Rev 0 to JPN-PTN-SEMJ-92-034, Safety Evaluation for Interim Fire Protection Sys Configuration to Support Unit 4 Startup.
ML17349A406
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/23/1992
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17349A405 List:
References
JPN-PTN-SEMJ-92, JPN-PTN-SEMJ-92-034, JPN-PTN-SEMJ-92-34, NUDOCS 9210190116
Download: ML17349A406 (78)


Text

FLORIDA POWER AND LIGHT SAFETY EVALUATIO POR THE INTERIM RIRE PROTECTION SYSTEM CONFIGURATION TO SUPPORT UNIT 4 STARTUP TtHQCEY POINT UNITS 3 a 4 JPN- PTN" SEMLT 03 4 REVISION 0 921019011b 921008 PDR ADOCK 05000250 F PDRI'

JPN-PTN-SEKJ-92-034 Revision D Page 2 oS l8 PP CO 0 PLANT UNIT {S)

TITLE A T UAT ON FO I I IR ROT CT 8 ON GU T 0 0 SU RT T 8 LEAD DISCIPLINE AN C ENGINEERING ORGANIZATION PTN RODUCTXO NE I 8 CRO DISCIPLINE IMTERPACE PREPARED VERIFIED APPROVED JPN APPROVED INTERPACR YES/NO BY/DATE BY/DATE BY/DATE BY/DATE ELECTRXCAL ~ss I Er C CIVIL N NUCLEAR Yi~~

FUELS Ns ESX PRO J'ECTB OTHER INTERFACES e rot ti E i,ne

'PN FORM 24 REV, 1/91

JPN-PTH-SEHZ-92-034 Revision 0, Page 3 oS 28 ABSTRACT High winds associated with Hurricane Andrew caused the Turkey Point (PTN) Raw Water System high tower to collapse. As a result of the collapse of the high tower, portions of the PTN Fire Water Supply System were damaged. Fire Water Supply System components damaged during Hurricane Andrew include Raw Water Tank I (RWTI) and its appurtenances, the county water supply line to RWTII, the electric driven fire pump casing and controller, both fire water jockey pumps, portions of the fire protection piping system and piping system supports, power cabling for the electric driven fire pump and jockey pumps and space. heater and annunciation cables for the electric driven fire pump.

Plant Change Modifications (PC/M's)92-102, 92-105,92-106, 92-107 and 92-108 (References 8.1 thru 8.5) provide the necessary procurement and construction details needed to restore the Pire Water Supply System back to the pre-hurricane design configuration.

However, as a result of the construction effort involved in the restoration of RWTI, these PC/M's will not be fully. implemented in time to support startup of Turkey Point Unit 4.

The purpose of this safety evaluation is to identify the Fire Wat'er Supply System licensing and design basis requirements and determine what system configuration requirements are, needed for Unit 4 startup. This interim Fire Protection System configuration will be evaluated against the system operability requirements specified in the Turkey Point Technical Specifications and the Updated Final Safety Analysis Report (UFSAR). The necessity for supplemental fire protection equipment to meet system design requirements will also be determined.

In accordance with Section 6.5 and Figure 1 of Nuclear Engineering Quality Instruction QI 2.3, Safety Classifications", fire protection equipment that is required to protect safety related equipment in accordance with the requirements of 10 CFR 50, Appendix R, shall be classified as Quality Related (QR). In addition, those systems and components that are not classified as Safety Related, but are required by Plant Technical Specifications, shall be classified as Quality Related (QR). Accordingly, this safety evaluation is appropriately classified as Quality Related.

LTPN-PTP-SQg-92-Q3<

Revision 0 Page 4 of 18

1.0 DESCRIPTION

/PURPOSE On August 24, 1992, high winds associated with Hurricane Andrew caused the Turkey Point (PTN) Raw Water System high tower to collapse. As a result of the collapse of the high tower, portions of the PTN Fire Water Supply System were damaged. Fire Water Supply System components damaged during Hurricane Andrew include Raw Water Tank I (RWTI) and its appurtenances, the county water supply line to RWTII, the electric driven fire pump casing and controller, both fire water j ockey pumps, portions of the fire protection piping system and piping supports, power cabling for the electric driven fire pump andsystem jockey pumps and space heater and annunciation cables for the electric driven fire pump.

Restoration efforts are underway to restore the PTN Fire Water Supply System back to the pre-hurricane design configuration. The design and construction details required for complete system restoration can be found in the Reference 8.1 thru 8.5 PC/M packages. However, the complete restoration of the Fire Water Supply System to the pre-hurricane design configuration will not be completed in time to support startup of Unit 4. purpose of this safety evaluation is to identify the Fire WaterThe licensing and design basis requirements and determineSupply System what system configuration requirements are needed for Unit 4 startup. The necessity for supplemental fire protection equipment to meet system design requirements will also be determined.

2.0 SYSTEM DESIGN BASES The Turkey Point Units 3 and 4 Fire Protection Program is discussed in Appendix 9.6A of the Updated Final Safety Analysis Report (UFSAR). Appendix 9.6A provides a comprehensive description of= the Fire Protection Program as documented with the Nuclear Regulatory Commission (NRC). Section 3.1 of Appendix 9.6A describes the Fire Water Supply System. The Fire Water Supply System is a common system which is shared by all four Turkey Point Units (fossil and nuclear). The system is designed to provide a reliable source of water to the automatic and manually actuated water suppression systems, hose stations and hydrants. The Fire Water Supply System consists of fire water storage tanks, fire pumps, yard main distribution system and associated piping and valves.

By design,, two separate water tanks are provided as the sources of fire water. Raw Water Tank I (RWTI) has a capacity of 500,000 gallons and RWTII has a capacity of 750,000 gallons. Each tank has 300,000 gallons of water dedicated to the fire water system. Each tank's water supply provides 100% of the required fire water capacity. Additional tank outlet nozzles, such as service water, are located high enough on each tank wall to prevent service water drawdown from the dedicated fire water inventory. Water to each tank is supplied from a 12 inch county water main and tank level is automatically maintai.'ned above the service water outlet nozzle.

Both RWTI and RWTII and the associated tank isolation valves are

JPN-PTN-SErg p3g Revision p Page 5 of 18 classified as Quality Related since they provide the water source for the Fire Water Supply System. However, the county water supply lines and associated instrumentation are classified as Not Nuclear Safety.

The fire water supply outlet from RWTI is electric driven fire pump and the fire waternormally aligned to the tank outlet from RWTII is normally aligned to the diesel driven fire pump. A crossover line between the suction of both pumps provides the capability for each RWT to supply either fire water pump. The crossover line is normally isolated.

The electric fire pump is rated at 2000 at 140 psi and the diesel driven pump is rated at 2500 gpm at gpm140 psi.. The electric fire pump is powered from 480V Load Center 3C which is part of the safety related emergency power system. During on-line operation Load Center 3C is powered from the Main Generator through the Unit 3 Auxiliary Transformer, 4KV Switchgear 3A and the Load Center 3C Transformer. When Unit 3 is off-line, Load Center 3C is normally powered from offsite through the Unit 3 Startup Transformer, 4KV Switchgear 3A and the Load Center 3C Transformer. On loss of offsite power, Load Center 3C is automatically powered from Emergency Diesel Generator 3A and the electric fire pump can be manually loaded (by manually closing the fire pump's load center breaker) onto the diesel generator provided EDG load limits are not exceeded.

Both pumps are automatically started on low fire water header pressure by their respective fire pump controller and pump operation is annunciated in the Control Room. A loss of power to the controllers is also alarmed in the Control Room.

The fire water pumps discharge into the 10 inch underground cast iron fire main for Unit 3 and 4. The fire main provides fire water to the standpipes, hose stations, hydrants and suppression systems.

