|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence ML20128M1471985-07-19019 July 1985 Forwards Nonconformance Repts for May & June 1985,per 730323 Memorandum & Order ALAB-106 & Amend 1 to Facility CP ML20140G3691985-06-28028 June 1985 Responds to Generic Ltr 85-07,dtd 850502,re Implementation of Integrated Schedules for Plant Mods.Util Will Initiate Participation in Integrated Living Schedule If Project Reactivated.Survey Form Encl ML20127P1951985-06-28028 June 1985 Submits Quarterly Rept 48 Per ALAB-106.Const Shut Down Since 840716.No Const Activities Projected for Jul-Oct 1985.Next Rept Will Be Sent by End of Sept 1985 ML20128B8131985-06-20020 June 1985 Confirms 850610 Telcon W/D Hood Re Detailed Schedule for Shunt Trip Mods & Tech Spec Rev Established Per Generic Ltr 83-28,Items 4.3 & 4.4 (Generic Ltr 85-10).Schedule Commitment Entered Into Commitment Tracking Sys ML20127A9901985-06-17017 June 1985 Responds to Generic Ltr 85-02 Re Recommended Actions to Assure Steam Generator Tube Integrity & Rupture Mitigation. Facility Steam Generators in long-term Dry Layup Since Project Shut Down in Jul 1984 ML20126K2871985-06-0707 June 1985 Requests Extension of Due Date for Payment of Bill to Facilitate Resolution of Contested Fees.Conference to Discuss Billing Procedures Also Requested.Review of Info Re Bills Do 184 & Do 185 Encl ML20129B7261985-05-25025 May 1985 Forwards Bechtel Nonconformance Repts,Quality Audit Findings,B&W Repts of Nonconformity,Util Nonconformance Repts,Audit Finding Repts & Quality Action Requests for Apr 1985,per ALAB-106 ML20133C3771985-05-24024 May 1985 Responds to Request for Info on Item 13 in BNL Rept Re Exposure Time of Low Hydrogen Electrodes to Environ After Removal from Hermetically Sealed Containers or Drying/ Storage Ovens.Related Correspondence ML20133D9421985-05-0707 May 1985 Confirms 850426 Telcon Re Backfilling Number of Excavations of Site.Excavations Left Open Due to Removal of Temporary Freezewall Apparatus Last Fall.M Sinclair Response to Aslab 850423 Order & Svc List Encl ML20117J6761985-05-0707 May 1985 Submits ALAB-106 Quarterly Rept 47.No New Individuals Assigned quality-related Duties Since Last Rept.No Const Activities Projected for Apr-June 1985.Next Rept Will Be Sent in June 1985 ML20117G0641985-04-29029 April 1985 Responds to 850425 Request for Addl Info Re Recent Organizational Changes,Per 850425 Telcon.Announcement Involves Resolution of Legal Proceeding Surrounding Project & Possible Sale of Facilities ML20116E8611985-04-25025 April 1985 Forwards Bechtel & Util Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings & B&W Repts of Nonconformity for Jan & Feb 1985,per Memorandum & Order ALAB-106 ML20117G0831985-04-22022 April 1985 Informs of Reorganization Changes to Increase Efficiency of Energy Supply & Assimilate Certain Portions of Projects, Engineering & Const Organization ML20116D3371985-04-19019 April 1985 Ack Receipt of Jan 1985 BNL Rept Re Welding Allegations Encl w/850322 Ltr.Portion of Issues Closed.Remaining Open Issues Impracticable to Close Due to Lack of Resources. Investigation May Resume in Event of Restart 1989-04-28
[Table view] |
Text
} .
/
3 ."...y
.1 James W Cook
-~- *-.;
Vice lhesdent - Projects. Engsneering
,j' 2nd Construction General offices: 1945 West Parnell Road, Jackson, MI 49201 (517) 78& O453 December 30, 1980 Mr Victor Stello ~
Director of Office of Inspection and Enforcement US :iuclear Regulatcry Cc==ission Washingten, DC 20555 :- - -
b -.
MIDLA iD iUCLEAR PLA:IT - ALA3-106 .
QUARTERLY REFORT 00CEET :ICS 50-329 A!D 50-330 FILE: 0.h.6 UFI: 70*01 SERIAL: 10090 Pursuant to the seccnd and third conditions of the Mencrandum and Order ALAB-lC6 dated March 26, 1973 and Amendment IIo 1 to the Midland Plant Ccnstruction Fermits, we are submitting ten (10) copies of our thirty-second reper covering the period January 1 through March 31, 1981.
WRE/1r /
CC: JGKeppler, USIIRC Regicn III RJCook, US!!RC Resident Inspecter, Midland ;
s %i 8701050 %$
L - . . .
