Technical Rept on Evaluation of Use of Arching Theory in Analysis of Masonry Walls Under Differential Pressure - Turkey Point Plant Units 3 & 4ML20111B175 |
Person / Time |
---|
Site: |
Turkey Point |
---|
Issue date: |
11/30/1984 |
---|
From: |
Hamid A DREXEL UNIV., PHILADELPHIA, PA |
---|
To: |
|
---|
Shared Package |
---|
ML17346A710 |
List: |
---|
References |
---|
NUDOCS 8501080530 |
Download: ML20111B175 (4) |
|
|
---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML20137M2121996-12-17017 December 1996 Monthly Indicator Rept, Nov 1996 ML20137M9261996-10-31031 October 1996 Monthly Indicator Rept ML20137N1941996-10-17017 October 1996 Monthly Indicator Rept, Sept 1996 ML20137N2051996-06-14014 June 1996 Monthly Indicator Rept, May 1996 ML20137N2111996-05-14014 May 1996 Monthly Indicator Rept, Apr 1996 ML20137N2201996-04-17017 April 1996 Monthly Indicator Rept, Mar 1996 ML17354A2841996-04-0707 April 1996 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 941114-960407. ML17353A6341996-03-31031 March 1996 Rev 0 to JPN-PTN-SEFJ-96-015, Control Rod Operability Evaluation as Result of Incomplete Rod Insertion at Other Westinghouse Plants. ML20137N2381996-03-19019 March 1996 Monthly Indicator Rept, Feb 1996 ML20137N3661995-12-18018 December 1995 Monthly Performance Monitoring Mgt Info Rept, Nov 1995 ML20137N4311995-10-18018 October 1995 Monthly Perfromance Monitoring Mgt Info Rept, Sept 1995 ML20137M7111995-07-25025 July 1995 Quality Assurance Audit Rept QAS-ENV-95-1, Radiological Environ Monitoring Program & Site Nonradiological Environ Protection Plans Functional Area Audit, 950525-0714 ML17353A2561995-07-14014 July 1995 Service Water Operational Performance Insp,Self Assessment, Final Rept, for Turkey Point Nuclear Plant ML17353A2641995-06-27027 June 1995 Pyrolysis Gas Chromatography Analysis of 7 Thermo-Lag Fire Barrier Samples. ML17352B0441995-02-20020 February 1995 Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structures. ML17352A8841994-10-28028 October 1994 Plant,Simulator Certification Update 1. ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML17353A9201993-04-30030 April 1993 Plant Specific Seismic Adequacy Evaluation of Turkey Point, Units 3 & 4 to Resolve USI A-46 & GL 87-02. W/O App a ML17349A7961993-04-12012 April 1993 Nonproprietary Addendum 1 to Thimble Reduction Study for Turkey Point Units 3 & 4. ML17349A7951993-04-12012 April 1993 Nonproprietary Thimble Reduction Study for Turkey Point Units 3 & 4. ML17349A4721992-11-0505 November 1992 Fifteenth Year Tendon Surveillance Supplemental Rept. ML17349A4061992-09-23023 September 1992 Rev 0 to JPN-PTN-SEMJ-92-034, Safety Evaluation for Interim Fire Protection Sys Configuration to Support Unit 4 Startup. ML17349A3501992-08-17017 August 1992 Engineering Evaluation for Verification of PSB-1 Computer Model for Setting of Undervoltage Relays. ML17348A8011991-01-0202 January 1991 Simulator Initial Certification, Vol 1 ML17348A8021991-01-0202 January 1991 Simulator Initial Certification, Vol II ML17348B0071990-12-31031 December 1990 Probabilistic Seismic Hazard Evaluation & Uniform Hazard Spectra for St Lucie & Turkey Point Nuclear Power Plant Sites ML17348A2811990-05-31031 May 1990 Suppl 0,Rev 1 to Emergency Power Sys Enhancement Project Design Rept. ML17348A2821990-05-31031 May 1990 Suppl 2,Rev 1 to Emergency Power Sys Enhancement Rept, Safety Analysis. ML17348A2831990-05-31031 May 1990 Rev 1 to Emergency Power Sys Enhancement Project Response to NRC Request for Addl Info. ML17347B4621989-12-31031 December 1989 App a to USI A-46 & Generic Ltr 87-02. ML18008A0311989-07-31031 July 1989 NTH-TR-01 Decrease in Heat Removal by Secondary Sys. ML17347B0861989-03-31031 March 1989 Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing. ML17345A6631989-03-21021 March 1989 Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects Ref NRC Bulletin 88-008. ML17345A4201988-08-31031 August 1988 Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation, Ltr Rept ML17345A3151988-08-15015 August 1988 Independent Mgt Appraisal Re Corrective Action Programs & Investment in Supporting Resources,Recommending Extension of Effective Performance to Include Corporate Level & Site Level Measures ML17347A7851988-06-30030 June 1988 Emergency Power Sys Enhancement Rept. ML17347A7971988-06-16016 June 1988 Seismic Hazard Data Prepared for Resolution of USI A-46. ML17347A7981988-06-16016 June 1988 Radiological Data Prepared for Resolution of USI A-46. ML17342B2901988-04-18018 April 1988 Independent Mgt Appraisal. ML17347A6531987-12-11011 December 1987 Outside Containment Limitorque Wire Rept. ML17347A4521987-04-27027 April 1987 Rept on Instrumentation Port Column Assembly Leakage,Turkey Point Unit 4. ML20213H1731986-08-31031 August 1986 Economic Benefits of Nuclear Phase Out ML20155A1831986-02-28028 February 1986 Human Factors Engineering Guidance Manual,Turkey Point Nuclear Power Plant Units 3 & 4 ML17346B0151985-04-30030 April 1985 Rev 1 to Turkey Point Plant Unit 3 Engineering Evaluation of Instrumentation Sys for Reg Guide 1.97,Rev 3. ML17346B0161985-04-30030 April 1985 Rev 1 to Turkey Point Plant Unit 4 Engineering Evaluation of Instrumentation Sys for Reg Guide 1.97,Rev 3. ML20111B1751984-11-30030 November 1984 Technical Rept on Evaluation of Use of Arching Theory in Analysis of Masonry Walls Under Differential Pressure - Turkey Point Plant Units 3 & 4 ML20090H4561984-07-23023 July 1984 Rev 1 to Spent Fuel Storage Facility Mod Sar ML17346A4041984-05-31031 May 1984 Rev 0 to Auxiliary Power Upgrade Summary & Design Evaluation. W/10 Oversize Figures.Aperture Cards Available in PDR 1998-06-29