3.0 SYSTEM CONFIGURATION POR UNIT 4 STARTUP As stated above, portions of the Fire Water Supply System had been damaged by Hurricane Andrew. PC/M's92-102, 92-105,92-106, 92-107 and 92-108 (References 8.1 thru 8.5) provide the design details needed to restore the entire system back to the pre-hurricane design configuration. This section will describe the portions of those PC/M's which are required to be implemented prior to Unit 4 restart. Supplemental fire protection equipment requirements will also be identified.

A. Fire Water o r es Raw Water Tanks I and II (RWTI and RWTII) provide the independent fire water sources for Units 3 and 4. The requirement for two independent fire water sources is specified in plant design documents and plant Technical

ZPN-PTÃ-SEKT-92 Pape 6'f Z8 03'evision 0

Specifications. However, RWTI and its appurtenances were completely destroyed by Hurricane Andrew. In addition, the RWTII county water supply line and Nssociated level controls and instrumentation were damaged and require replacement.

Listed below are the repairs that are required to be performed on RWTII in addition to identification of the interim alternate water source for RWTI until restoration of RWTI and the Pire Water Supply System is completed.

Raw Water Tank II RWTII RWTII has remained operable following Hurricane Andrew and is capable of providing its 300,000 gallon fire water source required by design and plant Technical Specification Limiting Condition for Operation (LCO) 3.7.8.l.b. However, the county water fill line was severed and must be replaced in order to provide makeup capability to the tank. Portions of PC/M 92-106 (Reference 8.3) must be implemented in order to restore the permanent 6 inch county water supply line prior to Unit 4 startup. The 6 inch county water supply line consists of a main supply line which includes an automatic level control valve and a 6 inch manual bypass line. However, the tank level control valve does not need to be functional in order to provide makeup water to RWTII. In the interim, tank operations will be accomplished by utilizing the manual bypass fill line. Manual operation precludes the need to have the level control valve and associated instrumentation functional for Unit 4 restart. Tank level will be monitored by plant operators using the local tank mounted. level indicator, and therefore, tank level control alarms in the Control Room and recording at the Water Treatment Plant are not required for Unit 4 startup. The level control instrumentation will be restored to the design configuration subsequent to Unit 4 startup.

Alternate Wa er S ur Xn order to satisfy UFSAR and plant Technical Specification requirements, an alternate water source will be provided for Units 3 and 4 during the construction effort associated with the Turkey Point cooling canals. 'his replacement of RWTI. This alternate water source consists of water source essentially provides an unlimited water source for fire protection purposes (well in excess of the 300,000 gallons required by design) and has been utilized in the past at Turkey Point as an acceptable interim source of fire water (Reference 8.15). Fire water pumping requirements from the cooling canals are discussed below.

Fire water pumping capability will be provided by either of

JPN- P2Ã- SEK7 034 Revision 0 Page 7 of I8 the 100% capacity permanent plant fire pumps (electric diesel driven) or supplemental pumps as discussed below. and Permanent Fire P s'he electric driven fire pump casing, controller and and control cables were damaged by Hurricane Andrew andpower will be replaced under PC/M 92-107 (Reference 8.4). The damaged electric fire pump casing is being replaced with hydraulically identical pump (Fairbanks Morse Model 8" a 5824F) supplied by the original pump supplier. The replacement pump is a UL Listed fire pump and is rated for 2000 gpm at 140 psi. The replacement pump's certified performance curve has been reviewed against the original pump curve and both curves are essentially identical. Therefore, from a pump performance standpoint, no changes have been made to the system and pump hydraulic per formance and design capabilities are maintained.

The electric fire pump controller is designed to automatically start the electric pump on low fire header pressure and provide the appropriate control and alarms. The electric fire pump controller is being replaced damaged with a controller with the same characteristics as the original controller and supplied by the original pump controller supplier. The replacement controller is UL Listed and also meets the requirements of NFPA 20 (Reference 8.11).

Details to restore permanent electric power to the pump and controller are also provided in PC/M 92-107. Damaged conduits and cables will be replaced. The electric fire pump annunciation as described in Appendix 9.6A of the UFSAR is not affected.

The diesel driven fire pump, pump controller and power supplies were not damaged by Hurricane Andrew. The remote diesel fuel fill line was damaged but is not required for Unit 4 startup since a permanent diesel fuel tank containing enough fuel for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of pump operation is provided by design.

In order to support Unit 4 startup, both the electric and diesel driven fire water pumps shall be functional. Both pumps shall have the capability of being started either manually or automatically on low fire header pressure. In addition, both pumps shall have their control room alarm features functional for Unit 4 restart.

Since RWTI will not be erected in time to support Unit 4 startup, both the electric pump and diesel driven pump suction shall be aligned to RWTII. Alignment to RWTII will provide 100% fire water capacity to either pump. In addition, the electric pump recirculation piping will be temporarily routed to RWTII until erection of RWTI is completed and the

~N-PTN-HZZ-9Z -03~

Revision 0 Page 8 oS 18 appropriate piping tie-ins can be made. Both the electric and diesel driven fire pumps discharges will be aligned to the common electric fire pump discharge piping tie into the fire main. Restoration of the diesel driven fire pump discharge header into the fire main will be completed after Unit 4 restart.

Fire Water ocke Pum s The design bases for the fire water jockey pumps is for one of the pumps to run continuously to maintain pressure in the fire water header and prevent inadvertent or spurious fire pump starts. The ockey pumps also keep the ire water piping j f system solid to prevent the potential for waterhammer.

However, no credit is taken for the jockey pumps to provide fire water to the fire main. As such, the two jockey pumps should be available for Unit 4 startup in accordance with the Fire Water Supply System design. The jockey pump piping shall be restored such that both jockey pump's suction and recirculation piping are tied into RWTII. Restoration of the j ockey pump piping to RWTI will be completed af ter Unit 4 startup.

Approximately.70 feet of power cables and associated conduits for fire water jockey pumps were damaged. In order to restore permanent power to the jockey pumps, the damaged cable and conduits will be replaced. PC/M 92-107 provides the details needed to restore permanent power to the jockey design pumps prior to Unit 4 startup. provides a detail of the interim Fire Water Supply System configuration utilizing RWTII, the electric driven fire pump, the diesel driven fire pump and the jockey pumps'mna Fi As stated in Section 3.A above, an alternate source of fire water is provided by the Turkey Point cooling canals. The pumping source from the cooling canals is provided. by the Unit 3 and 4 screen wash pumps. The screen wash pumps are available, by design, to provide emergency makeup water to the Fire Water Supply System. Credit has been taken in the past for the. availability of the screen wash pumps to perform this fire water supply function (Reference 8.15). The 3 screen wash pumps are connected to a permanent backup, fire protection header that can be tied into fire main hydrant HY-13 by a 6 inch hose. This hose will be installed to support Unit 4 restart.

There are 3 screen wash pumps for Units 3 and 4 (labeled 3, 4 and S) which are normally used to clean collected debris off the intake structure traveling screens. The pumps are 1680

aJPN-PTlil- SEKT 034 Revision 0 Page 9 of 18 gpm two stage vertical centrifugal pumps and are located in the middle of the common intake structure. The pumps can be manually aligned and started to supply an alternate supply of fire water to the fire main.

In addition to the permanently installed screen additional backup fire water can be provided from wash pumps, the cooling canals to the fire main piping three temporary diesel driven pumps. Two of the temporarybydiesel pumps are variable speed Thompson Model 6J-DD-6 high pressure centrifugal jet pumps and the third is a variable speed Thompson Model 4J-DD-4 high pressure centrifugal jet pump. The three temporary diesel driven fire pumps are located by the Central Receiving Facility. The pumps are temporarily tied into the at hydrant HY-28 with a fire hose. The pumps can be fire main manually started and their discharge aligned to provide supplemental fire water to the fire main, if needed.