Y CONSUMERS POWER CGIPANY REPORT #32, DECEMBER 31, 1980 Pursuant to Conditions 2FB and 2FC of Construction Permits CPPR-81 and CPPR-82, the following report covers the period January 1, 1981 - March 31, 1981.
A. Construction work to be performed during the period:
See Attachment A B.
Supervisors and engineers of the applicant and architect-engineer with quality-related duties who are expected to be onsite during the period January 1 -
March 31, 1981, in addition to those previously reported, are as follows:
- 1. Midland Project Quality Assurance SEBandla - Administration RCHirzel - Civil QAE LDSeamans - Electrical IESTV DMTurnbull - Site Project Quality Assurance Superintendent
(
- i. Bechtel Quality Control i
RBryan - Quality Control Engineer - Electrical i' KGustafson - Quality Control Engineer - Mech / Piping LHall - Quality Control Engineer - Electrical I
WHodkiewicz - Quality Control Engineer - Mech / Piping RHuron - Quality Control Engineer - Civil PLahoti - Quality Assurance Engineer - Mechanical JLange - Quality Control Engineer - Electrical
t Report #32, 12/31/80 2 B. 2. (Contd)
Kttaloon - Quality Control Engineer - Mech / Piping SMehta - Quality Assurance Engineer - Mechanical PWillems - Quality Control Engineer - Electrical
- 3. B&W Construction Company No additions C. Quality Assurance qualifications of supervisors and engineers listed in B above are attached to this report.
D. Changes The l'ollowing personnel no longer are performing quality-related tasks at the site:
- 1. Midland Project Quality Assurance l
RCilollar - Electrical IE&TV LADriesbach - Bechtel Project Quality Assurance Engineer r
i
- 2. Bechtel Quality Control EBadmagharian - Quality Control Engineer - Electrical
. TBurnett - Quality Control Engineer -1 Civil i
' JCioe - Quality Control Engineer - Electrical Nilallenbeck - Quality Control Engineer - Welding.
Alamach '- Quality Control Engineer - Civil r
\
I 1
?
4 Report #32, 12/31/80 3 D. 2. (Contd) ru MMoray - Quality Control Engineer - Mech / Piping WSchumitsch - Quality Control Engineer - Mech / Piping DSquires - Quality Control Engineer - Electrical DThomas - Quality Control Engineer - Electrical l
PTucker - Quality Control Engineer - Mech / Piping l
- 3. B&W Construction Company RGreer - Quality Control Inspector LJacobus - Quality Control Inspector RMurphy - Radiation Safety Officer j In addition, the following changes'have taken place during the last quarter:
i LADriesbach's position as Bechtel Project Quality Assurance Engineer was j
assumed by MADietrich.
TDavis, B&W Construction, was appointed Assistant Quality Control Supervisor.
See Attachtcent B for the latest B&W Site Quality Control Organization Chart.
Further additions and deletions to the list of personnel with quality-related duties l will .be noted in the next quarterly report.
1 l
L...
- Attachment A QUARTERLY REPORT JANUARY,1981 THROUGH MARCH,1981 PROJECT WORK SCHEDULE
- 1. Start the installation of the gate valves and the tilt mechanism in the Auxiliary Building fuel pool.
- 2. Continue the installation of missile shielding throughout the Auxiliary Building.
- 3. Continue the installation of piping, hangers and raceway throughout the Auxiliary Building.
- 4. Start the installation of the fuel racks and the storage stand base in Containment #2.
- 5. Complete the installation of the sump in Containment #2.
- 6. Continue the installation of piping, hangers and raceway in Containment #1 & #2.
- 7. Complete post tensioning in Containment #1.
- 8. Start installing snubbers in Containment #1 and #2.
- 9. Complete the installation of the sprinkler system throughout the Turbine Building.
- 10. Continue the installation of the deluge system through out the Turbine Building.
- 11. Continue the installation of piping, hangers and raceway throughout the i Turbine Building.
- 12. Continue setting mechanical and electrical equipment and installation of bulks in the Diesel Generator Building.
- 13. Start setting mechanical and electrical equipment in the bottom portion of the Dow Condensate pumphouse.
- 14. Start the architectural finishes in the bottom portion of the Guard House.
- 15. Continue the installation of piping, hangers and raceway throughout the Yard facilities.
- 16. Continue the installation of electrical wire and cable.
