site 10/26/78 Afifi to Hendron Transmitted Data i

1.

Boring Logs-2.

Consolidation Tests 3.

Updated Settlement Data 10/26/73

-Afifi to Peck Transmitted Data 1.

Soring Logs 2.

Consolidation Tests

=3.

Updated Settlement Data.

011080-0304s100

LEU t t

,t

~ ~ ~

s s s

'?

3

.y i

s

\\

.0/27/78 Draft TCC/J7N Activities Prior to Preload; Also NRC Exit That Date

\\

10/30/78 WR3/RMW/DEH MCAR Discussion on Settlement 3

t

'Bechtel-AA 10/31/78 Draft NRC Enit (GSK) a 10/78 RCCcok 78-22 11/ 1/78 Keppler Memo to Thornburg Asking NRC Staff To Take Over Responsibility 11/ 1/78 PAM/GSK - BLC-6747 Continuation of D/G Work

^

11/ 2/78 Afifi to Hendron Transmitted 10/8/78 Meeting Notes 11/ 2/78 GSK/RMW/DBM/TCC/ DES (See Material Meet V/3echtel on Sectiement Assembled by RMW 11/1/78) 3echtel-AA (GSK Meeting Notes 17 '4/78) 11/ 6/78 or Champaign, IL Meeting Handwritten (CAR Notes) 11/ 7/78 11/ 6/78 Afifi to Peck Transmitted Dunnicliff's Site Visit Recommendations

'1/ 6/78 Afifi to Hendron Transmitted Dunnicliff's Site Visit Recommendations 11/ 6/78 MCAR 24, Interim Report No 2 3LC-6767 11/ 6/78 Afifi to Hendron Transmitted Dr Wood Dutch Cone Data 11/ 7/78 50.55(e) 11/ 7/78 TCC/ DES /RMW/CAH/DEH - CSC-3674 Meet With Dr Peck and Hendron on Bechtel Minutes Sectiement at Urbana, IL 11/10/78 Afifi to Hendron Telecon: Recommendations en Preload Prior to NRC Meeting 11/14/78 NRC Notified Meeting at Site for 12/3 and 12/4/78 11/15/78.

Meeting Vith Consultants at Urbana (3ruce Peck's Notes 11/21/78) 11/14/78 DBM CSM-0050 to PAM Continus Construction of Building 11/16/78 Urbana Meeting CCC-3621 e11080-0304a100 w

4 41/16/78 Chms ead to ASL3 Including Keppler to Thornherg 11/1/78 Memo and CP Co 9/24/78 30.55(e) 11/17/78 Hendron to Afifi Comments and Conclusions to 11/7/78 Meeting Notes 11/17/78 Inspection Report (Gallagher 10/24-27/78 Inspection on Site) 11/18/78 Meeting in Urbana W/Hendron 11/20/78 Cherry Memo to Keppler 11/21/78 G.SK Meet W/RCY, PAT by NRC7 11/27/78 Afifi to Peck

  • Transmitted 9/27/78 Meeting Notes 11/27/78 Afifi to Hendron Transmitted 9/27/78 Meeting Notes 11/28/78 Afifi to Hendron W/ Peck Instrumentation and Cross Sections for DGE. Cage for Vertical Pressure 11/30/78 GSK/RMW Meet W/Bechtel on Preparation for NRC Site Visit on Settlement 2/3-4/78 TCC, CSC-3663 to PAM 3LC-7233 NRC on Site for Settlement-Issue.

DHood/WLayman/DGillen/Bechtel/CP Co i,

Dr Peck

/q. ',..,,,. L.

. i ::. d..,

i'

'y, f, *.,

12/ 4/78 Meeting Notes From Hood to SHH and Mike Miller 12/ 7/78 JLC/DEH Gallagher Telecen Roller Passes 12/ 8/78 Met W/ Consultant (3 Peck CSC-3712 Refers to It) 12/11-13/78 SRC 78-20 Soils AA, Site, Jackson 12/11/78 Ferris to Peck.

NRC Letter Dated 11/17/78 12/13/73 Gray to GZD (Schultz) W/GeoT Minerology of Soil 12/13/78 GIS to QF Qualification of People 12/14/78 Met With Sechtel To Discuss 12/8/78 Meeting With Consultants and Concerns

+

of CP Co - CPC-3663 (3 Peck CSC-3712 Dated 12/20/78) l l

ci1080-030aa100 l

5 4/18/80

.2/21/78 3etween the Lines 12/21/78 50.55(e) That Preload Is Corrective Site Task Group Action To Be Taken 12/27/78 Afifi to Hendron Telecon: Preload Sequence for DG3 12/27/78 Afifi to Hendron Telecon: DGB Preload Defrosting 12/23/78 Ferris to Hendron Transmitted Backfill Spec c-210 and

-211 and SK-C-335 Requirements 12/23/78 Ferris to Peck Transmitted Backfill Spec C-210 and

-211 and SK-C-355 12/28/73 MCAR 24, Interim Report No 3 BLC-6949 12/29/78 GZD to GeoT Personnel Qualifications 12/29/78 Afifi to Peck Transmitted Sketch SK-C-620, SK-C-623 and Settlement vs Time fer Pedestals Plus Copy of NRC Questions 12/29/78 Afifi to Hendron Transmitted Sketch SK-C-620, SK-C-623 and Settlement vs Time for Pedestals Plus Copy of NRC Questions 12/78-1/79 RCCook 78-20 1/ 3/79 Newburry/TCC Newsletter on Soil Compaction 1/ 4/79 AA Meeting Task Group 1/ 4/79 Revision to MCAR 24, Interim Report No 3 - 3LC-6971 1/ 5/79 50.55(e) Report 1/10/79 G2D to Castleberry W/GeoT Transmitting Inspection and Readi=g Procedure 8/12/79 NRC Investigation US Testing Allega-tions 1/15/79 Afifi to Castleberry V/ Peck Next Meeting February 4,1979 1/15/79 Afifi to Peck V/Hendron Transmitting 12/8/78 Meeting Notes c.11080-03044100