Attachment 2 provides a detail of the complete, interim Fire Water Supply System configuration. One fire water source consists of RWTII, the electric driven fire pump, the diesel driven fire pump and the jockey pumps. The second fire water wash pumps ..

source consists of the intake cooling canal and the screen Temporary diesel driven pumps supplement the second water source.

4. 0 COMPLIANCE WITH DESIGN BASIS REQUIREMZXTS Section III.A. of Appendix R to 10CFR50 describes the specific requirements for fire water supplies for fire suppression systems as follows:

"Two separate water supplies shall be provided to furnish necessary water volume and pressure to the fire main loop.

Each supply shall consist of a storage tank, pump, piping, and appropriate isolation and control valves. Two separate redundant suctions in one or more intake structures from a large body of water (river, lake, etc.) will satisfy the requirement for two separated water storage tanks. These supplies shall be separated so that a failure of one will not result in a failure of the other supply.

Each supply of the fire water distribution system shall be capable of providing for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> the maximum expected water demands as determined by the fire hazards analysis for safety-related areas or other areas that present a fire exposure hazard to safety-related areas."...

By design, the Appendix R requirements for fire water supplies is met at Turkey Point by the two Raw Water Storage Tanks (RWTI and RWTII). RWTII will be available to provide 100% of the required fire water capacity (300,000 gallons) to either the permanent

aTPN- PTP- SEKT 034 Revision 0 Pape 10 of 18 electric or diesel driven fire pump. Both pumps will be capable of being started either manually, or, automatically on low fire main header pressure. However, since replacement of RWTI will not be completed in time to support Unit 4 restart, an alternate source of fire water will be provided by the Turkey Point cooling canals via the screen wash pumps. The capability of these fire water systems to meet the design basis system flow requirements is evaluated below.

A previous engineering calculation (Reference 8.8) evaluated the capability of the permanent fire water pumps to meet the most limiting Appendix R flow demand. The most limiting Appendix R flow demand had been identified in the Reference 8.8 calculation as the Unit 4 Main and Auxiliary Transformer and Hydrogen Seal Oil deluge system which has a demand of 1498 gpm at 63.5 psig. An additional manual hose stream supply of 750 gpm at 65 psig from hydrant HY-8 is also considered in the total system demand. The calculation concluded that either the electric pump or the diesel driven pump are capable of delivering the Appendix R design flow requirement.

An additional calculation (Reference 8.9) has been prepared to assess the flow capability of the interim fire water supply consisting of the intake canal and the screen wash pumps. The calculation utilizes the same Fire Water Supply System hydraulic model utilized above for the permanent fire water pumps. The screen wash pump performance curve, discharge piping and temporary 6 inch hose to hydrant HY-13 have been included in the model. The calculation results conclude that two screen wash pumps are capable of meeting the flow demand of the Unit 4 Main and Auxiliary Transformer and Hydrogen Seal Oil deluge system (1498 gpm at 63.5 psig) and providing an additional manual hose stream flow of 568 gpm at hydrant HY-8.

A review of the manual hydrant hose stream requirements has been performed to determine the acceptability of the 568 gpm hose stream supply provided by the two screen wash pumps. Section 2.4 of UFSAR Appendix 9.6A provides a comparison of the Turkey Point Fire Protection Program to the guidelines of Appendix A to Branch

-Technical Position APCSB 9.5-1 (Reference 8.16). Guideline E.2(e) discusses the capacity requirements for the Fire Water Supply System. The sizing of the dedicated fire water supply for Turkey Point Units 3 and 4 is based on the largest expected suppression system demand plus an additional 750 gpm for manual hose streams.

However, more recent NRC guidance (Reference 8.18) states that "the fire water supply flow rates should be based (conservatively) on 500 gpm for manual hose streams plus the largest demand of any sprinkler or deluge system." In addition, Chapter 5 of NFPA 14 (Reference 8.17) specifies a minimum required fire hose connection supply of 500 gpm for Class I and Class III service. Therefore, it is concluded that the flow capability of two screen wash pumps to meet the combined demand of the Main and Auxiliary Transformer and Hydrogen Seal Oil deluge system plus an additional 500 gpm for manual hose streams is sufficient to meet the interim Fire Water

JPN- PZZ- SEK7 034 Revision 0 Page ZZ of 18 Supply System design requirements. Procedural recommendations will be made to limit the screen wash pump's manual hose stream flow to 500 gpm when the deluge systems are activated.

The power supply for the screen wash pumps has also been evaluated to assure a reliable source of alternate fire water exists. The Screen Wash Pumps are powered from MCC 3E and MCC 4E which are part of the non-safety related C-Bus auxiliary power system. MCC 3E and MCC 4E are assured a reasonably secure power path since both normal and alternate power path alignments are available at the 480V Motor Control Center, 480V Load Center and 4KV Switchgear levels.

Normally, offsite power is supplied to 4KV 3C and 4C busses by C Bus transformer 3X21 and 4X21 respectively. However, the output of either C Bus transformer is capable of supplying both 3C and 4C loads simultaneously through the transformer's dual secondary windings. In the event of a loss o'f offsite power, the Cranking Diesel Generators are available to directly supply Unit 3 and 4 C Bus 4KV Switchgear. Therefore, the screen wash are expected to be available for Appendix R loss of offsitepumps power scenarios.

Additionally, loss of the power supply to the screen wash pumps does not affect the operation of the permanent diesel driven fire pump or the electric fire pump.

Condition Report 92-0122 (Reference 8.19) has identified situation in which 4F Load Center breaker 41406 (MCC 4E feeder)a trips when MCC 3E is powered from MCC 4E and two screen wash pumps are simultaneously started. The cause of this problem has been linked to the trip setting of circuit breaker 41406. Minor Engineering Package PC/M 92-123 (Reference 8.20) establishes the circuit breaker setting for Load Center 3F and 4F incoming breaker from the load center transformers and Load Center 3F and 4F feeder breakers to Motor Control Centers F and 4E, respectively. PC/M 92-123'ust be implemented prior to Unit restart in order to assure all of the power paths discussed above4 are available.

As stated above, additional fire water will be provided from the cooling canals to the fire supply system piping by three temporary diesel driven pumps. However, credit is not taken for these temporary diesel driven pumps in the screen wash pump fire protection flow analysis. These pumps simply provide an additional level of defense in depth and a diverse fire water supply to the fire main, but are not required by design.

The above discussion provides the basis that the interim Fire Water Supply System configuration satisfies the intent of Appendix R with respect to separate fire water supplies and provides sufficient protection against fire hazards. In addition, the NRC previously granted FPL an extension from the schedular requirements of Appendix R to utilize only RWTI with the electric driven fire pump and the intake canal with the screen wash pumps as the separate sources of fire water until the second RWT and diesel driven pump were designed and implemented (Reference 8.15). This extension was granted from the period of November 19, 1981 until December 31;

JPN-PTF-SZKT 034 Revision 0 Page 12 oS 18 1984. Therefore, a precedent to utilize the screen wash pumps as an interim source of fire water supply has been established.

5.0 EFFECT'ON TECHNICAL SPECIFICATIONS Operability requirements associated with the Turkey Point Units 3 and 4 Fire Water Supply and Distribution System are provided in Section 3/4.7.8 of the Turkey Point Technical Specifications (Reference 8. 7) . The Technical Specification for Operation (LCO) 3.7.8.1 requires at least Limiting Condition two operable fire pumps, two separate water supplies and an operable fire water distribution system during all modes of plant operation.