J
- 17. Continue the installation of HVAC duct and supports in all areas.
r i
e w ,- w ,p --.i ,,.ym- e.- ,. w r ,,- - - , - . g - - -
. .. Q.C. ORGANIZATION AT MIDLAND PROJECT SITE Q.C.SUP ERVISO R
.. R. Sil'0P E ASST. Q.C. S UPV. '
4 T. DAVIS INSP SUPV NDE SUPV 'OC ENG RAY BROWN ROGER TREADWELL CRAIG ASIIWORTil
- t I .
4 l INSP PERSONNEL NDE PER'SONN EL ASST ENG E
! 1. JIM JONES 1. GARY BRAUN , h
- 2. CHUCK BOWEN 2. BRENT EASTMAN JOE B0CIAN s' D
- 3. TOM KANE 3. RICK SCOTT #
- 4. LES NORMAN 4. SCOTT BRONN ,
.tc 4
MPQAD Resume: SEBandla Page 1 of 2 MM'E: Susan E. Bandla ADDRESS P.O. Box 581 Hastings Pa . 55033 DATE OF BIRTH: November 10, 1951 PHONE 715-262-3432 EDUCATION M.L.S. - Library and Information Science - 1975 - State university College of New York.at Geneseo B.A. - Elementary Education - 1973 - State University College of New York at Fredonia EXPERIENCE S_UM'%RY 4/80 - Present Project Assistance Corporation, San Jose, CA Prairie Island Nuclear Generating Plant, Welch, Vn. - Northern States Power Corporation
-Document Control Technician -
Technical consultant during the planning and initial imple-mentation of the Records Management System / Document Control Program for operational records for the Prairie Island Plant.
Responsibilities include procedure developnent for all phases of the program; Document Control; Micrographics'and Data Entry; as well as the training of Northern States Power personnel in these areas.
1/76 - 4/80 Stone and Webster Engineering Corporation, Boston, Vass.
7/78 - 4/80 River Bend Unit 1, St. Francisville, La. - Gulf States Utili-ties Company
. - Administrator Document Control Supervis'or of the Document Control department during the con-struction phase of the River Bend Nuclear Plant. Responsibil-ities included direct supervision of twenty-five clerks; coor-dinating departmental functions with the other site offices; estimating manpawer for the Document Control effort; organi::-
ing office spacer ordering reproduction equipnent for the site's use; initial develognent and implementation of the Permanent Plant Records turnover program for site generated documents.-
7 __-w-- -
y + - - -
Page 2 of 2 IM 6 - 6/78 Nine Mile Unit 2, Oswego, N.Y. - Niagra Mohawk Power Corporation l.
7f77 - 6M 8 - Doumentation Coordinator Responsible for coordinating department activities among four sections of Doct:nent Control; Central Files, Reproduc-tion Distribution and Mail groups. Developed and imple-mented work procedures for the various sections including the initial description of the reorganized Doctnent Control program as requested by the client. Participated in the decision making and policy formation for the department together with the Supervisor tocument Control and the other
- Documentation Coordinator.
IM6 - 7M7 - Senior Reproduction Operator Organized the Reproduction Section of Document Control under the direction of the Supervisor Document Control. Responsible for directing the work activities of eight reproduction oper-ators. Department activities included all site reproduction of drawings and documents; control and distribution of con-struction drawings; machine maintenance; and inventory con-trol for reproduction supplies.
O e *- ,
9 4
l I
i
_ ., _ _. , , - - . _ . . . . . _ _ - , , , . _ _ , . _ . . - _ . _ _ . . _ _ ,, .. . _ , , , ~._ .
MPQAD Resume: RCHirtel
- Page 1 of 2 I.
Name: RUDOLPH CARL HIRZEL Address: 4775 Weybridge Rd E SS #: 368-66-7160 f[{umhus,OH.43220 Birth Date: October 1, 1956 (614) 459-5056 Place of Birth: Corvalis, Oregon EDUCATION ,
1964-1974 Climax - Scotts Community Schools High School Graduation, June 1974 1974-1978 University of Michigan - Ann Arbor BSE Civil Engineering, April 1978 Concentration.- Water Resources 1979-1980 Illinois Central College - E. Peoria Illinois Valley Community College - Oglesby 11.0 credit hours in Business Administration EXPERIENCE October 1978 - Present A & H Engineering Corporation 990 FYeeway Drive N.
Columbus, OH. 43229 and 1501 N. Main St.
East Feoria, IL. 61611 Duties: In Peoria, worked as Staff Engineer resposible for coordination of construction inspection and materials testing, personnel canagement, billing and promotion.
Immediate Supervisor: R.C. Huster, Division Manager.
- transfered to LaSalle County Station, February 1979 Duties: Quality Assurance Supervisor. Responsible for documentation,
> audits, personnel certification and document turnover for destructive materials testing of nuclear plant being built by Commonwealth Edison Company in LaSalle County, Illinois.