6 1/17/79 Afifi to Hendron Transmitted Meeting Notes fer Novembsr 7 and 13, 1978 1/17/79 Afifi to Dunnicliff Transmitted Meeting Notes for November 7, 1978 1/18/79 Afifi to Peck Transmitted Meeting Notes for November 7 and 18, 1978 8/03/79 Site' Task Group 1/30/79 Afifi to Dunnicliff Discussing TSA 1/31/79 Afifi to Hendron Transmitted FSAR Question 362.13 W/ Draft answer 2/1-3/79 Code 79-09; Also 1/2-31/79 2/ 5/79 GZD to Castleberry Supplemental QA Manual 2/ 5/79 GZD to Castleberry TSA 2/ 7/79 GSK/DBM Meet W/JKeppler at Site (GSK Notes) 2/15-16/79 GSK/WRS/CAH/TRT/TCC/RMW Status of Diesel Generator Building Foundation - 3echtel-AA (See GSK Notes) 2/16/79 MCAR 24 Interir Report No 4 BLC-7179 2/20/79 TCC Memo CSC-3852 to CAH Commenting on DRW 12-78 and 13-78 2/21/79 RC3/CAH and GSK Discussion (GSK Notes); Also Hunt 29-79 2/23/79 Met With Region III at Glen Ellyn 2/23/79 50.55(e) 2/23/79 Afifi to Peck Location of Class I Piping and Profiles by G.ZD

'2/24/79 Afifi to Peck Telecon: Effective Saturation.of Compacted Fill 3/ 1/79 Hand Notes - AA Meeting 3/ 5/79 SKH/GSK/TCC/DEH Meet With Region III in Glen Ellyn.

At End of This Meeting, Requested NRC for Technica'l Meeting

(

c11080-0304a100 l

7 6/3/80 3/ 5/79 Draft Cause Memo by TCC 3/ 6/79 NRC Visited Site To Review Preload.

Also Planning Meeting on Site NRC Documented 3/20/79 3/ 8/79 Meeting W/Bechtel P1maning K/T Analysis 3/ 9/79 SHH Memo to Keppler Asked for Reply on Scheduling Technical Meeting 3/12/79 Task Force Meeting Jobsite 3/14/79 Prof N Newmark Urbana 3/ 15/79 NRC Meeting Notes of 2/23/79 and 3/5/79 Meeting in Glen Ellyn 3/19/79 RC3 Eng SU Request Subsidence / Settlement Check 3/20/79 TCC/ DES /GSK Meet With Dr Pack on Settlement at Bechtel-AA, 3LC-8093 3/21/79 GSK Received NRC's 50.34(f) Questions on Settlement 1 Through 22 3/22/79 Kappler to SHH Results of Investigation by Philip, Gallagher and Maxwell 12/11, 18/78 and 1/4, 9, 22/79 3/22/79 Afifi to Peck Transmitted Copy of 10 CFR 50.34(f)

Questica (22 Questions) 3/22/79 Afifi to Hendron Transmitted copy of 10 CFR 50.34(f)

Question (22 Questions) 3/23/79 Reviev 50.54 (AA) 3/23/79 3etween the Lines 3/23/79 Afifi to Peck Transmitted:

1.

Liquefaction Potential Study; 2.

Field Cyclical Stress Ratio; 3.

Earthquake Induced Settlement I

l ci1080-03044100 i

?

S 3/23/79 Afifi to Hendron Transmitted:

1.

Liquefac:Lon Potential Study; 2.

Field Cyclical Stress Ratio; 3.

Earthquake Indeced Settlement 3/27/79 GSK Respense To Letter on Soils Review 50.54(f) Question With 3echtel in AA i

3/28/79 Afifi o Peck Transmitted Dr Woods' Report on Dutch Cone Data 3/23/79 Afifi to Hendron Transmitted Dr Woods' Report on Dutch Cone Data 3/23-29/79 Gallagher Inspection on Site (JLC 79-06 Memo 3/29/79 111FQA79 and NRC Report 4/9/79) 3/29/79 Gould - AA Meeting 4/ 3/79 50.55(e) 4/ 4/79 Underpinning AA Spencer White & Prentices l

4/ 4/79 Afifi to Hendron Update of March 23, 1979 Letter 4/ 9/79 3WM and DEH and Bechtel Meeting at US Testing 4/10/79 Davisson, Loughney, Gould Site Tour 4/12/79 Afifi to Davisson Transmitting: Soring Logs; Location Plan of areas 3eing Considered for Underpinning; Midland FSAR Soils Section 4/17/79 MCAR 24 Coordination 4/19/79 GSK Review Answers to NRC

'4/23-24/79 Site Meetings on Data and Q-List Fill 4/24/79 SHR Respond to NRC's 50.54(f) Settlement Issues 4/24/79 Resumption of Q-List Backfill BCDC 3995 4/24/79 Soil and Rock to Castleberry Field Data April 3 to 10 Pipe Profiles 4/25/79 MCAR 24, Interin Report No 5 3LC-7505 4/26/79 Task Group ti1080-0304a100