In accordance with ACTION a. of LCO 3.7.8.1, if one pump and/or one normal water supply (RWTI or RWTII) is inoperable, the inoperable equipment must be restored to operable status within 7 days or an alternate backup pump or supply must be provided. Operation with a backup pump or supply is permitted for an unlimited period of time. Based on the discussion provided within this safety evaluation, the intake canal water source via the screen wash pumps satisfies the requirements for a backup fire water supply.

Additional temporary diesel driven pumps provide defense in depth and are also available to provide water to the fire main.

Therefore, the ACTION Statement requirements are met and startup of Unit 4 can proceed. However, restoration of the Fire Water Supply System in accordance with the Technical Specification LCO requirements shall be accomplished in a timely manner.

ln addition, Technical Specification LCO 3.0.4 states that entry into an OPERATIONAL MODE or specified condition may be made in accordance with ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This LCO is consistent with the NRC's position as discussed in NRC Generic Letter 87-09, "Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements",

dated June 4, 1987 (Reference 8.21).

With regards to surveillance requirements, Section 7.0 of this safety evaluation provides recommended interim surveillance requirements for the screen wash pumps and temporary diesel driven pumps in order to assure their reliable operation. In addition, the permanent Fire Water Supply System shall meet the appropriate surveillance requirements provided'n 4.7. 8.1. 1, 4. 7. 8.1.2 and 4.7.8.1.3 of the Technical Specifications.

6' DIG&lVIEWED SAFETY QUESTION DETERMINATION In accordance with 10CFR50.59, a proposed change, test, or experiment shall be deemed to involve an unreviewed safety question: (i) if the probability of occurrence or the consequence of an accident or malfunction of equipment important to safety previously evaluated in the safety

JPN-P2P-Sgg-92-03'evision 0

Page 13 of 18 analysis report (SAR) may be increased; or (ii) if the possibility or an accident or malfunction of a different type other than any evaluated previously in the safety analysis report may be created; or (iii) Zf the margin of safety as defined in the basis for any Technical Specification is reduced.

DOES THE PROPOSED ACTIVITY INCREASE THE PROBABILITY OF OCCURRENCE OF AN ACCIDENT PREVIOUSLY EVALUATED IN THE SAFETY ANALYSIS REPORT?

The Fire Water Supply System as described in the UFSAR does not in itself initiate design basis accidents and will function as designed anyin the event of a fire. In addition, the interim Fire Water Supply System does not increase the probability of occurrence of a fire since the system is not a fire initiator. Therefore, the probability of occurrence of an accident previously evaluated in the SAR is not increased.

2. DOES THE PROPOSED ACTIVITY INCREASE THE CONSEQUENCES OF AN ACCIDENT PREVIOUSLY EVALUATED IN THE SAFETY ANALYSIS REPORT?

As discussed in this safety evaluation, the interim Fire Water Supply System utilizing RWTII with the permanent electric and diesel driven fire pumps and the intake canal with the screen wash pumps is capable of delivering the required fire water flow. The interim system remains capable of mitigating the effects of a fire. Therefore, the consequences of an accident previously evaluated in the SAR is not increased.

3. DOES THE PROPOSED ACTIVITY INCREASE THE PROBABILITY OF OCCURRENCE OF A MALFUNCTION OF EQUIPMENT IMPORTANT TO SAFETY PREVIOUSLY EVALUATED IN THE SAFETY ANALYSIS REPORT?

The Fire Water Supply System is designed to protect equipment needed to safely shut down the plant and minimize the risk of a radiological release to the environment should a fire occur. Since the interim Fire Water Supply System remains capable of delivering the required fire water flow, the probability of occurrence of a malfunction of equipment important to safety previously evaluated in the SAR is not increased.

4, DOES THE PROPOSED ACTIVITY INCREASE THE CONSEQUENCES OF A MALFUNCTION OF EQUIPMENT IMPORTANT TO SAFETY PREVIOUSLY EVALUATED IN THE SAFETY ANALYSIS REPORT?

The Fire Water Supply System is designed to protect equipment needed to safely shut down the plant and

aTPN-PTF- SZKT 034 Revision 0 Page 14 of 18 minimize the risk of a radiological release to the environment should a fire occur. Since the interim Fire Water Supply System remains capable of delivering the required fire water flow, the consequences of a malfunction of equipment important to safety previously evaluated in the SAR is not increased.

5. DOES THE PROPOSED ACTIVITY CREATE THE POSSIBILITY OF AN ACCIDENT OF A DIFFERENT TYPE THAN ANY PREVIOUSLY EVALUATED IN THE SAFETY ANALYSIS REPORT?

The Fire Water Supply System as described in the UFSAR does not in itself initiate any design basis accidents.

Also, the system is designed to mitigate design basis fires such that the plant can be safely shut down in the event of a fire. The interim fire water supply system remains capable of providing the required fire water flow. Therefore, the probability of occurrence of an accident of a different type than previously evaluated in the SAR is not increased.

6. DOES THE PROPOSED ACTIVITY CREATE THE POSSIBILITY OF A MALFUNCTION OF EQUIPMENT IMPORTANT TO SAFETY OF A DIFFERENT TYPE OTHER THAN ANY PREVIOUSLY EVALUATED IN THE SAR?

The fire water supply system is designed to protect equipment needed to safely shut down the plant and minimize the risk of a radiological release to the environment should a fire occur. Since the interim fire water supply system remains capable providing the required fire water flow, the probability of occurrence of a malfunction of equipment important to safety of a different type than previously evaluated in the SAR is not increased.

7. DOES THE PROPOSED ACTIVITYREDUCE THE MARGIN OF SAFETY AS DEFINED IN THE BASIS FOR ANY TECHNICAL SPECIFICATION?

The operability of the Fire Water Supply System ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where equipment required to safely shut down the plant is located. Since the interim fire water supply system consisting of RWTII with both the permanent electric and diesel driven fire pumps and the intake canal with the screen wash pumps is capable of providing two separate sources of fire water that deliver the required fire water flow, the margin of safety as specified in the bases for any'Technical Specification is not reduced.

CONCLUSION

II JPN- PTN- SEKJ 034 Revision 0 Page 15 of 18 Based on the answers to the above questions, the interim configuration for the Fire Water Supply System does not impact safe operation of the plant, does not constitute an unreviewed safety question and does not require a change to the Technical Specifications. Therefore, the Turkey Point Unit 4 can be operated in any mode while in this interim configuration without prior NRC approval.

7.0 ACTIONS REQUIRED In order to assure that the interim Fire Water Supply System provides a reliable source of fire water to the Turkey Point Units 3 and 4 fire main, the following actions shall be taken prior to restart of Unit 4.

7.1 Implementation of PC/M 92-107 Those portions of PC/M 92-107 needed to restore the following portions of the Fire Water Supply System shall be implemented.

Diesel driven fire pump w/ manual and autostart capability Electric driven fire pump w/ manual and autostart capability Two jockey pumps Permanent power to electric and jockey pumps All appropriate pump tie-ins pump to RWTII One fire water header to fire loop (electric pump header)

Control room annunciation for fire pumps Testing in accordance with PC/M requirements shall be performed for the above components 7.2 Implementation of PC/M 92-106 Those portions of capability to PC/M 92-106 needed RWTII, as to restore manual detailed below, shall be implemented.

fill County water supply line hardpiped Manual RWTII No fill capability with LCV-501A bypass instrumentation or controls required line 7.3 Implementation of PC/M 92-123 This'EP establishes the circuit breaker setting for the Load Center 3F and 4F incoming breaker from the load center transformers and Load Center 3F and 4F feeder breakers to Motor Control Centers F and 4E, respectively. This modification provides proper circuit breaker coordination.

