Submits Limited Generic Evaluation of Des to Assist in Fes Preparation.Statement Does Not Contain Detailed Descriptions of Radwaste Treatment Sys.Final EIS Should Be Withheld Pending SER Issuance
ML20041F887
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/12/1982
From: Hajinian C
ENVIRONMENTAL PROTECTION AGENCY
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8203170512
Download: ML20041F887 (4)


Text

- ..

,ao a%,,.

! O i 8

! UNITED STATES ENVIRONMENTAL PROTECTION AGE A

%s REGION Vil p  %

324 EAST ELEVENTH STREET K ANSAS CITY, MISSOURI - 64106 RECEJVED 9 y

March 12, 1982 - -

- Ag 161982w -

Mr. B. J. Youngblood Q

  • R une Chief, Licensing Branch No. 1 g //

U.S. Nuclear Regulatory Commission _ 4 Washington, D.C. 20555 Wolf Creek Generating Station, Unit No.1, Coffey County, Kansas

Dear Mr. Youngblood:

We have reviewed the Draft Environmental Statement for the proposed operation of the planned nuclear power plant identified above. The project and draft statement have been rated ER-2 (environmental reservations - insufficient information),

respectively. Our primary environmental reservation with the proposed operation is a lack of detailed descriptions of the gaseous and liquid waste treatment systems. The failure to provide the often referenced Safety Evalution Report with the Draft Environmental Statement prevented a thorough evaluation of the planned facility.

The following commeats are provided for your consideration when preparing the Final Environmental Statement:

Generic Comments In our past reviews of Draft Environmental Impact Statements (EIS) relating to light-water nuclear power facilities, we have included generic comments which are applicable to all such facilities. As a result of the Three Mile Island accident, we have decided that we must revise our generic comments to consider these events and activities. We will provide our revised generic comments to the Nuclear Regulatory Commission (NRC) as soon as they are completed. Generic issues undergoing review are:

o Population dose commitments o Reactor accidents o Fuel cycle and long-term dose assessments o High-level radioactive waste management o Transportation impacts o Decommissioning Radioactive Waste Management Systems The Draft EIS does not contain detailed descriptions of the radioactive waste treatment systems or the NRC staff's detailed evaluations of these systems. Such matters are referenced to the Safety Evaluation Report (SER), which has not yet been received by our office for use in this review.

8203170512 820312 6#

h 0 PDR ADOCK 05000482 I D PDR

  • /

(.

Section 3 5 of the applicant's Environmental Report (ER) states that, "Only minor design changes have occurred in the evolution of the Wolf Creek radwaste systems design . .. ." Our comments on the Draft EIS-Construction Permit (DEIS-CP) indicated concerns regarding inconsistencies between the DEIS-CP and the ER (Construction Permit Stage) regarding treatment of containment building ventilation and a lack of consideration of buildup of radionuclides in the cooling lake.

These concerns were resolved in the FEIS-CP and the ER. It now appears that, if the staff's detailed ? valuation of the gaseous and liquid radwaste systems are shown in t.he SER to meet the requirements of Appendix I to 10 CFR Part 50, the operations will be within EPA's Environmental Radiation Standards (40 CFR 190).

However, an explanation is required for the significantly higher gaseous effluents calculated by NRC for this Draft EIS versus those calculated for the FEIS-CP and the calculated liquid of 0.16 curies per year in this-document versus 0.6 curies per year in the FEIS-CP.

Reactor Accidents When discussing accident risk and impacts of design basis accidents, the Draft EIS addresses probabilities of occurrence qualitatively. Yet, when discussing the more severe core melt accidents, the probabilities of occurrence are quantified (Tables 5 8 and 5 9). For consistency in the presentation of all environmental risks, the probabilities of occurrence of infrequent accidents and limiting fault design basis accidents should also be provided.

Operational Environmental Monitoring The applicant's preoperational environmensal radiation monitoring program will be implemented at least two years before initial criticality. The program as described in the Draf t EIS and the ER are acceptable. The applicant's proposed operational program will be reviewed in detail by the NRC staff and incorporated into the technical specifications for the operating license. It is stated that the operational program will be essentially a continuation of the preope rational program. This will be acceptable with the following modifications:

o Samples of drinking water from the town of LeRoy should be collected and analyzed according to provisions of the National InterLa Drinking Water Regulations.

This would require, in addition to the proposed analyses, quarterly analysis for iodine-131, based on a composite of five consecutive daily sanples, and annual analysis for strontium-90, based on a composite of four consecutive quarterly samples or analysis of four quarterly samples.

o There is an inconsistency between the Draf t EIS, Table 5 5, and the ER, Table 6.1-17, regarding the sampling frequency for TLD. The ER states that they will be collected quarterly while the DEIS states that they will be collected quarterly and semi-annually. Although quarterly TLD measurements may be accept able for the preoperational program, monthly measurements would be more suitable for the operational program. Monthly sampling periods provide the only potential for measuring the airborne dose from the plant in excess of normal background _ dose variations. (See: " Natural Radiation Measurements for Environmental Surveillance at Nuclear Power Stations," W.L. Brinck, et. al. , in the Proceedings of Papers Presented at the Meeting of the Tenth Midyear Topical Symposium of tne Health Physics Society).