I 9

4/26/79 Castleberry to Intrusion Prepack Getuting of Sand 4/27/79 Castleberry to Loughney Transmittal for Underpinning 12 Drawings; 17 Figures; 3ering Logs 4/27/79 Afifi to Hendren Transmitting 17 Figures Showing Response of Instrumentation to Surcharge 4/27/79 Afifi to Peck Transmitting 17 Figures Showing Response o,f Instrumentation to Surcharge 4/27/79 Dunnicliff to Chen Received Soil Samples 3/ 1/79 Afifi to Peck Transmitted Respcases to NRC Questions 5/ 1/79 Afifi to Hendron Transmitted Responses to NRC Questions 3/ 7/79 2 Telecons With Hood Settlement Issua Is 3 road. NRC Staff Too Tied Up With TMI-2 To Meet 5/10/79 RMV Meet With D/G Consultant at 3echtel-AA 5/11/79 GSK NRC Exit Interview at 3echtel-AA 5/11/79 GSK/TCC - 3LC-7830 Meet With 3echtel en Proposed Fixes to Structures 3/16/79 Task Group Site 5/17/79 TCC Memo CSC-4066 to Newgen on Air Also NRC Exit Line Leak in Tank Farm 3/17/79 NRC 79-10 and 170FQA79 Site Inspection by NRC 5/21/79 Afifi to Loughney.

Transmitted C-88 for Review 3/22/79 Afif1 to Davisson W/ Peck; W/Dunn; Transmitted May 10, 1979 Meeting W/Hendron Summary 3/22/79 Davisson - Afifi May 10 Meeting La AA Summary 5/24/79 Afifi to Davisson W/Gould Transmitted Spec C-95 for Review 5/24/79 Afifi to Hendron-V/Davisson CGould Participation with Davisson

- mi1080-03044100

10 4/13/80 3/ 25/79 Afifi to Davisson Transmitted C-94 for Review 3/29/79 Davisson to Afifi Response to May 10, 1979 Meeting Summary 5/30/79 D/G Task Group, BLC-8051 AA 5/31/79 Loughney, Woods, DES AA Dewatering 5/31/79 SEN Rev 1 to 50.3a(!) Sent to NRC C/Os -- --Reviews 15dS'C 6/ 1/79 NRC Notice of Test Pit Visit - 6/7/79 6/ 5/79 RLC/TCC Prospective Bidding 6/ 6/79 Afifi to Hendron Liquefaction Potential of Railroad Bay 6/ 7/79 TCC, CSC-4133 NRC Site Visit To Observe Test Pits (TCC Memo 6/13/79, CSC-4133 and NRC Report Dated 6/21/79) 6/11/79 DES Meet at Bechtel To Discuss Diesel Gen MCAR 6/12/79 Afifi to Hendron Update of Borings, Cross Sections and Other Information 6/12/79 Afifi to Peck Update of 3orings, Cross Sections and Other Information 6/12/79 Afifi to Woods Update of Borings, Cross Sections and Other Information 6/12/79 Afifi to Davisson Update of 3crings, Cross Sections and Other Information 6/12/79 Afifi to Gould Update of Borings, Cross Sections and Other Iaformation 6/12/79 Afifi to Peck Copy of the NRC 10 CTR 50.54(f)

Questions Dated /24/79 and Rev 1 Dated 3/31/79 6/12/79 Afifi to Hendron Copy of the NRC 10 CTR 50.54(f)

Questions Dated 4/24/79 end Rev 1 6/12/79 Afift to Davisson Copy of the NRC 10 CFR 50.54(f)

Questions Dated 4/24/79 and Rev 1 Dated 3/31/79 ci1080-0304a100

i 11 8/19/80 6/ 12/79 Afifi to Gould Copy of the NRC 10 CTR 50.34(f)

Questions Dated 4/24/79 and Rev 1 Dated 3/31/79 6/13/79 Chen to Hendron Telecon - Interim Report No 6 to MCAR 24 - Questions on Liquefaction of Control Tower 6/ 15/79 MCAR. Interim Report No 6 BLC-7749 6/15/79 SHH/GSK/JJ2/RTG Meet With NRC on Licensing Schedule in Washington, DC 6/18-19/79 DES Meet With Consultants at 3echtel-AA (TCC Memo CSC-4297 Dated 8/8/79) 6/20/79 CP Co Motion'for Separate Hearings on Environmental and Soils 6/22/79 GSI/3WM/WR3/DEH, CSC-4297 Meet at 3echtel To Discuss Upcoming e-NRC Meeting

, ' i ,*

l rh A l ', ~ ~ :

i'i. f. ;,':, l'

,-.i

,~

4, -

~.-

6/25/79 30.35(e)

?; e e..

~:..,,..

6/25/79 DES - D/G Task Group AA BLC-7944 6/27-23/79 Meeting With Consultants in Denver 6/29/79 SHH to Keppler CP Co Response to Noncompliance on Prestressing - Soils Also Inspected en 5/14-17/79 6/29/79 Afift to Peck Interim Report No 6 to MCAR 24 6/29/79 Afifi to Davisson Interim Report No 6 to MCAR 24 6/29/79 Afifi to Hendron Interim Report No 6 to MCAR 24 1