7.4 The appropriate plant procedures shall be prepared or revised, as necessary, to reflect operation of the interim Fire Water Supply System as detailed in this safety evaluation. This includes the operation of the permanent electric and diesel driven fire pumps from RWTI and the screen wash and temporary

ZPN- PZÃ- SZK7 034 Revxsxoa 0 Pape 16 of 28 diesel driven pumps. The screen wash pump hose to hydrant HY-13 and the temporary diesel driven pumps suction hoses to the cooling canals and discharge hose to hydrant HY-28 shall be installed. Screen wash pump manual hose streams limited to 500 gpm when deluge systems are activated.shall be RWTII level shall be monitored locally by plant operators in accordance with existing plant procedures and tank be performed manually, as needed.

fill shall 7.5 The appropriate surveillance procedures should be developed to assure a reliable source of alternate fire water exists.

Surveillance requirements, similar to those specified in the Technical Specifications for the Fire Water Supply System, should be established for the screen wash pumps and the temporary diesel driven pumps. As a minimum, surveillance requirements for initial and periodic operation of the screen wash pumps and temporary diesel pumps shall be developed.

Pump start and proper pump operation shall be verified. In addition, verification of temporary diesel pump fuel availability and temporary diesel pump battery system operation shall be considered.

The screen wash pumps and temporary diesel driven pumps are not required to meet the permanent electric and diesel driven fire pump flow requirements specified in Technical Specification Surveillance Requirement 4.7.8.1.1.f.2. These flow requirements are specific to the permanent electric and diesel driven fire pump performance curve and are intended to detect degradation of these specific pumps.

8. 0 REFERENCES 8.1 PC/M 92-102, Rev. 0, Replacement of Raw Water Storage Tank I (T63A) 8.2 PC/M 92-105, Rev. 0, RWT1 County Water Supply Restoration 8.3 PC/M 92-106, Rev. 0, RWT2 County Water Supply Restoration 8.4 PC/M 92-107, Rev. 0, Fire Protection System Restoration-Hurricane Andrew 8.5 PC/M 92-108, Rev. 0, Raw Water and Service Water Systems Restoration 8.6 Updated Final Safety Analysis Report, (UFSAR), Revision 10, dated July 1992
8. 7 Turkey Point Unit 3 and 4 Technical Specif ication, Amendments 152/147 effective August 20, 1992

JPN-PZF-SZKT-92-034 Revision 0 Page 17 of 18 8.8 FPL calculation PTN-BUM-91-052, Rev. 0, "Fire Protection System Pipe Flow Analysis" 8.9 FPL calculation PTN-BFJM-92-032, Rev. 0, ,"Backup Fire Protection System Pipe Flow Analysis Using Screen Wash Pumps" 8.10 NFPA 24, "Standard for the Installation of Private Fire Service Mains and Their Appurtenances", 1992 Edition 8.11 NFPA 20, "Standard for the Installation of Centrifugal Fire Pumps", 1990 Edition

8. 12 Turkey Point Nuclear Plant Surveillance Procedure 0-OSP-016.1, "Electric Driven Fire Pump Annual Surveillance Test", latest revision 8.13 Turkey Point Nuclear Plant Surveillance Procedure 0-OSP-016.26, "Electric Driven Fire Pump Operability Test",

latest revision

8. 14 Turkey Point Nuclear Plant Procedure O-ONOP-016.7, "Screen Wash Emergency Makeup to the Fire Protection System", -latest revision 8.15 NRC letter to FPL, "Schedular Exemption Request - Fire Protection Section III.Ato 10 CFR 50, Turkey Point Plant Units 3 and 4", dated March 21, 1984 8.16 Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976, dated August 23, 1976 8.17 NFPA 14, "Standard for the Installation of Standpipe and Hose Systems, 1990 Edition 8.18 NUREG-0800, Standard Review Plan, 9.5.1 Fire Protection Program, Rev. 3, dated July 1981 8.19 Turkey Point Nuclear Condition Report 592-0122, approved July 28, 1992 8.20 PC/M 92-123, Rev. 0, "Load Center 3F/4F Circuit Breaker Settings 8.21 NRC Generic Letter 87-09, "Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements", dated June 4, 1987 9.0 ATTACHMENTS Interim Configuration Fire Protection System Tanks and

a7PN- PZV- SEKT 034 Revision 0 Page 18 of 18 Pumps (1 page) 2 Interim Raw Water/Fire Protection System (1 page)

fP SBCF IO tgtot

--~ mlSRR IVI'%17-I5 tttt2a Ila OOAq CiTOL 751 ISSIL CONINIIIR U5 Cl LC. I Q I

~ICL IT-O72 tl~ IC IOS tll O

ln Pcl-1116 I

507

~ RSIL FIR'P 7TEOS I

FOIL 5IOAtCC OC I Nl A )n gg- 757 L

IL755'I I.C, 775 771 LO- DIESEL CITCR tl P-Ql AlE PP. IOS Attto SUIO ORSIL g)tit FRL 22 IT 15 tSO )-'IOI 7IO 777 CKI otti IZ LO.

p go.

FIRE RAW WATER TAIIIC W IR.

o g IoCI<ET PP'S gQmtCI Ilttl 52CNCE OIICI ISO.CN CAILOI6 CIPACtf I o IO.

L Nl I

lof ~ 5ISSN PTtDI At 12'-I IO IKSIW A INCNN COLORS fCR Iftt Of'55+Jt I,h7 I P25g to5

~hettttRttl at

( I ul

<o

'C.

)t~ IR55 O" IOtt2 121 g> (

I NO QLCIBE IP.

NIOCCIIR lI I It - ICit-5OIA P-55 IX 'al No 885 I Sf/f1 It PSle f1 1511 CO UL I

I I

SON I 757

> m I L.. LO. LC.

UL I CIS LC. I Ctt C77 I 751 751 I La ELECTRIC TIRE PUSIP CO CPO Ittt RXFR COPIES 75~4 I

INN IMIIIOAK OIXR LC. I Ott SCWk MIteett I

IO IMIS 1 k 2 7-t~ IO725ILI

~~ -~Lt-n

~

7 S-O I

5 "gq./IO CIH gt-t/an Stu INR IIOIS > ~ 4 t E.pe gfibiks s i ~" "g ht-25 TURICET POINT PLANt UIRtS I THRU 4 tolls JPN-PTN-SELIJ-92-054 CIIIIORtetIL 1OL%

OINMC 6

~

1. lNS TRC&C OMX httSIRIS OR 5%7% FW TO%II SISKIN 5PS IICF TIRF 5 OK hAIR.

FOR IOISOTOCSI Ottt, INTERIM CONFIGURATION FIRE PROTECTION SYSTEM ATTACHMENT ORS TANKS 8r, PUMPS ro P OtOOO12DTO

INTERIlllBAN NATERIFIRE PROTECTION SYSTEIN EMPOHlel OIEBEL PUMPS P)

TEMPORARY BACKUP JOCKEY PNI 8 SYSTEINS

DISTRIBUTION:

, Docket File w/o enclosure PD22 Reading File July 24, 1992 DMiller RAuluck DOCKET NO($ ). 250 and,50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT UNITS 3'AND 4'LORIDA PONER Br, LIGHT COMPANY; The following documents concerning our, review of the subject facility are transmitted. for your information.

DESCRIPTION OF DOCUMENT . DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of. Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment" Involvin No Si nihcant Hazards Conditions Exemption Notice of Consideration of Issuance of Facility Operating License or. Amendment to Facility Operating License.