Immediate Supervisor: T.W. Kesterson, Regional Manager.
- transfered to Columbus, Ohio,.May 1980.
Duties: Staff Engineer. Responsible for personnel management, coordination of construction inspection and materials testing, billing, client relations, for a 90 megawatt
- Refuse- fired power plant being built by the City of Columbus.
Immediate Supervisor: P.S. Hundley, Division Manager.
O w -----e - ~ - -- -- w ,w--,n, 4, -- .-+
- I Page 2 of 2 i RUDOLPH CARL HIRZEL May 1978 - October 1978 Bulteca Dock and Dredge Co. ;
559 E. Western Avenue l Muskegan, MI. 49443 1 Duties: Field Engineer. Surveying, verification of proper dredging operations, blue print reading.
Immediate Supervisor: M.J. Henthorn, Project Engineer.
- promoted to ,QA/QC Engineer, August 1978.
Duties: Responsible for verifying all materials delivered to site for conformance to project specifications, auditing construction operations and vendors, client interface, preparation of site procedures and QA Manual.
Immediate Supervisor: J. Parmater, Vice President -Operati6ns.
Above duties in connection with Consumer Power Company, J.H. Campbell plant, Unit #3, Port Sheldon, Michigan.
January 1978 - April 1978 University of Michigan College of Engineering -
Department of Civil Engineering 301 W. Engineering Bldg.
Ann Arbor, MI. 48109 Duties: Course grader. Check papers for class of 50 students, 400 level Engineering Hydrology.
Immediate Supervisor: E.F. Brater, Professor - Hydraulics c
May 1977 - December 1977 Michigan Testing Engineers, Inc.
1342 N. Main. Street Ann Arbor, MI. 48104 Duties: Engineering Technician. Construction inspection.and '
materials testing, field and laboratory experience, client contact.
Immediate Supervisor: U.K. Snartzendruber, Branch Manager Signed: C k hd' Rudolph ICarl Hirzel i d i
' emed3
~. .
MPQAD Resume: LDSeamans ,
, i Page 1 of 2 RESU>E OF: Larry D. Seamans l
1910 William 0 North Platte, NE 69101 [
Phone: 30S ' '211 .l 308-L'. .561 -
l l
Kansas State University, G.P. A. 3.3/4.0, June, 1973 EDUCATION: B.S.E.E. ,
1 Graduate Information: Completed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> towards M.B. A. , University of
- Dallas at Irving, G.P. A. 3.2/4.0 LPERSONAL: Date of Birth: April 14, 1951 Place of Birth: Hastings, NE Marital Status: Sirgle CERTIFICATION: Liquid Penetrant, Leak Test, Visual Examination, Lead Auditor, Radiographic Testing EXPERIENCE:
June 1976 NEBRASKA PUBLIC P0k'ER DISTRICT - Electrical Engineer
. to Present; Duties: (October 1978 to Present) - Quality Assurance Engineer - Electrical Engineer - My present position is Ouality Assurance Engineer at the construction site of (2) 650 M W Fessil Fuel Plants.and I perform duties in the following areas:
- 1. Auditing of Contractors Quality Control in accordance with with Contract Specificaiions, Contractors Quality Control
~
Procedures, and applicable code requirements.
- 2. Auditing and monitoring the total electrical installation, in accordance with contract specifications, drawing, manu-
. f acturer instructions, and code requirements.
- 3. Auditing and minitoring the storage and maintenance of electrical material and equipnent.in accordance with written procedures, manuf actures specifications, and
~
contract specifications.
- 4. Reviewing contractors electrical procedures for motor maintenance, calibration, cable pulling, motor alignment, meggering of electrical cable, and start-up test'ing.
- 5. Visual inspection of contractors welding.
(August 1978 to Scotember 1978) - Generation Engineer - Electrical Engineer Wrote responses to NRC questions concerning systens at Cooper I;uclcar Station (CSS). Reviewed electrical equipment contracts for a 650 IN coal plant.
(Dececber 1977 to July 1978) - Worked for Construction Management, as an Instrument Coordinator at a 650 M4' coal plant.
(June 1976 to ' ovember 1977) - Engineered and installed electrical-Minor Design Changes for:CNS. Was'part of1the electrical. engineering staff at CNS during refueling outage. Reviewed electrical bid.
proposals for contracts on a 650 Mc coal plant.
Page 2 of 2 June 1973 TEXAS INSTRDENTS INC.
to June 1976 Duties: (November 1975 to June 1976 - Radar Group - Electrical Design Engineer - Performed the e3ectrical engineering for inplementation of a design change for and Instrument Landing System, to with-stand lightning surges and voltage transients.