l c11080-0304a100

s 12 4/18/80 6/29/79 Afifi to Loughney Interim Reporn No 6 to MCAR 24 6/29/79 Afifi to Gould Interim Report No 6 to MCAR 24 6/29/79 Afifi to Peck Report by DGray Dated 5/7/79 6/29/79 Afifi to Hendron Report by DGray Dated 5/7/79 6/29/79 Afifi to Dunnicliff Peck's Suggestion on Temperature Cor-rection for DG3 Instrumentation 7/ 2/79 Gould, Davisson, Loughney, Peck to Transmitting Denver Meeting Notes Afifi Signed by the Senders 7/ 3/79 TCC Telecon With Lipinski 7/ 3/79 GSK/PAM, 3LC-7827 Arrangements for 7/18/79 Meeting (Washington) 7/ 3/79 Newgen/Cooke Resumption of Q-List Till 7/ 3/79 afifi to Ferris W/Hendron Settlement During Earthquake 7/ 6/79 Telecon SHE to Boyd Concern on Need for Continuing Activity on Settlement 7/ 7/79 Afifi to Loughney Meeting Notice 7/ 7/79 Afifi to Gould Meeting Notice 7/ 7/79 Afifi to Peck Meeting Notica 7/ 9/79 SHH Send in Rev 2 to 10 CTR 50.34(f) to NRC 7/10/79 Denton Reply to SEE TVX Says They Will Continue Reviews of Soils 7/10/79 NRC Staff Reply to CP Co 6/20/79 Motion 7/10/79 DNR - Hittle Dcaining Pond to D/G 7/10/79 TRT/DEH/GSK/TCO Pre-7/18 Meeting 7/17/79 Review Monitoring V/Loughney AA 7/17-13/79 GSK/TCC/TRT Presseting With Consultants in Washingten, DC.

Meet With NRC on Settlement in Washingten, DC 50.55(e)

Dated 3/10/79 Documented Meeting 7/18/79 Hood Issued Meeting Notes of 7/18/79 Meeting on 10/16/79 011080-0304a100

13 4/18/80 7/18/79 Meeting Submittal 7/18/79 Afifi to Gould Transmitting Rev 2 of 50.34(f)

Questions 7/18/79 Afifi to Davisson Transmitting Rev 2 of 50.54(f)

Questions 7/18/79 Afifi to Hendron Transmitting Rev 2 of !O.54(f)

Questions 7/18/79 Afif: to Peck Transmitting Rev 2 of 30.34(f)

Questions 7/18/79 Afifi to Loughney Transmitting Rev 2 of 50.34(f)

Questions 7/23/79 Gould to afifi Summary of Presentation Made to the NRC 7/18-19/79 7/23/79 Peck to Afifi Summary of Presencation Made to the NRC 7/18-19/79 7/25/79 Afifi to Davisson Transmitted Meeting Notes of 6/18-19/79 7/ 25 / 79 Afifi to Loughney Transmitted Meeting Notas of 6/18-19/79 7/25/79 Afifi to Dunnicliff Transmitted Meeting Notes of 6/13-19/79 7/25/79 Afifi to Peck Transmitted Meeting Notes of 6/18-19/79 7/25/79 Afifi to Hendron Transmitted Meeting Notes of 6/18-19/79 7/ 25 / 79 Afifi to Gould Transmitted Meeting Notes of 6/18-19/79 7/25/79 Loughney to Afifi.

Summary of Presentation Made to the NRC 7/18-19/79 7/26/79 Meeting With SEE and 3echtel on Lessons Learned j

7/31/79 Telecon With Hood Discussion on Documenting 7/13/79 Meeting. Hood Stated That Staff Said Positive Aspects of Meeting Vere Pro-posed Design Fixes S/ 1/79 Task Force, 3LC-8092 ci1080-0304a100

14 4/13/80 1

d/ 2/79 Chen to Peck Data for Settlement Evaluation of DGB 8/ 2/79 Chen to Hendron Data for Settlar.ent Evaluation of DC3 8/ 3/79 Telecen With Miller Update on 7/18/79 Soils Meeting and Bechtel Mgme Meetings 8/ 6/79 Fobes to JSS/RL3 Dewatering Info Request 8/10/79 30.33(e)

Meeting Notes of 7/18/79 Meeting With NRC Staff 8/10/79 A..fi to Woods DGB Settlement Dutch Cone Data Pipe Profiles 8/10/79

.Afifi to Peck DGB S.ettlement Dutch Cone Data Pipe Profiles 8/10/79 Afifi to Hendron DGB Settlement Dutch Cone Data Pipe Profiles S/10/79 Afifi to Davisson DGB Settlemese Dutch Cone Data Pipe Profilcs e/10/79 Afifi to Gould DGB Settlement Dutch Cone Data Pipe Profiles 3/10/79 Woods to Afifi Pile Stiffness Report on Service Water Structure 3/13/79 Afifi to Castleberry W/ Peck, Telecon: Reference W/ Peck and W/Hendron Hendron on Removing the Surcharge 8/14/79 Newgen/Castleberry TWX Release To Remove Surcharge 8/15/79 PAM to GSK. 3LC-6021 Justification for Removing Preload 8/16/79 Chen to Hendron and Dunnicliff Telecon: Set:lement Montioring i

During Surcharge Removal

{

8/24/79 Dewatering (AA) 8/24/79 MCAR 24, Interia Report No 7 3LC-8073 S/28/79 Afifi to Loughney Interim Report No 7 1

011080-0304 100 t

15 6/3/80 8/28/79 Afifi to Peck Interic Report No 7 8/23/79 Afifi to Hendron Interim Report No 7 8/28/79 Afifi to Davisson Interim Report No 7 8/23/79 Afifi to Gould Interim Report No 7 8/29/79 Rubenstein/Howell Question 1 Meeting 8/31/79 JJ2/WR3 Held Preplanning Meeting for NRC QA Settlement Meeting at 3echtel-AA 9/ 4/79 Revision to MCAR 24 Interim Report 3LC-8088 No 7 9/ 3/79 Darl Hood Meeting Notes Meet With SRC on QA Settlement (Q-23) 9/ 3/79 50.53(e) 9/ 6/79 Dewatering CSC-4376 9/ 7/79 Dewatering (AA) 9/10/79 Afifi to Loughney Interim Report No 7 9/10/79 Afifi to Peck Interim Report No 7 9/10/79 Afifi to Hendron Interim Report No 7 9/10/79 Afifi to Davisson Interim Report No 7 9/10/79 Afifi to Gould Interim Report No 7 9/11/79 SHH NRC Sent Letter on QA Settlement Issue (Quattien 23) 9/11/79 Testing and Monitoring AA 9/12/79 GSK/BWM/WRB/JJZ Meet on-QA Settlement in Jackson 9/ 13/79 SHE Rev 3 to 50.34(f)

'9/13/79 RMW/Dunnicliff CSC-4405 Task Group AA 9/17/79 Chen to Hondron Telecon: Monitoring of Only Selected js.,

Borres Anchors

,8

  • s,

i;.,

l 9/18/79 Afifi to Curtis W/Voods In Siru Shear Wave hars'urements and...

l Additional Borings i

c11080-03044100 i

16 4/18/80 9/18-19/79 Case Load Forecast Panel Site Visit.