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
-.,
A Technical Report on EVALUATION OF THE USE OF ARCHING THEORY IN THE ANALYSIS OF MASONRY WALLS UNDER DIFFERENTIAL PRESSURE-TURKEY P0lNT PLANT UNITS 3 & 4 by Dr. Ahmad A. Hamid and .
Dr. Harry G. Harris Department of Civil Engineering Drexel University Philadelphia, PA Submitted to Dr. V. Con Nuclear Engineering Franklin Research Center Philadelphia, PA November 1984
%50/0TO53@ ,
e' INTRODtlCTION On August 16, 1983, the NRC staff and FRC staff and cons'ultant visited Turkey Point Plant in Florida to observe and examine the block masonry walls in the plant. Following the site visit, the NRC staff and FRC staff and
, consultant conducted a meeting at Bechtel's Gaithersburg office to discuss design critoria and to review calculations and analyses used for masonry wall qualifications. Among the main issues were the use of arching theory and the increase of code allowable stresses.
1 As a result of the meeting, Florida Power and Light company ( FPL )
decided to adopt a more conserative design approach by using an elastic analysis with stress allowables except for walls in the Steam Generator Feed Pump Building where arching theory was used to qualify the walls under pressure differential loading.
The FRC consultants discussed the applicability of arching theory with the Bechtel staff in a subsequent conference call. They also reviewed the utility's response to the questions raised during the meeting at Gaithers. burg.
This report presents the FRC cosultants' review and evaluation of the calculations and analysis procedures used for the qualification of masonry walls in the Steam Generator Feed Pump Building using the arching theory.
DESCRIPTION OF MASONRY WALLS Masory walls in the Steam Generator Feed Pump Building are fully grouted block walls. The wall thickness is 12 in. nominal. The maximum wall height is 14 ft. Construction details call for a filled solid mortar joint at the top of the wall. No clip angles are provided.
2
?
t l
ARCHING M(CHANISM OF MASONRY WALLS .
Unreinforced masonry walls have a very limited capacity under the action of out-of plane loads. Higher resistance could be developed by l creating large in plane clamping forces, thereby forming a three hinged arch mechanism after mid-span and support flexural cracking has occurred (1,2,3).
THE USE OF ARCHING THEORY FOR WALLS UNDER PRESSURE LOADING The design methodology used at Turkey Point was originally dev. eloped by McDowell et al. (2). FPL considers a pressure of 1.14 psi to be applied to unreinforced block walls in the Steam Generator Feed Pump Building. Based on FPL calculations presented in the response to NRC questions, consideration of the load as equivalent static loading is justified. The applicability of arching theory to block walls is justified by FPL based on available URS test data (3) of block masonry walls under blast loading.
There are similarities existirg between URS test walls and walls at Turkey Point that could justify the use of the methodology with adequate margin of safety. These include the type of loading, construction details and material properties.
Shear stresses at the support sections are low enough not to cause any web shear cracking or faceshell spelling. Due to the fact that cracking has a significant effect on the development of the arching mechanism, this technique should not be applied to procracked walls . The few walls that
' expreinced cracking at Turkey Point are hollow block walls that are located in the Auxiliary and Turbine Buildings.
3
e CONCLUSION It has been demonstrated by URS tests that block masonry wills could l withstand high pressure loacing. Therefore, FPL design methodology j
. based on arching theory, used to qualify block walls at Turkey Point under pressure differential is adequate, l
t REFERENCES l
t l (1) Hamid, A.A. , Harri::, H.G. and Con. V. ," Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants,* Franklin i Research Center, Philadelphia, PA , June 1983.
1 (2) McDowel, E.L., McKee, M.E. and Sevin, E.," Arching Action Theory of Masonry Walls," ASCE Proceedings, Journal of the Structural Division, ST2, l March 1956.
(3) Gabrielsen, B., Wilton, C. and Kaplan, K.," Response of Arching Walls and Debris from Interior Walls Caused by Blast Loading," Report No.
7030-23, URS Research Company, San Mateo, CA, Feruary 1975.