(April 1975 to October 1975) - Geophysical Services Group-Marine Instrument Engineer - Maintained electical geophysical recording equipment. Performed tests to insure instruments were calibrated, repaired prob 1 cms, and maintained production logs.
(J ;ne 1973 to Anril 1975) - Equipment Group- Electrical Design Engineer - Performed electrical circuit design of infrared radar; some analog and digital circuit design. Performed the electrical interface of a 980A computer with the infrared radar system, Performed electrical support for infrarrd system in production; correcting electrical problems; finding substitute parts with acceptable lead time; interfaced with various production person-nel to expedite equipment completion.
, , MPQAD Resume: DMTurnbull Page 1 of 2 DONALD M TURNBULL .
Senior Supervising Engineer Midland Project Quality Assurance Department Consumers Power Co=pany
, November 19, 1980 1
EDUCATION University of Toronto, B.A. Sc. Electrical Engineering 1949 CERTIFICATIONS Province of Ontario -
P. Eng (Electrical)
State of California -
P. E. (Manufacturing)
ASQC -
Certified Quality Engineer AWS -
Certified Welding Inspector Canadian Velding Bureau - Approved Welding Engineer ANSI N45.2.23 - Audit Team Leader (Joy. Mfg Co)
SNT-TC-1A -
Level III PT)
RT) Joy Mfg Co MT)
FORMAL COURSES & SEMINARS Statistical Quality Control - ASQC, Cincinnati Section, 1968 Quality Control - ASQC, ETI, Milwaukee, 1973 Quality Control Management - University of Connecticut, 1974 Significance Testing & Rapid Data Analysis - ASQC, Akron - Canton .Section,1976 CQE Refresher Course - ASQC, Akron - Canton Section, 1978 EXPERIENCE -
Joy Manufacturing Co, New Philadelphia, Ohio Division Jan 1972 - Nov 1980 - Manager of Quality Assurance Twenty percent of. company's dollar volume is in Government work, involving HIL-Q-9858A or MIL-I-45208. Thirty percent is in nuclear products, requiring i adherence to 10CFR50 Appendix B, and ANSI N45.2.
Responsible for training of. inspectors, writing inspection instructions, training QA engineers, qualifying NDE personnel, welders, painters, and
- writing QA/QC procedures.
! Oct 1969 - Jan 1972 - Manager of Engineering for Mechanical Products Responsible for the Design of new products, maintenance of product line, failure analysis, assistance to Manufacturing and Sales.
! Husk [ProductsInc,'. Florence, Kentucky (Subs.'. Brandy. Corp)
' . Jan 1966 I~May 1969 - Assistant Chief Engineer Responsible -for stress analysis, new product design, . estimating jobs, tooling design and assistance to manufacturing. Initiated Quality Control System.
Trailmobile Inc, Cincinnati. 0hio (Div. of. Pullman Corp)
Mar 1961 - Jan 1966 - Manager.of Research & Developmenc Responsible .for conceptual development of entire new product line, including stressionalysis, design of mechanical components, and designing tests.
2 .
3 -. . - . . - ,,._,r , .p - m-,,., --,w. _ , , , - , . - _ c-w.g .,,,w.., . . ~ - . . , , . , , - - - ,r.. . . - __
2 Donald M Turnbull EXPERIENCE (Contd)
Highway Trailer Co, New York, New York Mar 1960 - Mar 1961 - Director of Product Development Responsible for development of entire new product line.
Canadian Trailmobile Ltd, Scarborough, Ontario y 1957 - tbr 1960 - Chief Engineer l Responsible for design of new products, adaption of exiting products to - 1 special applications, failure analysis, customer liaison on. special ap- t plications, and plant tooling.
T.H.S. Services Ltd, Rexdale, Ontario ,
1955 - 1957 - Partner & Chief Engineer Special rachinery fabrication and millwright ' firm.
Simoniz Company Ltd, Scarborough, Ontario
,1953 - 1955 - Plant Manager Responsibic for installation of machinery, Manufacturing, Purchasing, Warehousing.
PROFESSIONAL SOCIETIES Association of Professional Engineers of Ontario American Society for Quality Control American Welding Society American Society of Mechanical Engineers PAPERS
" Common Sense Makes a Quality Program" - Quality Magazine, April 1979 "What the QA Manual Should Cover" - Quality Magazine, August 1980 l
"Qualityf mprovement I - How to Achieve It" - ASQC Seminar i
t 4 e
L r
L
WORK HISTORY
SUMMARY
(A-LAB RESUME)
DATE: _12/1/80 NAME: Btyan, Pobert J EMPLOYEE NO. 757686 (LAST) (FIRST) (INITIAL)
EDUCATION: University of Maryland, BSEE, 1968 Grantham College of Engineering - Correspondence Cleveland Instituta,sf Electronics - Correspondence WORK HISTORY: 1978 - Present - Magnavox Government and Industrial Elect-ronics Co., Fort Wayne, Ind. - QC Field Engineering and Production Engineering; installation and repair of equipment.