Serial 7759. Agenda Ites 6.

Dis-cussed Work Schedules and Completion of Investigation and Saw No Schedule Effects 9/27/79 SHH/GSK/JJZ/TJS - Serial 7921 NRC Management Meeting in Washington, DC.

Rubenstein Stated He Had Trouble i

Getting Tech Staff To Review Soils 10/ 1/79 3echtel Tank Farm Investigatics Report 10/ 1/79 UST-3echtel Response to Bechtel Review 10/ 9/79 GSK/3WM/WRB/JJZ Meet on 50.54(f) (Question 23) in Jackson 10/ 9/79 TCC/ DES /DEH/TRT D/G Task Group 1A 10/11/79 GSK Meet VAth TET To Prepare for Sechtel Dewatering Meeting (Jackson) 10/12/79 GSK Meet at Bechtel-AA All Day?

10/15/79 Gray to Schultz Dispersive Soil Test Data

'0/15/79 Schultz to Afifi Dispersive Soil Test Data 13/16/79 JJZ NRC Notification That Corps of Engineers is Helping on Geotechnical Reviews So Asked That 50.55(e) and 50.54(f) Se Sent To Tham J

10/ 16/79 D'aod - 7/18/79 Minutes 10/16/79 TCC to Curtis CSC-4504 Comments on Dewatering RG 10/19/79 Dunnicliff to Afifi DG3 Settlement 10/22/79 SKH l

Transmittal of Draft RF on Dewatering Systems 10/25/79 SHH/3WM/GSK Meet With NRC Region III in Chicago 10/23/79 TCC/ DES Meeting With Consultants Gould &

Hendron at 3echtel-AA 10/25/79 Mtg Notes Plant Area Fill 10/Z9/79 MCAR 24, Interim No 8 3LC-8370 i

ci1080-03044100

i 17 8/19/80

.0/30/79 TCC/ DES Dewatering Meeting With Consultants BLC-8474, 11/19/79 Bechtel-AA Curtis - TCC 10/31/79 Afifi to Loughney Interim Report No 8 i

10/31/79 Afifi to Peck Interim Report No 8 10/31/79 Afifi to Hendron Interim Report No 8 10/31/79 Afifi to Gould Interim Report No 8 11/ 1/79 TCC - Curtis Pond Dewatering Requirements 11/ 2/79 SHH to NRC Interim Report No 8 11/ 9/79 Curtis to DBM, BLC-8441 Need for Fond Dewatering 11/ 9/79 JAR to GSK Suggested 30.54(f) Question 23 In-clude Commitment To Review Previous 50.55(e) Reports 11/12/79 Afifi to Hendron Review of TG Cale 11/12/79 Afifi ta Peck Review of CG Calc

'.1/13/79 SHH Submitted Rev 4 to 10 CFR 5.54(f)

Relative to QA (Question 23) 11/14/79 TCC DHood W/ Corps of Engineers Visit Site

/

i..

(NRC Meetin

2.;,. g Notes Dared 12/6/79)

,.t,,.

  • i-I~

I'

1.. L,, J. b/. (

i g, c, 3

11/15/79 CP Testing Telecon hechtel-AA Setti' ment / Vibration Question e

11/15/79 WRB

.Dreisbach QC Commitments on 30.54(f) Questions 11/16/79 Bechtel/ Consultants Vibration Meeting, Bechtel-AA 1

11/19/79 Supplemental 50.34(f) Questicas

'.7.L....,

'.t. - i T Sent to SHH 11/19/79 Listing of Cosmo W/ Consultants 11/20/79 TCC Dewatering Task Force Meeting at Bechtel 11/21/79 Curtis - Cooke Pond Dewatering Technical Aspects 11/21/79 Cooke - Febes Pond Dewatering Reasons / Method i

4 c11080-0304a100

~ _ - _.

18 4/18/80

.1/27/79 Afifi to Peck Transmit October 25, 1979 Notes 11/27/79 Afifi to Gould Transmit October 25,1979 Notes 11/27/79 Afifi to Hendron Transmit October 25, 1979 Notes 11/27/79 GZD to Castleberry Transmit Test Pit and Place Load Test 11/29/79 Afifi to Hendron Transmit October 30, 1979 Notes on Dewatering 11/29/79 Afifi to Gould Transmit October 30, 1979 Notes on Dewatering 11/29/79 Afifi to Loughney Transmit October 30, 1979 Notes on Dewatering 11/29/79 TCC/Starr Eby MDN Telecon Other Building Settlement 11/30/79 Afifi to Woods Transmit Additional Information on DG Pedestal Vibration 12/30/79 Afifi to Peck Transmit Supplemental 30.54 Questions 11/30/79 Afifi to Hendron Transmit Supplemantal 50.54 Questions

'1/30/79 RLT Memo to 3echtel PE Data for New Settlement Problems 11/30/79 Flore111 to SKE IR 50-329/79-20, 50-330 Cons Methods /

Spec Rev (Inadvertent) 11/30/79 J3 Post - TCC Mergentime Bid Question 12/1-28/79 RCCcok 78-13 12/ 3/79 GSK Meet With Bechtel at Site on 50.54(f)