Biweekly Notice; Applications and Amendments to Operating Licenses ' -

p

.. See'Page(s)

Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for June " transmitted. by Letter 06/30/92 Annual/Semi-Annual Report:

transmitted by Letter .

,Other Division of Reactor Projects Office of Nuclear Reactor Regulation I II

Enclosures:

As Stated cc: See next page ~

OFFiCEW SURNAME>

OATEN NRC FORM 318 tto/80) NRCM 0240 OFFICIAL RECORD COPY

~ Ct I'

July 24, 1992 l DISTRIBUTION:

Docket File w/o enclosure PD22 Reading File DMiller RAuluck DOCKET NO(S). 50-250 and 50-251 SEE ATTACHED LIST

SUBJECT:

'URKEY POINT PLANT UNITS 5 AND, 4: FLORIDA POWER & LIGHT COMPANY The following documents. concerning our review of the subject facility are transmitted for your information.'ESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement

.."'afety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses No Si nificant Hazards Conditions,. -

., See S p Pagefsj

( },.'nvolvin Exemption Construction Permit No. CPPR- ~

Amendment-No Facility Operating License No. ,Amendment No. "

Order Monthly Operating Report for transmitted by Letter 04/$ 0/92 Annual/Semi. Annual Report:

transmitted by Letter Other Division of Reactor Pro)acts - I II Office of Nuclear Reactor Regulation

Enclosures:

As Stated cc: See next page OFFICE& L D2-SURNAMEt D OATEN

..07!8 92 NRC FORM 318 tto/801 NRCM 0240 OFFICIAL RECORD COPY

~ ~

DISTRIBUTION:

Docket File w/o enclosure PD22 Reading File July 24, 1992 DMiller RAuluck DOCKET NO(S). 50-250 and 50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNITS 3 AND 4: ZIORIDA POSER & LIGHT COHPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment

)I Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter O5/51/92 Annual/Semi-Annual Report:

transmitted by Letter Other fvis)p,of peactgr ppog ects - I/II

Enclosures:

As Stated See next page OFFICES SURNAME>

DATE>

..Q7Lf. /92 NRC FORM 318 tto/aoi NRCM 0240 OFFICIAL RECORD COPY

I ~

I l t, J P~ ~ l I 4

pM J'

'h I

DISTRIBUTION:

, Docket File M)o enclosure ~

PDII-2 RDG File DMiller Hay 8, 1992 LRaghavan DOCKET NO{S)50-25O ancl 50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNITS 5 AND 4s Ff ORIDA POWER AIG) LIGHT COIIPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating Ucense or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter Annual/Semi-Annual Report 1 1 Annual Radiolo ical Environ 0 eratin Re t. 04I28l92 transmitted by Letter Other

%tee'0'f'ILcPear 4No8eguQ'0'n~""s

Enclosures:

As Stated See next page C4 J OFFICE>

SURNAME~

DJ\E ~

'r t

Pgipl9P 2

NRC FORM 31e I to/aoi NRCM 0240 OFFICIAL RECORD COPY

i~ ~

~ ~ C I P ~ k gs t~

4 P I

~ 1 ), r

  • DISTRIBUTION:

<Docket File w(o enclosure, I ay 8, 1992 PDIX-2 RDG File DMiller LRaghavan DOCKFT NO($ j 50-250, ~d 50-251 SEE ATTACHED LIST SUBJECT; TURKEY POINT PLANT, UNITS 5 AND 4: FLORXDA POlIER AND LIGHT COMPANY The following documents c'oncerning our review of the subject facility:are transmitted'for,your information. '.

DESCRIPTION OF DOCUMENT ~  :

Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact 'DATED'xemption of Issuance of Environmental Assessment 'otice Involvin No Si nifleant Hazards Conditions '.

Notice of Consideration of Issuance of Facility Operating License or, Amendment to Facility, Operating License Biweekly Notice; Applications and Amendments to Operating Licenses

('j.

See Page(sj S

,Construction Permit No. CPPR- , Amendment.No..

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for November '1991 transmitted by Letter. 12) "3 [91

. Annual/Semi-Annual Report:

transmitted byletter Other xv s2.on o eac or rogec s-Office of Nuclear Reactor Regulation ~

Enclosures:

As Stated cc: See next page OFFICE&

'PD22 SURNAME>

OATEN "05 "92" NRC FORM 318 t10/ NRCM 0240 OFFICIAL RECORD COPY qA pC+)g

L 1

lf A II

DISTRIBUTION:

tDocket File w)o enclosure PDII-2 RDG File Hay 8, 1992 DMiller LRaghavan DOCKET NO(S)., 50-'250'nd 50>>251 SEE ATTACHED LIST

SUBJECT:

. TURKEY POINT PLANT~ UNITS 3 AND 4: FLORIDA PONER AND LIGHT COMPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

'n Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment-Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License. i ~

Biweekly Notice; Applications and Amendments to Operating-Licenses

.Involvin No Si nifIcant Hazards Conditions

'ee S p, Page(s)'xemption Construction Permit No. CPPR- , Amendment No:

Facility Operating License No. Amendment. No.

Order Monthly Operating Report for transmitted by Letter Semiannual Radioactive Effluent Release Rept, Annual/Semi-Annual Report:

Jul-Dec 1991 transmitted by, Letter, Other V2.83.0 Office of Nuclear Reactor Regulation

Enclosures:

As Stated

. See next page OFFICE> D22 SURNAME%

OATEN NRG F0RM 318 110/aOI NRCM 0240 OFFICIAL RECORD COPY

'k

'\

P

'l

Docket File w)o File enclosure'DII-2 RDG Hay 6, 1992 DMiller LRaghavan DOCKET NO(S). 50-250 and 50-251 SEE ATTACEHD LIST L

SUBJECT:

TURKEY POINT PLANTy UNITS 3 AND 4: FLORIDA POHER AND LIGHT CONPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement r

I>>

h Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter 04l15 l92 Annual/Semi-Annual Report:

transmitted by Letter Other QfYILWf%cRfrN%SPNtlg)NIects IIII

Enclosures:

As Stated See next page OFFICES h

SURNAME>

DATE>

NRC FORM 318 I to/80) NRCM 0240 OFFICIAL RECORD COPY

I

P r

-(4 w

s ~

r

'i

'\ ~

! IP <<~ ~

N f

March 31, 1992 DOCKET NO{S). 50-250 and 50-251 DISTRIBUTION wio enclosUre:

Docket File)

SEE ATTACHED LIST PDII-2 RDG D. Miller L. Raghavan (Acting)

SUBJECT:

TURKEY POINT UNITS 3 AND 4 The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice'of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifrcant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating Ucense No. ,Amendment No.

Order Monthly Operating Report for Febrtt~ 1992 transmitted by Letter 03112l92 Annual/Semi. Annual Report:

transmitted by Letter Other v s on o eac or Office of Nuclear Reactor Regulation opec s-

Enclosures:

As Stated cc: See next page OFFICE&

LA d-2

>,<'URNAME~ D lr OATE>

0> i5.ii.s2.

NRc FoRM 318 (to/801 NRCM 0240 OFFICIAL RECORD COPY

March 5, 1992 i DISTRIBUTION:

Docket Fi.le wi.o enclosure PD22 READING DMIller RAuluck DOCKET NO(S). 50-250 anC 50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNTTS 3 AND 4: FLORIDA POHER JQtD LIGHT COMPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nif<cant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. Amendment No.