. - . _ . - 4 .

F

- r ,r  : ,s -

.(' - -

' l , ,

3-1 o Other inconsistencies were noted between the Draft EIS and the ER regarding types of sasples, number and location of samples or sampling frequency for the following pathways: surface water, rooted aquatic plants and shoreline sediments, bottom sediments, algae, fish and invertebrates, livestock feed and fodder, i milk,' poultry and' eggs, and domestic 'and non-domestic meat animals. These inconsistencies should be resolved in the Final EIS.

Decommissioning -

The Draf t EIS states that 'planhing for dectamissioning -in affect health and

" safety as well as coat. We concur in this assessment but were unable to find in the Draf t EIS any. arrangements for financing decommissioning costs. The applicant's Environmental Report,(Section 5 8.4) outlines a number of financing options but does not select a preferrad ~ choice. Decommissioning costs are noted in the range

' of $42 million (applicant,1978 dollars) to $f J million (staff,1984 dollars).

These are large sums and will represent a large cost burden when needed if not accumulated out of revenues, during the plant's operating lifetime. The Final EIS nhould explain what'6pecjric arrangements have been made, or are planned, to

! assure that funds will be available for decommissioning when required.

/.

It is not clear at what point the licensee's financial responsibility is to be teiminatede Terminatiion of the nuclear license is required at the end of facility life, and this requires Aecontamination of the facility such that unrestricted uses can be' allowed. Although the applicant's Environmental Report (Section 5 8) doe not specify a' decommissioning alternative, one option to achieve such s decontamination is SAFSTOR, which allows deferral of decontamination for up to 30

~yenes. It $$ not clear, in such a case, whether license termination would occ tr

prior to, or at the end of< such an extended storage period. If termination occurs at the beginnin'g of the storage period, financial arrangements evidently will be

, necessary to pay for security and the deferred decontamination. The Final EIS should clarify this point.

Economic Risks

~

As the Three Mile Island accident demonstrated, the cost of reactor building decontamination and replacement power following an accident can be considerable.

- This underscores the need to develop standard methodologies for estimating the contribution of these costs to economic risks. Economic risks are addressed in Section 5 9 4 5 of the Draft EIS and, based on low probability of occurrence, annualized risk is calculated to cost $3,500 in 1980 dollars (Table 5 10). We note this cost is much less than the expense of emergency plawing to the affected states. The costs of emergency planning must be included in the economic analysis.

Because of the potentially severe economic costs in the case of an accident, however, we cannot agree with the NRC staff assessment of these costs as "small (Table 6.1).

Timing of Supporting Documentation for the EIS The practice of issuing the Draft EIS in advance of the SER has prevented our performing a complete review of the environmental impacts of the Wolf Creek plant.

As discussed in our comments on radioactive waste treatment systems, this is believed to be detrimental to our review of this Draf t EIS. Also, the Draf t EIS refers to several other topics which are still under NRC review. These include:

/

g e=*'*

1 ,. e

1. Facility safety features. Reference is made (5 9 4 4) to the forthcoming 1

SER for the NRC staff evaluation of safety features and characteristics of the facility and description of some of the accident mitigation features.

This evaluation should include the consequences of a major steam generator tube rupture (Ginna accident).

2. Site features. Reference is made (5 9 4 4) to a review of potential external hazards that might adversely affect operation of the plant. A more detailed discussion of site features is referenced to the SER.

3 Emergency preparedness. Emergency preparedness plans including protective-action measures for the Wolf Creek facility and environs are reported to be in an advanced, but not yet fully completed stage. We are unable to comment on this topic since a draf t of the State and local emergency preparedness plans for Wolf Creek has not yet been submitted to the Federal Emergency Management

Agency for review. NRC Staff findings of adequacy and implementability for both the on-site and off-site plans have not yet been finalized.

4 In view of the above, any conclusion such as that in Section 5 9 4 6 regarding the plant's environmental impact, would seem to be contingent on favorable results from some important ongoing staff reviews, and hence premature. The Final EIS should be withheld until the above-mentioned reviews are completed, or should specifically discuss any of the areas which are still undergoing review.

We urge the NRC to ensure that, in the future, the Safety Evaluation Report is ,

available before issuing the Draft EIS unless the Draft EIS is a complete document not requiring reference to the SER. Material incorporated into an EIS by reference should be reasonably available for inspection within the time allowed for comment (40 CPR 1502.21). We do not believe the citations of missing but

! forthcoming information in the SER constitutes a " reference" in the common meaning of the word.

[ Thank you for the opportunity to review and comment on the Draf t Environmental i

S tatemen t. If you have questions regarding the concerns we expressed in this letter, please contact our office. The staff members most familiar with this project are Messrs. William Brinck and Robert Fenemore. They can be reached at FTS 758-6525 and 758-2921, respectively.

Sincerely yours, i

// . m l

Charles H. Hajinian, Branch Chief l Environmental Review Branch l