ML19296D382

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Seismic & Environ Component Qualifications.Only Foxboro Model E10 Transmitters Were Unable to Meet Qualification Requirements
ML19296D382
Person / Time
Site: Midland
Issue date: 02/29/1980
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19296D383 List:
References
MCAR-25, NUDOCS 8003040490
Download: ML19296D382 (2)


Text

.

7 CODSUH18IS I

.SI'

  • POVl80 g g Stephen H.Howell Senior Vice lhesident General of fices: 1945 West Parnell Road, Jackson, Michigan 49201 e (517) 7884453 February 29, 1980 Hove h8-80 Mr J G Keppler, Regional Director Office of Incpection and Enforce-ent Region III US Nuclear Regulatory Cc= mission 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLANT UNIT NO 1, DOCKET NO 50-329 UNIT NO 2, DOCKET NO 50-330 COMPONENT QUALIFICATIC.N TEST DOCUMENTATION RE-REVIEW

Reference:

S H Howell letters to J G Keppler; Midland Nuclear Plant ;

Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Component Qualification Test Documentation Re-Review;

3) Serial Howe-252-78, dated November 28, 1978
2) Serial Howe-17-79, d ated January 17, 1979
3) Serial Howe-79-79, dated March 9,1979 h) Serial Howe-133-79, dated May h ,1979
5) Serial Howe-193-79, dated July 6,1979
6) Serial Howe-2h6-79, dated September 10, 1979 The refercrced letterc were interim 50.55(e) reports as is this letter.

The status of the Ecchtel ecnponent qualification program is surnariced in the enclocure. Beyond the previoucly identified Fcxboro Mcdel E10 trans-mitterc, no otner equipment hac been determined not to be capable of meeting its qualification requirements.

The B&W re-review of available qualification documentation versus specifi-cation requirements revealed only minor discrepancies. Comparison of the specification requirements vercus FSAR ccmmitmento revealed additional discrepancies. The resolution of these discrepancies should be completed in 1981.

Our next report will include a Qualification Test Statuc Report covering the B&W supplied equipment with format and detail cimilar to that which is L G^

8003040 1 (U

2 Hove LS-60 provided for Bechtel with the Enclosure to this report. The next report ,

either interim or final, vill be sent on or before June 13, 1980.

.b $ f" PWJ /WRE/1r

Enclosure:

MCAR-25, Interim Report #7 v/ attachment; Seismic and Fnviron-mental Ccmponent Qualification, dated February 1,1980 CC: Director, Office of Inspection & Enforcement Att: Mr V'ictor Stello, USNRC (15)

Director, Office of Mane 6ement Information & Progre:a Ccntrol, US:iRC (1) 8 4

k