Questions 24-35 12/ 3/79 Curtis to Davis Memo Dewatering Work Responsibilities 12/ 3/79 Fobes - To Distribution Response to TCC 11/21 Memo on Draining Pond f

12/ 4/79 GSK to JAR Serial 8021 Answer to JAR Memo to GSK on QA Com-mitments 12/ 4/79 Febes - Lansing Draining Pond 12/ 4/79 Febes - TCC Permission to Drain 12/ 5/79 Pend Dewatering Meeting Final Preparations for 2ewatering ci1080-03044100

19 6/3/80

.2/ 5/79 New 50.34(f) Questions Planning Session 12/ 5/79 Meeting at Site To Discuss Additional 50.54(f) Soils Questions - TCC Memo 12/11/79, CSC-4660 12/ 6/79 Underpinning Meeting in AA Preaward 12/ 6/79 NRC Issues Order Modifying Construction Permit 12/ 6/79 Telecon Between CP Co and Hood on Order 12/ 6/79 Dreisbach NRC Response to JLCorley Dewatering Fine Sampling

~

12/ 7/79 TCC Memo to Fobes Miscellaneous Dewatering Info 12/11/79 Telecon With Hood Interpretation of Order Between 30.54(f) and Order 12/12/79 NRC Order of December 6,1979 Investigate Work Activities Which May Not Proceed Under Order 12/13/79 Telecon With Hood on Follow-Up of 12/11/79 Telecon 12/18/79 Telecon With Hood on Not Getting Questions 4 and 14 on 50.54(f) in Until Mid-January and That Some of 11/19/79 50.54(f) Questions Are Pertinent :o Amendment 12/18/79 CP Co/NRC Telecon on Future Meeting 12/18/79 Dewatering Meeting In Ann Arbor 12/19/79 Amendment 72 Referencing 50.55(e) and 50.54(f) Material 12/19/79 Telecon Cooke/Weidner - Planning PR Release on Order

' '12/19/79 SHH Memo Submitting Amendment s*.