1975 - 1978 - Memcor Division, E-Systems, Huntington, Ind. -
Quality Control Engineer; specification changes to comply with government requirements; First Article Reports; environ-mental evaluations.
1972 - 1975 - Unitote-Regitel Division, General Instruments Corp., Towson, MD - Manufacturing Supervisor; responsible for employee evaluations and relations; responsible to pro-duction engineering for quality of final product.
1969 - 1972 - Military Service, US Army ensammmmme e mm e m e
WORK HISTORY SUt@tARY 11 (A-LAB RESUME)
DATE: 12/17/80 ,
596066 j EMPLOYEE NO.
NAME Gustafson, Karen S.
(LAST) (rIgST) (3)
High School diploma - Hanford High School, Richland, WA 1977.
EDUCATION:
WORK HISTORY: Januarv. 1979 to November 1980 - Employed as Field Assistant for i Mechanical Supervision for Bechtel Powcr Corn, at the Midland Site. Sorting.
filing & distributino comnuter print-out " status enrdn" & nrnject unrv arnt.Ange rn y, quantity reporting & preparing installation " work packages' for pipe spools, restrainti valves & field _ welds. Prepare weekly status reports and manpower listings for i
superintendents. Update, xerox & distribution of schedules. Log & track hancer prints. Order hangers, valves & spools - keep track of deliveries. Keep prints marked up concerning installation & progress. Workdown of welds, spools, and __
- hangers to see if complete. General errands for piping superintendants and general I
f foremen. Log & update prints for construction, both field & office.
June,1977 to January 1979 - Travelled to various states working at part-time, nonprofessional jobs to cover expenses. 1977 - Little Italy Tavern - waitress-l 1979 -
Port Huron, MI. 1978 - Wendys Hamburgers - Waitress - Spokane, WA.
i Black Ram Tavern - Waitress - Mattawan, MI.
f
^
. 4e D
, = n r -e y n -e 3 ~--n , , , - - ~ -.rv. ~e ,- -w-, ,nng ,-- ,- ye-
i -
l
SUMMARY
l (A-LAB RESUME)
I DATE: 12/17/80 4
l EMPLOYEE NO. 757701 NAljE HALL, LARRY L.
l (LAST) (FIRST) (1) i i EDUCATION: Midland High School - General- 1963
) USMC - Basic Electronics School - 13 weeks 1963 i
Delta College - Electronics tech. - 8 credits 1967 j Devry Institute of Technology - Correspondence - 1 year 1973 i
I Xerox International Center for training and Manage. ment Development - 9 credits 1977
! 'I i
WORK HISTORY: 5/63 to 8/66_USMC Radio Operator. 10/66 to 6/75 Dow Chemical _Co..
- Midland, MI, Chemical Operator - Responsible for the manufacture of chemical oroducts.
1 l
6/75 to 1/76 Owned and operated TV repair business in Midland. MI. 7/76 tn 4/7A Quasar Corp., Los Angeles, CA. 4/76-to 6/76 Panasonic Cnen_ , Inn Annnlap, ca.
~
i 6/76 to 3/77 Endevco Corp, San Juan Capistrono, CA. - Performed acceptance testina on 1
l 4
clectronic systems: calibrated electronic test equipment. 3/77 to 4/78 Xeroi corn -
Los Angeles, CA. - Technical Representative. 9/78 to 4/79 Audio Central' Alarm Cn.
Saginaw, MI - Installation foreman. 4/79 to 7/79 Midwest Detection, Midland. MI -
Alarm Installer. 7/79 to 11/80 Barns Secruity Midland, MI - Security Guard on this i
site.
l *
- 1
. )
A e e O a. . - ^
O 2
.a %
D & 4
- +++% im.eE Ev <e 1,.
TEST TARGET (MT-3)
$+4 4
1.0 5 m EM y ll IE I,l
[m HM
!M l.25 'd' l.4 ill l ll - -
11 6
< 6" *i 4% +/4 4M/M v y o
'#$+&4
<>e .<>s,
<ge
A 4 i
- $+$b)* --
TEST TARGET (MT-3) k.k
)
1.0 !!m EM y- @ HE
- 1.l t'n IllM I l.8 1.25 1.4 1.6
- < 6" .
i i
l b
N', r 3,4 o
'4 :f')h 4.+,,+.