Order h Monthly Operating Report tor transmitted by Letter 2)14 92 Annual/Semi-Annual Report:

transmitted by Letter Other Dwarfs)p iof peaoerrr ppogeoes f IIX

Enclosures:

As Stated cc: See next page OFFICE&

SURNAME>

DATE>

NRC FORM 318

~ 03'.

ttol

'i'"

0] NRCM 0240 OFFtCIAL RECORD COPY

~ ~

<<j,, ~

DISTRIBUTION:

Docket File w/o enclosure PD22 RDG v DMi1 1 er February 5. )992 R. Auluck DOCKET NO(SI.

SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNITS 3 AND 4, VLORIDA POWER AND LIGHT COMMNY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Condi ions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for December 1991 transmitted by Letter 1/15 92 Annual/Semi-Annual Report:

transmitted by Letter Other Office of Nuclear Reactor Regulation

Enclosures:

As Stated See next page OFFICE>> J, SURNAME> D e oATE ~

NRC FORM 3ta (to/80) NRCM 0240 OFFICIAL RECORD COPY

'L I 0 t

'I v 4 j \ ~

'a

DISTRIBUTION:

'ocket Pile wio enclosure December 4, 1991 PD22 RDG DHiller RAuluck DOCKET NO(S). 50-250'0-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNITS 3 AND 4, FLORIDA POMER AND LIGHT COMPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter 11 15 91.

Annual/Semi-Annual Report:

transmitted by Letter Other IPiyision oS Reaotor Prospects I(Ice of Nuclear Reactor Regulation I/II

Enclosures:

As Stated cc: See next page OFFICE> P SURNAMES 0ATEK NRC FORM 318 I to/80) NRCM 0240 OFFICIAL RECORD COPY

4 h I g' I

"I

~ ~ g 4 p ~

4 ~-

DISTRIBUTION

,Docket File w/o enclosure November 12, 1991 PD22 RDG DMiller RAuluck h

DOCKET NO(S).

5P 25O 5g 25 r

j iF

.j SEE ATTACHED LIST 0>>

TURKEY POINT PLANT, UNITS 3 AND 4, FLORIDA PONER AND LIGHT CONPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUNIENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- Amendment No.

~.

Facility Operating License No. ,Amendment No.

Order

)+V' Monthly Operating Report for Se ember 1 1 transmitted by Letter 1O/1/t/91 Annual/Semi. Annual Report:

transmitted by Letter Other

Enclosures:

As Stated cc: See next page OFFICE> 2....

SURIIAME>

DATE ~

qq /Q/gq NRC FORM 318 110/801 NRCM 0240 OFFICIAL RECORD COPY

1 t, a k

I ~

n

'C I

4 4

I

'2 3 DISTRIBUTION Tr/o enclosures DOCKET NO(g. gO 2gO / gO 2y1 Docket, File PDII-2 Rdg DMiller

SUBJECT:

Turkey Point Plant, Units 3 and 4, Florida PoMer and Light Co.

The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement T Notice of Availability of Draft/Final Environmental Statement

'I Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment A

1 Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- Amendment No.

Facility Operating License No. Amendment No.

Order Monthly Operating Report for transmitted by Letter Annual/Semi-Annual Report:

transmitted by Letter Other Office of Nuclear Reactor Regulation

Enclosures:

As Stated See Next Page OFFICE> LA:PD22....

.".p SURNAME>

WZ Q'II OATEN NRC FORM 318 (to/80) NRCM 0240 OFFICIAL RECORD COPY

l

'\ ~

~ c

~,8 ~:gj

~

~ c '0 ~

c r

~ W

)

I

ATTACHMENT Semiannual Radioactive Effluent Release Report for Jan. June 1991 Monthly Operating Reports for July 1991

Turkey Point 3 and 4 cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Dr. William Cunningham FDA Research Chemist National Institute of Standards and Technology Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

Q DISTRIBUTION

/

PD22 RF July 24, 1991 DMi1ler RAu1uck DOCKET NO(S). 5O-250, 50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNIT 3N, FLORIDA POWER AND LIGHT The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. Amendment No.

Order Monthly Operating Report for transmitted by Letter 6 17/91 Annual/Semi-Annual Report:

transmitted by Letter Other

Enclosures:

As Stated See next page OFFICEi SURNAME>

OATEN

..? /91 NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY

0 0

~ I I

wy '

Eg

~

l$ ~t 4

4 ) I H

DISTRIBUTION Doc et-Fi- e-w/o-encl~

PD22 RF July 23, 1991 DMiller RAuluck DOCKET NO(S). 50-250, 50-251 SEE ATTACHED LIST

SUBJECT:

TURKEY POINT PLANT, UNIT 3 8t 4, FLORIDA POWER AND LIGHT COMPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED

.r Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement

'l Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifrcant Hazards Conditions See Page(s)

Exemption ll Construction Permit No. CPPR- , Amendment No.

Facility Operating Ucense No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter 7/9/91 I+

rt Annual/Semi-Annual Report:

transmitted by Letter Other fIP I RRe/cÃt IP~DJects - I/II L

Enclosures:

As Stated cc: See next page OFFICE>

SURNAME>

DATE>

P~.

NRC FORM 318 (1 /80) NRCM 0240 OFFICIAL RECORD COPY

V

\

l A' g

4 P)

'I

I

~t,,i DISTR PD22 RF BUTION

/,, h, '-.

July 23, 1991 DMiller RRN)(,kk@

RAuluck DOCKET NO(S). 50-250 $ 50-251 SEE ATTACHED. LIST

SUBJECT:

TURKEY POINT PLANT, UNIT 3M, FLORIDA POMER AND LIGHT COMPANY The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- Amendment No.

Facility Operating License No. ,Amendment No.

Order X Monthly Operating Report tor transmittedby Letter 5 9 91 Annual/Semi-Annual Report:

transmitted by Letter Other Dfytst/hEh Ihf IIeactLr Italo)ects - I/II

Enclosures:

As Stated cc: See next page OFFICE>

SURNAME ~

OATEe NRC FORM 318 I10/aol NRCM 0240 OFFICIAL RECORD COPY

e t*

p t t

t

~

~

~

0 DISTRIBUTION w/o encl .

Docket Fil e PD22 Rdg July 10, 1991 DI/Ii1 l,et.

DOCKET NO(SI 5O-250-OLA-5 50-25$ -OLA-5 SEE ATTACHED LIST

  • 6

SUBJECT:

FLORIDA POWER AND LIGHT COMPANY - TURKEY POINT UNITS 3 AND 4 The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s) h Exemption Construction Permit No. CPPR- Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by Letter Annual/Semi-Annual Report:

transmitted by Letter XX other Decision Office of Nuclear Reactor Regulation

Enclosures:

As Stated See next page OFacei L ~ 22 l n ~

SURNAME> U DATE 7//g/9$

Ira4 NRC FORM 318 (to/80) NRCM 0240 OFFICIAL RECORD COPY

l ~ A I 0

1

, ~ 1ir

~

g l

C' ~ V J 1<< ,1r t

(

h

r4 Nay 8, 1991 DISTRISUTION.

QUockec-F-i.l e'~

PD22 Rdg File DOCKET NOIS) 50-335 s 50-389 Dt1il 1 er and '50-250>and 50-251 JNorris RAuluck See attached list

SUBJECT:

FLORIDA POWER 5 LIGHT GOji)PANY - ST. LUCIE, UNITS 1 AND 2 - TURKEY POINT UNITS 3 8t 4 The fo)lowing documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. ,Amendment No.

Order Monthly Operating Report for transmitted by LefteS Annual/Semi-Annual Report: 4/17/91 Tur e - Radiolo ical Environ 0 er Re t. transmitted by Letter 4/30/91 Other Office of Nuclear Reactor Regulation

Enclosures:

As Stated cc: See next page OFFICE> L :P -2 SURNAME> D e 0ATEN o5 71 NRC FORM 31a (10/80] NRCM 0240 OFFICIAL RECORD COPY

'I II I'

~ \ ~

p

Apr il ll, 1991 DOCKET NO(S). 50250'0 251'0 2BOs 50 291 DISTR I BUT ION 50-302, 50-335, 50-338, 50-339, Docket File w/o encl.

