W6LF CREEK

' NUCLEAR OPERATING CORPORATION Clay C. Warren Vice President & Chief Operating Officer APR 2 21999 j

WO 99-0035 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station: P1-137 Washington, D. C.

20555 l

Subject:

Docket No. 50-482:

Notification of Changes at Wolf Creek j

Generating Station Affecting the Wolf Creek Physical Security Plan Gentlemen:

This letter provides information -in accordance with 10 CFR 50.54 (p) (2) concerning a change at Wolf Creek Generating Station (WCGS) affecting the Wolf i

i Creek Physical Security Plan.

Attachment I provides a description of changes and a justification for these changes.

Tne changes described in Attachment I will be incorporated into the Wolf Creek Physical Security Plan by August 31, 19t9.

Attachreent II identifies the commitments resulting from this I

correspondence.

l If you have any questions cencerning this matter, please contact me c.t (316) l 364-4048 or Mr. Michael J. Angus at (316) 364-4077.

l Very truly yours, I

()

li Cl C. Warren CCW/rir Attachments 1

cc:

W. D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a K. M. Thomas (NRC), w/a Senior Resident Inspector (NRC), w/a 0 !i ; j ? 1 9905030185 990422 PDR ADOCK 05000482 F

PDR PO. Box 411/ Burhngton, KS 66839 / Phone: (316) 364 8831 An Equal Opporturwty Employer M F HCNET

W Attachmsnt'I'to WO 99-0035

' Paga.l of 1

-Changes Affecting the Wolf Creek Generating Station Physical Security Plan 4

Reasons and Justifications Chanae 6 Pages Affected:

Physical Security Plan:

Page 3-'20 i

Reason for Change: During certain times, Closed Circuit Television (CCTV) camera images become partislly degraded because of sun glare.

In.some instances,: this partial degradation has no affect.on the alarm assessment capability of the Secondary Alarm Station or the Central Alarm Station.

This change to' the Physical Security Plan requires that partial degradation of the ' CCTV camera images be compensated. by posting. a dedicated observer in the area, only if alarm assessment capability _ is affected.

This change will be reflected in the Physical Security Plan by August 31, 1999.

Justification:

Wen CCTV camera : images become-degraded Security will determine -if alarm assessment is affected.

If the affected area does not degrade alarm assessment, Security will start one hour compensatory checks, not to exceed approximately four ' hours.

If area remains degraded for more' than approximately four

hours, Security will compensate by posting a dedicated observer in the area.

This change does not reduce the effectiveness of the Physical Security Plan since compensatory measures continue to be required when alarm assessment is affected.

Change 2 Pages Affected:

Physical Security Plan: Pages'l-1, 1-2, and 1-3 Reason for Change: The title of the " Plant Manager" has been changed to "Vice President Plant Operations and Plant Manager."

This change will be reflected in the Physical Security Plan by August 31, 1999.

Justification This title change is an administrative change.

Responsibilities and reporting relations remain unchanged.

Therefore, there is no reduction in Security Plan effectiveness.

/

n I

D-Attachment IInto WO 99-0035 Page 1 of 1-LIST OF COMMITMENTS The following table identifies.those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document.

Any other statements

'in this. submittal are provided for information purposes and are not considered to be commitments.

Please direct questions regarding these commitments to Mr.

Michael J.

Angus, Manager Licensing and Corrective Action, at Wolf Creek Generating Station,- (316) 364-4077.

CCheGTMENT Due Date/ Event This change to the Physical Security Plan requires that Acgust 31, 1999 partial-degradation of the CCTV cameras be compensated by posting a dedicated observer in the area, only if alarm assessment capability is affected. This change will be incorporated into the Physical Security Plan.

The title of the " Plant Manager" has been changed to August 31, 1999 "Vice President Plant Operations and Plant-Manager."

This change will be incorporated into the Physical Security Plan.

-