= .J
WORK HISTORY
SUMMARY
(A-LAB RESUME)
- DATE: _9/12/80 NAME: Hodiewicz, Walter P EMPLOYEE NO. 946001 (LAST) (FIRST) (INITIAL)
EDUCATION: 1933 - 1936 Technical Hich School - New Brunswick , NJ -
Diploma in Machine Shop Practice and Draftina WORK HISTORY:4/80 -6/80 (nocheal) rnynen unwnr olant, Poulek, "O -
Hydrostatic test inspector of doctile iron / prestressed cement lined steel pipelines.
9/79 - 4/80 (Bechtel) Palisades Nuclear Plant, Covert, MI-Quality Control Engineer.
10/78 -5/79 Bechtel Pipeline Division in Hassi R'mel, Algeria-Ass't Supt. Camp Utilities, Air Conditioning and Refrigeration.
9/75 - 10/78 Bechtel Pipeline Division, Lhok-Sukon, Indonesia-Ass't Supt. Camp Utilities, Air Conditioning and Refrigeration.
5/73 -8/74 Licensed Real Estate Salesman in New Jersey.
5/71 - 12/72 Burns and Roe Corp., Marshall Islands - Indus-trial Air Conditioning / Utilities.
1965 - 1970 Texaco, Indonesia / Libya - Sr. Supervisor Refrig-eration/ Air Conditioning, Water Distribution System and Utilities.
WORK liISTORY
SUMMARY
(A-LAB RESUME)
DATE: 9/4/80 NAME: Huron, Randy C EMPLOYEE NO. 757475 (LAST) (FIRST) (INITIAL)
EDUCATION: Lee College - Two years - Graduated Spring of 1974 Texas A&M University - Four Years (Building Construction)
Graduated Spring of 1980 - Attended 6 years WORK HISTORY: Brown & Root - Summer 1972 (3 months)- Engineering Ass't Triple B Corp. - Summer 1973 (3 months) - Engineering Ass't Brown & Root - Summer 1974 (3 months) - Engineering Ass't Brown & Root - Summer 1975 (3 months) - Engineering Ass't Fullco, Inc. - Summer 1976 (3 months) - Engineering Ass't e
- = es w m -
R4
WORK HISTORY
SUMMARY
( A-LAB RESUME)
DATE: 12/10/80
, NAME: Lahoti, Prem C EMPLOYEE NO. 776161 (LAST) (FIRST) (INITIAL)
EDUCATION: B.S. Mechanical Engineering - Osmania University, India - 1966 IIA Management 42 - A cource in effective behavior organization WORK HISTORY: 1) Bechtel Power Corp. - Nov. 24, 1980 to Present
- 2) United Engineers and Constructors, Inc. - Sept. 1980 to Nov. 1980 - Supervising Engineer - Quality Planning
- 3) Kemper Group - Nov. 1975 to Sept. 1980 - Authorized Nuclear Inspector Supervisor
- 4) Hartford Steam Boiler Insp. - July 1974 to Nov. 1975 -
Authorized Nuclear Inspector
- 5) Fluid Systems Inc. - June 1973 to July 1974 - Sales Engineer
- 6) University of North Florida - June 1972 to June 1973 -
Senior Operating Engineer
- 7) Balsco Textiles, Atlanta, GA - Nov. 1970 to May 1972 -
Plant Engineer
- 8) The Sirsilk Limited, India - Aug. 1967 to Aug. 1969 -
Plant Maintemance Engineering Supervisor m
b ,
UURK HIS10RY
SUMMARY
(A-LAB RESUME)
DATE: 9/8/90 EMPLOYEE NO. 757467 NAME Lange, Jeffrey A.
(LAST) (FIRS 1) (1)
EDUCATION:
liinh School - Burnt Hills - Ballston Lake Hich School, Burnt Hills, NY 1971 - 1974. Dale Carneoie Sal'ennan Course. April - June 1974. Navv Elect ronic Tech. 'A' School. September 74 to April, 1975. Navy Nuclear Power School and Prototype. Mav. 1975 to June. 1976. Short Courses (1-2 weeks) - Submarine Damaca Control: Reactor Principles (T-9): Transistor Theory and Solid. State Theory; Reactor Maintenance School.
WORK HISTORY: June, 1974 to May, 1980 Navy Exnerience: School for two vearn for electronics and Nuclear Reactor Operator. Reported to submarine to join reactor controls division.