50-389 PD22 Rdg File DMiller LEngle BBuckley SEE ATTACHED LIST RAuluck HSilver JNorris SUBJECT VIRGINIA ELECTRIC 8I POWER COMPANY-NORTH ANNA UNITS 1 AND 2 - SURRY UNITS 1 AND 2, FLORIDA POHER CORPORATION - CRYSTAL RIVER 3, FLORIDA P01lER AND LIGHT COMPANY-ST. LUCIE UNITS 1 AND 2, TURKEY POINT UNITS 3 AND 4 The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.

Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)

Exemption Construction Permit No. CPPR- , Amendment No.

Facility Operating License No. Amendment No.

Order Monthly Operating Report for transmitted by Letter Annual/Semi. Annual Report:

transmitted by Letter X Other plyisiTIn of Reac)or Projects - I/II

Enclosures:

As Stated cc: Spe next page OFFICE> LA'-2 SURNAMEn. DM DATE Q4/ I/(gi NRC FORM 318 110/80) NRCM 0240 OFFICIAL RECORD COPY

S 1 ~ ~

1

~ 1 1

Crystal River Unit 3 North Anna 1/2 Surry 1/2 St. Lucie 1/2 Turkey Point 3/4 cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U. S. Department of the Interior Washington, DC 20240 Dr. William Cunningham FDA Research Chemist National Institute of Standards and'echnology Reactor Building 235, Room 8-108 Gaithersburg, ND 20899 Regional Radiation Representative EPA Region IV 345 Courtland Street, NE Atlanta, GA 30365 U.S. Environmental Protection Agency Region III Office ATTN: Regional Radiation Representative 841 Chestnut Street Philadelphia, PA 19107

LIST OF ATTACHED ENCLOSURES Monthly Operating Report for Dec. 1990-St. Lucie, Turkey Point, North Anna, Surry

2. Monthly Operating Report for Jan. 1991-St. Lucie, Turkey Point, North Anna, Surry, Crystal R>ver
3. Monthly Operating Report for Feb. 1991-Surry, North Ann, Turkey Point, St. Lucie
4. "Combined Semiannual Radioactive Effluent Release Rept for Period Jul-Dec 1990."- - St. Lucie
5. "Semiannual Radioactive Effluent Release Rept Jul-Dec 1990."

Turkey Point

6. "Semiannual Radioactive Effluent Release Rept for Jul-Dec 1990."

Crystal River

7. "Semiannual Radioactive Effluent Release Rept for Jul-Dec 1990."

Surry

8. "Radioactive Effluent Release Rept, North Anna Power Station, Jul-Dec 1990."

March 21, 1991 Docket Nos. 50-250, 50-251 DISTRIBUTION 50-335 and 50-389 NRC 8 Local PDR DMi 1 1er Harold F. Reis, Esq.

Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, D.C. 20036

Dear Mr. Reis:

SUBJECT:

UPDATING THE MAILING LIST FOR THE TURKEY POINT PLANT, UNITS 3 AND 4, AND ST. LUG IE, UNITS I AND 2 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Turkey Point Plant, Units 3 and 4, and St. Lucie, Units 1 and 2. We currently have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Miller, Licensing Assistant Project Directorate II-2, NRR MS 14H22 U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

Sincerely,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC  : LA:PD2 NAME W W 0 DATE: /ryg91 P

Document Name: CC LIST LETTERS gag PgK CQSKR CGPlf

IP il I I rr I

f g II 4

e E

II II

'f I

r 4e'

March 21, 1991 Docket Nos. 50-250 DISTRIBUTION and 50-251 NRC 5 Local PDR DNiller John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, i F 1 or da 33131-2398

Dear Hr. Butler:

SUBJECT:

UPDATING THE NAILING LIST FOR THE TURKEY POINT PLANT, UNITS 3 AND 4 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Turkey Point Plant, Units 3 and 4. We currently have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Hiller, Licensing Assistant Project Directorate II-2, NRR MS 14H22 U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

Sincerely,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects. - I/II Office of Nuclear Reactor Regulation NAME  : D DATE: / 91 CIAL R C R C P Document Name: CC LIST LETTERS

~ r

'I t-

~ r

March 21, 1991 Docket Nos. 50-250, 50-251 DISTRIBUTION 50-335 and 50-389 NRC 5 Local PDR DMiller Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304

Dear Mr. Shreve:

SUBJECT:

UPDATING THE MAILING LIST FOR THE TURKEY POINT PLANT, UNITS 3 AND 4, AND ST. LUCIE, UNITS I AND 2 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Turkey Point Plant, Units 3 and 4, and St. Lucie, Units I and 2. We currently have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Miller, Licensing Assistant Project Directorate II-2, NRR MS 14H22 U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

S incerely,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC :PD22 NAME DATE: +/g,l/91 C

Document Name: CC LIST LETTERS

March 21, 199 Docket Nos. 50-302, (50:-250~ DISTRIBUTION 50-251, 50-335,

'and 50-389 NRC 5 Local PDR DMi lier Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 To Whom It May Concern:

SUBJECT:

UPDATING THE MAILING LIST FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, TURKEY POINT UNITS 3 AND 4, AND ST. LUCIE, UNITS I AND 2 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Crystal River Unit 3 Nuclear Generating Plant, Turkey Point, Units 3 and 4, and St. Lucie, Units 1 and 2. We currently 'have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Miller, Licensing Assistant Project Directorate II-2, NRR MS 14H22 U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

Sincerely,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation C D2 NAME BATE: $ g (/91 FICIAL R C RD C P Document Name: CC LIST LETTERS

1 H' March 21, 199 Docket Nos. 50-250 DISTRIBUTION and 50-251 NRC 8 Local PDR Dpi 1 1er Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Flor ida 32301 To Whom It May Concern:

SUBJECT:

UPDATING THE MAILING LIST FOR THE TURKEY POINT PLANT, UNITS 3 AND 4, AND ST. LUCIE UNITS 1 AND 2 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Turkey Point Plant, Units 3 and 4, and St. Lucie, Units I and 2. We currently have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Miller, Licensing Assistant Project Directorate II-2, NRR MS 14H22 U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

Sincerely,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC: L '22 W << >>W NAME  : D W

DATE 91 Document Name: CC LIST LETTERS

II H

t

March 21, 1991 Docket Nos. 50-250 DISTRIBUTION and 50-251 NRC 8 Local PDR DMi 1 le r Joaquin Avino County Manager of Metropolitan Dade County ill NW 1st Street, 29th Floor Miami, FLorida 33128

Dear Hr. Avino:

SUBJECT:

UPDATING THE MAILING LIST FOR THE TURKEY POINT PLANT, UNITS 3 AND 4 I am in the process of updating the mailing list which the Nuclear Regulatory Commission maintains for the Turkey Point Plant, Units 3 and 4. We currently have your address listed as above. If the above address is incorrect, would you please provide any corrections to me at the following address:

Deborah A. Miller, Licensing Assistant P~oject Directorate II-2, NRR HS 14HZZ U.S. Nuclear Regulatory Commission Washington, DC 20555 I would appreciate receiving any corrections by April 17, 1991. Thank you for your cooperation.

S in cere ly,

/s/

Deborah A. Miller, Licensing Assistant Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation D 2 NAME: D e DATE /691 C R D C P Document Name: CC LIST LETTERS

Ai V

4 f

II 0 0 1 s, II t

X

,V Ij 1 t