4:

~~~

h*

. ~.

. v.

-12/20/79' MOR to RC3 (BLC-8163)

Vibratory Settlement of the D/G

,.b Pedestals

-s 1

1 a11080-030&a100

e 20 4/18/80

.2/20/79 Sechtel/ Consultants (3LC-8615)

Vibration Meeting, Bechtel-AA Meeting Notes No 1085 12/20/79 GZD to Afifi Transmit Settlement Marker Cale 12/26/79 SHH to RBD/GSK/3WM/DBM NRC Region III - CP Co Mgme Meeting -

1/11/80 12/26/79 Miller to EGCase and VStello Request for Hearing 12/26/79 JAR to GSK (BLC-8622)

Modification of Midland Construction Permit - Schedule Analysis on Impact of Order 12/26/79 QAR - Question 23, Item i 12/26/79 Fobes/Cocke Memo on Fond Dewatering 12/28/79 BLC-8630, LHC to RC3 Responses to 10 CTR 50.54(f)

Questions on Plant Fill 1/80 NRC Letter to Nila Najewicz Response to Her Letter of January 19, 1980 Regarding Soils Settlement 1/ 2/80 NRC Meeting Notice 1/ 3/80 QA Telecon on Number of Infracticas i

1/ 4/80 GeoT/Hendron Dewatering Meg 1/ 4/80 Memo to File From 3HP/RMW 12/18/79 Meg ta Ann Arbor - Per=anent Dewatering i

1/ 7/80 3 echs el/ Lou ghney/ Hendron/ McClure /

Dewatering Meeting Fer:11 t/ 8/80 CP Co/Bechtel Meeting - Ann Arbor Dewatering and Questions No 4 and No 14 1/ 8/80 Woods to Afifi Transmit Cross-Hole Test Report 1/ 9/80 Voods to Afifi Evaluation of DG Pedestal Vibratory Settlement 1/ 9/80 Bechtel/Mergentime Suspend 31d 1

1/10/40 Dreisbach/Corley Fines Monitoring i

1/14/80 CP Co/Bechtel-AA Preparation for NRC Meg - 1/16/30 l

j' c11080-03044100 i

.r..

l

21 4/18/80 1/14/80 3LC-8692 - JAR to GSK 30.54(f) Question 23 Actions -

December Status Report 1/16/80 CP Co/Bechtel NRC Meeting in Bethesda on 50.54(f)

Questions and Update on Soils Correc-tive Action Technical Items 1/17/80 Telecon With Hood, JJZ, GSK On Soils 1/17/80 Memo From MIMiller to GSK and SKH On NRC Soils Reporting Requirements 1/17/80 Telecon Between DHood and JJZabritski Soils Issue 1/23/30 Cooke/Rothwell Telecen 50.54(f) Questions 1/23/80 Feb s/ District Engineer Dewatering Discharge to Pond 1/25/80 TCC Memo to MRothwell, CSC-4763 Answers to 50.54(f) Questions Based on NRC Meeting of 1/16/80 1/25/80 Horn /Galla. 3r Lean Concrete Backfill 2/ 4/80 Telecon Record, JJZ and DHood Future Meeting on Soils Settlement Issue 2/ 4/80 FRC to CP Co (SHH) 1/16/80 Mtg on Supplemen'tal Requests Regarding Plant Till 2/ 6/80 QA Dept Oral Communications Record -

50.54(e) Letter Trsasferring D/G WRB, JJZ, L!Richards With Dick Krop, Foundations and Bldg Settlement NRC Problem to Licensing 2/ 7/30 SHH to Keppler, Howe 23-80 Closing Out 50.55(e) 2/ 7/80 Probably No Minutes 50.54(f) Questians Response Review Meeting - AA 2/ 8/30 Dunnicliff to Afifi Review of D/G Bids Settlement 2/ 8/80 Telecon Record, JJZ and DHood Soils Mtg on Site for Consultants 2/11/80 SKH to DVassallo, Hows 39-80 Reference Material for Amendment 72 Serial 8333 2/11/80' NRC, RMDiggs to SKHowell Additional Fee for Licensing on Soils 2/12/80 Afifi to Gould Transmit Updated Spec C-95 and C-88 for Review 2/12/80 Probably.No Minutes 50.54(f) Questions Response Review Meeting - AA ti1080-0304a100 l

)

3 22 4/18/80 1

2/13/80 Telecon Record, DHood and JNewak NRC Mtg on Soils at the Midland Site 2/14/80 BLC-8827, JAR to GSK

$0.54(f) January Status Repert 2/14/80 NRC Letter to SHH Termination of 50.54(f) Context for Further Responses on Midland Soils Settlement 2/14/80 NRC - LSnubenstein From DHood Notice of Initial Site Visit for NRC Consultants To Observe Midland Soils Sectiement and Iffects 2/14/80 Woods to Afift Correctior. for Cross-Hole Teac Report (1/8/80) 2/14/S0 Draft Agenda Feb 27-28 M g W/NRC -

2/15/80 3LC-8833 - MOR to RC3 Meeting Notes No 1115 of January 8 and 14, 1980 Meetings in AA -

10 CFR 50.54(f) Questions on Plant Fill 2/15/80 BLC-8833 Minutes for 1/8 and 1/14 Mtg 2/21/80 SHH (Howe 44-80) to NRC, RMDiggs Rebutting 2/11/80 Memo Requesting Additional Fee on Licensing 2/21/80 Curtis to Gould Request To Attend Feb 28, 1979 Mtg 2/22/S0 Woods to Afifi Recommending Shear Wave Profile in OF Bldg and Tank Farm 2/22/80 Woods to Afifi Revise Report 2/2f/80 Memo From NRC, GFiorelli to SHH Acknowledging 2/7/80 30.55(e) Report as Final' Report 2/26/80 NRC, LSR to SHH Request That Naval Surface Weapons Center Receive Soils Info 4

2/27/SO afifi to Hendron Transmit Dr Woods' Cross-Hole Test Report 2/27-23/80 Mtg With NRC and Consultants at Site 2/27/80 Afifi to Peck Transmit Dr Wood's Cross-Hole Test Report 2/25/80 SHH to DVassallo, Serial 8454 Transmittal of Amendment 74 to PSAR (Howe 50-80)

Answer to 50.54(f) Questions 24-37, Rev 5 ci1080-03044100

23 8/19/30 1

2/29/80 Memo From NRC, LSR to SFR Use of Energy Tech Engs Center for Mach Engs Review for Soils and Operating License 2/29/80 Amendment 74 Submittal Update and Questions 24-35 3/ 3/80 NRC Memo Gallagher Inspection 2/12 and 2/14 3/10/80 SLC-8955, JAR to GSK 30.54(f) Soils Status Report 3/10/80 2abritski/Curtis Added FSAR and Fill Serial 8/-86 Distribution 3/13/80 TCC to File 0435.16 Mtg W/NRC on Fill Status and Rssolution - 2/27-23/80 3/14/80 Board Notice of Hearing Notice of Hearing Held Safore ASL3 3/17/80 Afifi to Dunnicliff Meeting Notes 2/20/80 3/18/80 Soils Documents to Misc Parties Serial 8509 3/20/80 BLC-9021, LHC to RC3 (Doc Rev -

.0 CFR 50.54(f): Core Drilling for 3/25/80 Crack Depth Investigation 3/25/80 Afifi to Davisson Transmitting C-94 Spec for Comment on Test Pile 3/27/80 GSK to JAR, Serial 8548 50.54(f) Monthly Status Reports -

Soils 3/31/80 DSH, NRC to SHH Summary of 2/27-23/80 Mtg and Site Tour With Consultants To Review Soil Settlement 4/ 1/80 SHh to DVassallo, NRC, Serial 8570 Amendment No 76 (Howe 72-80) 4/ 1/80 BLC-9069, LHC to RC3 Mtg Notes 1131, 10 CFR 50.54(f)