Qualified to stand wat chas in Enoineerinn nnd tn dn -nint ennnee _
on reactor control instrumentation and protection systems. Periodically checked calibration of equipment and inspected / cleaned it. Corrected any discrepancies bv
'v trouble shooting and repairing equipment.
Maintained and supervised implementation of reactor plant maintenance. Pevinwnd documentation for equipment safety certifications (reactor safety).
Stood reactor operator watch on SSW/S3G plant.
n
.e e ~
m
WORK HISTORY
SUMMARY
( A-LAB RESUME)
DATE: 10/7/80 NAME: Maloon, Richard F EMPLOYEE NO. 757531 (LAST) (FIRST) (INITIAL)
EDUCATION: 1938 - 1942 Norway High School, Norwav, ME 1942 - 1943 Mechanical Engineerina, US Army (no decree) 1938 - 1942 Machinist Apprenticeship - Journev Machinist 1962 Radiography and Radiographic Interpretation - US Navy (400 Hours) _
WORK HISTORY: 6/79 - 11/79 Tibbetts, Abbott, McCarthy and Stratton, New York, NY - Specification Engineer assigned to the con-struction of air bases in Israel.
1/79 - 6/79 Walsh Construction Co., Darren, CN - Quality Assurance Engineer assigned to writing the QA and QC manuals for the Forked River Nuclear Power P lant.
5/70 - 6/79 Stone and Webster Engineering Corp., Boston, MA - QC Engineer in charge of the mechanical and piping systems at the Maine Yankee Power Plant (5/70 -11/72);
QC Engineer in charae of the mechanical, piping, welding, receiving and civil disciplines at the Beaver Val. ley Nuclear Power P lant (11/72 - 4/74); QA Engineer Level II assisting the Sr. FQC Supt. in the discharge of his duties at the Boston Office (4/74 - 3/76); Sr. FQC Engineer Level III in charge of mechanical, piping, welding, receiving and docu -
mentation'at the Nine Mile II Nuclear Power Plant (3/76 -
1/79).
. I
, WORK HISTORY
SUMMARY
( A-LAB RESUME)
DATE: 12/8/80 NAME: Mehta, Sham (LAST) EMPLOYEE NO*
(FIRST) (INITI AL)
EDUCATION: MBA Northern Illinois University, Dekalb, Illinois (Currently Enrolled)
Bachelor of Science in Mechanical Engineering (BSME) December.197L Michigan Technological University, Houghton, Michigan
> WORE HISTORY: Aurora Pump, Unit of General Signal, N. Aurora, Illinoic 7/79-Manager, Quality Assurance. Responsible for managing the Company's Quality Assurance Program; developing and implementing policies and procedures.
Henry Pratt Company, Aurora, Illinois 4/77 _ 7/79 Quality Assurance Engineer. Responsible for reviewing specifica-tions and developing procedures to meet the requirements of the-ASME Section III Code and the various ANSI standards.
Air Balance, Inc. , Chicago, Illinois 1/72 - 4/77 Quality Assurance Manger. Responsible for planning, staffing and implementing the Company's 0;ality Assurance Program to meet the requirements of ANSI-N-45.2. QJalified to SNT-1C-1A for the 1bgnetic Particle and Liquid Penetrant methods.
A WORK HISTORY
SUMMARY
(A-LAB RESU:1E)
DATE: 12/16/80 EMPLOYEE NO. 299874 NAME Willems, Peters P.
(LAST) (FIRST) (I)
EDUCATION: B.S. Electrical Engineer 1966-1970 Queen's University, Kingston, Ontario, Canada WORK HISTORY:
5/70 - 5/73 _ Electrical Design Ennineer - International Nickel En. in Copper Cliff, Ontario - Detail design of grounding, power and lighting.
6/73 - 7/76 Electrical Engineer - Catalytic Enterprise - Sarnia, Ontario - Supervised two electrical subcontractors and Field Engineering on Petrochemical Plants.
8/76 - 10/77 Field Area Electrical Engineer - Canada Bechtel Ltd. , Refinery and Chemical Division - Plan and organize work activities, review installation methods, resolve engineering problems and commission and test the final installation.
10/77 - 3/78 Design Engineer - Bechtel Inc. - R&C Houston- Preliminary design of one line and specifications.
11/78 - 4/80 Field Engineer - Bechtel Power Corp., AAPD/Const. Midland - Make sure installation of conduit, tray and electrical equipment is per the design drawinas, r prepare field change notices and requests, and resolve nonconformance problems in j systems turnover group, prepared final exceptions list.
5/80 - 10/80 Dgsign Engineer - Bechtel Power Corp. , AAPD/Desion Ann Arbor - Added new raceway to drawings, resolved circuit routing problems, revised and checked drawings
,, jand specs. _