Requests Meg January 16, 1980 4/ 1/80 LSR, NRC, to SHH Req 'or Reports, Dwg and Other Info Regarding Plant Till Sectiement and Effecta 4/ 2/80 Mtg V/II43, DE.!, GSK and TCC 4/15/80 Telecon, DHood, NRC and GEClyde Re: LSR Ler to SHH Dated 4/1/80,

" Request for Reports, CVG, & Other Info Regarding Plant Fill Settlement

& Iffects" 311080-03044100

1 24 8/19/80 L/16/80 IL&B Reply to 3oard Notice of Hearing 4/ 17/80 3LC-9140, LHC to RC3 Vibratory Settlement of the Diesel Generator Pedestals 4/30/80 NRC Staff Motion for Issuance of Amended Notice of Hearing 4

5/ 5/80 JWC to Vassallo

&mendment 77 on t. Adicional Documenta-4 tion and Updated List of TSAR Sections No Longer Applicable i

5/ 7/80 JWC/SHH e, JGKeppler, NRC EE Sulletin No 79-02 1

(Howe 84-80; Serial 8803) 5/12-13/30 Oral Coma Record, WR3 51-80 D/G Settlement Program 30.54(f) Oca-mitments en Equipment Qualif. cation i

j 5/16/80 Serial CSC-5043, TCC to LHC Cpen Items - Soils i

5/21/80 BLC-9259, JAR to JWC Soils Settlement Schedules a

3/21/80 CP Co Answer to NRC Staff Motion Issuance of Amended Notice of Hearing 5/22/80 BLC-9305, JAR to JWC Responses to NRC Questions on Plant fill 3/27/80 IL&B to CP Co attaching Motion to Motion to Partial Consolidation of ASL3 Soils and Operating License Hearing J

1 3/23/80 JL3 to CP Co (J37/SHH/L3L/JWC/RTG/

Regulation - Federal - NRC GSK/MGK)

-Constr Permit Medification

-Correspondence 5/30/80 NRC, ASchwencer to SHH Display Ad Re: Het:ing on Order for l

2 Mod of Constr Jermi:

6/ 5/50 Note to File: RMW-CSC-5084 Mtg With Oechtel on Action Items for Soils Ir.aues 6/16/80 JAR to JWC 50.54(f) May Status Report 6/16/80 ASL3 From NRC Staff NRC Staf'f Response to CP Co Motion for Partial Consolidation and Staff Motion to Postpone Further Response 6/1o/80 Carol Gilbert to NRC Petition To Intervene 6/23/80 William A Thibodeau to NRC Petition To Intervene l

i l

ci1080-0304a100

25 S/19/80 1

6/24/80 George Wilson to NRC Petition To Intervene 6/23/80 Patrick Race to NRC Petition To Intervene 6/25/80 Michael Race to NRC Petition To Intervene 6/25/80 Terry Miller to NRC Petition To Intervene 6/26/80 Sandra Reist to NRC Petition To Intervene 6/26/80 Sharron Warren to NRC Petition To Intervene 6/27/80 Ivan Smith, Chairman, ASL3 ASL3 Memo and Order Granting NRC Staff's Request to Postpone Responses on Motion to Consolidate Issues 6/27/90 Sarbara Stamiris to NRC Petition To Intervene 10/13/80 Memo Trom Schwencer to JWC On Requests for Additional Informa-tion Regarding Plant Fill 7/ 1/30 Answer to CP Co to Petition To Leave To Intervene of Thibodeau, Miller, Race, Stamiris and Gilbert 7/ 7/80 NRC Staff to ASLB Staff Answer to Petition for Leave To Incarvene Signed by Carol Gilber:

7/ 8/80 From ILLB to ASL3 Answers of CP Co to Petitions To Intervene of Race, Vilson, Reist and Warren 7/14/80 Telecon Record -

Request by Corps of Engineers for GSK/TJS/TRT/JZ3 to DHood Additional Information Regarding Plant Fill 7/14/80 NRC Staff Order To Petition for Leave To Intervene e i

- [,,

-7,/, ' /.

Filed by Wendell H Marshall

-e, t-p,c e,(

p*

t-

. t t

4

.6 s --

,,,, n %,,.

7/24/80 Memo to LCurtis Froe'TCooke Expediting Soils Placement 7/24/80 NRC - Memo and Order Ruling Upon Standing To Intervene

'7/24/80 NRC - Order Ruling on Mapleton Intervenors 6/30/80 Petitica to the Board ci1080-02044100 l

o 26 10/13/80 7/24/80 NRC - Order and Notice Prehearing Ccnference 7/24/80 Memo and Order Ruling Upon Standing To Intervene 7/24/80 Order and Notice Prehearing Conference 7/25/80 Telecon Record - DHood/GSK/DMB Discussion on Forthcoming NRC Corps of Engineers Meg on Soils 7/30/80 Vendell Marshall Memo ed ASL3 Answering CP Co Motion for Consolida-tion and Includes Move for Stop of

/,, *

.4

!..,5,

_L Construction

' ;" ' i

~i.' T k'

i t?

8/12/80

'TRI to File

' ' ' ~ '

Meg With NRC ' Staff and Corps of

Engineers on Soils

. /la/80 Correspondence From JE3runcer Construction Permit Modification 8

8/15/80 To DVassalla From SKHowell Amendment No 80 un Update of Commic-ments on QA Answers to 23 and Test Report on Compaction Equipment Quali-fication 8/15/80 &

Supplement to Petition To Intervene 8/25/90 by Barbara Stamiris 8/18/80 JL3 to JWC/JE3/GFH/LHH/GSK Contracts - Bechtel - Subcontracts:

US Testing Company 8/20/80 Wheeler Notes on Mtg Vith Bechtel on Answering Corps of Engineers i

Questions on Additional Sorings 8/27/80 fedesco to JWC Request for Additional Info Regarding Dewatering (Questions 49-53) 8/07/80 Wendell Marshall to ASL3 on NEFA Not Evaluating Class 9 Accidents

...... i.,-

~

9/ 9/80 Suppl'ementt2Varren 4t'ition' kd '

Intervene

.d Amended Supplement to Stamiris Petition To Intervene C18080-0304a100 D

o 27 10/13/80 9/12/80 JWC to Eisenhut Amendment 81 1.

Discussion of Applicant's Posi-I tion on Need for Additional Borings 2.

Settlement Update l

3.

Answer to Questions 36 and 38 and Borfags for Figure 33-3 9/16/80 JWC to Vollmer on General Discussion on Applicant's Position on Need for Additional Borings and Including Itas 1 From Amendment 31 No Date Statement of CP Co With Respect to Supplement to Warran Petition and l

Amended Stamiris Supplement 9/19/80 Notice of Replacasant of Ivan Smith by Charles Bechhoofer 9/2&/80 Paton to ASL3 QA Applies to Soils Issue

-?

10/ 2/30 Don Horn From Gallagher on Verifica-l tion of Question 23 (30.34(f))

j t;,:

  • 5 2....... v..,

1 ^ '

5 h ' : ' i ' ' ' ' ' ' -

I.-

C11080-0304a100 w

,