ML17334B069
ML17334B069 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 03/23/1987 |
From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | Harold Denton NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.31, TASK-TM AEP:NRC:1024, NUDOCS 8703310374 | |
Download: ML17334B069 (52) | |
Text
REGULATORY FORl'tATION DISTRIBUTION S N'R IDS)
ACCESSION NBR: 8703310374 DOC. DATE: 87/03/23 NOTARIZED: NO DOCKET ¹ FACIL: 50-315 Donald C. Cook Nuclear Pouer Plant> Unit fi Indiana 5 05000315 50-316 Donald C. Cook Nuclear Power Plant~ Unit 2> Indiana 5 050003fh AUTH. MANE AUTHOR AFFILIATION Al EXICH.N.P. Indiana h Michigan Electric Co.
RECIP. NAME RECIPIENT AFFILIATION DENTONi H. R. Document Control Branch (Document Control Des! )
SUB JECT: Requests concul rence Lll/interpretation of Tech Specs 3. 5. 2. e 5 3. 5. 3. d for both units re min number of floe paths fran safetg ingection pumps 5 RHR pumps to reactor coolant sos.
Related documentation encl. Fee paid.
DIBTRIDVTION CODE: AO46D TITLE: OR Submittal: TNI COPIEB RECEIVED: LTR J ENCL Action Plan g BI ZE:
Rgmt NUREQ-0737 h NUREQ-Obb0 NOTES:
RECIPIENT COPIES RECIPIENT COP IES lD CODE/NAI'1E LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A ADTS 1 1 PWR-* EB 1 PWR-A EICSB 2 2 PWR-A FOB PWR-A PD4 LA 1 0 PWR-A PD4 PD 5 5 WIQQINQTON D 1 PWR-A PSB 1 1 PWR-A RSB 1 1 INTERNAL: ADN/LFNB 1 0 AEOD/PTB 1 1 IE/DEPER DIR 1 1 IE/DEPER/EPB 3 3 NRR BWR ADTS f NRR PAULSONi W. 1 1 NRR PWR-A ADTS 1 f NRR PWR-B ADTS 1 ENRIT 1 1 OGC/HDS1 0 REQ FILE 01 1 f EXTERNAL: LPDR f 1 NRC PDR
,NSIC f 1 TOTAL NUl'ABER OF COPIES REQUIRED LTTR 30 ENCL 27
v) f ki'i 4<
j 4~4 P ~ 4 I
~ 1( 4 <
v ~
I<< ( II Il V,<<
, h
~ l V 4, I '~ < ~ ( I'Il I 'I 1 y" 41 1)jf e,(h ef'
<v 4, IV
(
1 I 4 If
'VV)
I<<
II 1',
e(
4( tl.
e(e<
4 4) fy<
Vv ( e V II
( (I I(')
II 1'
,It
IN DIANA 8 M ICHIGAN ELECTRIC COM PAN Y P.O. BOX I6631 COLUMBUS, OHIO 43216 March 23, 1987 AEP:NRC:1024 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 REQUEST FOR REVIEW OF PROGRAM AND SELECTED TECHNICAL INFORMATION REGARDING TECHNICAL SPECIFICATIONS FOR OPERATION WITH LIMITED SI OR RHR FLOW PATHS U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ATTN: Mr. H. R. Denton
Dear Mr. Denton:
The purpose of this letter is to request your concurrence with an interpretation of Technical Specifications (T/Ss) 3.5.2.e and 3.5.3.d for both units of the Donald C. Cook Nuclear Plant, concerning the minimum number of flow paths from the safety injection (SI) pumps and residual heat removal (RHR) pumps to the reactor coolant system.
T/S 3.5.2 states that two emergency core cooling system (ECCS) subsystems must be operable; it defines an operable ECCS subsystem as including one operable SI pump, one operable RHR pump, and associated flow paths. This T/S also allows the operator to remove one ECCS subsystem for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> while in Modes 1, 2, or 3 while maintaining an operable flow path for the opposing subsystem. T/S 3.5.3 states that two ECCS subsystems must be operable; it defines an operable ECCS subsystem as including one operable RHR pump and associated flow paths. This T/S allows the operator to remove one ECCS subsystem for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> while in Mode 4 while maintaining an operable flow path for the opposing subsystem.
We are proposing to interpret T/S 3.5 ' such that the flow path portion of one ECCS subsystem is considered operable when one SI pump or one RHR pump can deliver flow to only two reactor coolant syst: em (RCS) loops while the other pump within the same subsystem is aligned to deliver flow to four loops. We are proposing to interpret T/S 3.5.3 such that the flow path portion of one ECCS subsystem is considered operable when an RHR pump can deliver flow to only two RCS loops. We are also asking that the interpretation be extended to any configuration (such as servicing an RHR heat exchanger) in which flow from a single operating RHR or an SI pump can be delivered to only two RCS loops with the other pump aligned to deliver flow to four loops.
8703310374 870323 PDR ADQCH 05000315 PDR
o
)
1 AEP:NRC:1024 We intend to justify this request by means of analyses which will show that in the case of a small- or large-break LOCA, the configurations we are requesting would provide sufficient flow to maintain peak clad temperature below the value stated in 10 CFR 50.46. The small-break LOCA analyses will show that one SI pump delivering flow to two RCS loops will provide sufficient cooling. The large-break LOCA'nalyses will show that the combination of (1) one RHR pump delivering flow to two RCS loops and (2) one SI pump delivering flow to four RCS loops will provide sufficient cooling. We are requesting your concurrence with an interpretation of these T/Ss that will allow us to operate in these configurations so that we can continue uninterrupted operation while performing maintenance and required testing on these systems.
An example of such maintenance and testing is work that requires the closing of SI or RHR cross-tie valves. The consequence of closing these valves is that SI or RHR flow would be delivered from the affected pumps to only two of the four RCS loops. Attachment 1 to this letter presents two flow diagrams for the Donald C. Cook Nuclear Plant. These diagrams (1-5104C-3 and 2-5104C-3) show the flow arrangements of the SI and RHR systems for Units 1 and 2, including the cross-tie valves IMO 270, 275, 314, and 324 for both units.
We believe that this is a generic issue. Several instances of operation with the RHR cross-tie closed and a single RHR pump operating have occurred in other Westinghouse plants, as cited in IE Information Notice 87-01. A copy of this Information Notice is included as Attachment 2 to this letter. We believe the analyses presented to justify our request will serve as a basis for solving the generic concern as applied to the Donald C. Cook Nuclear Plant.
This issue was discussed with members the NRR staff and the Region III staff and was in part the subject of an ofEnforcement Conference held at Region III headquarters on January 21, 1987. As we stated at that conference, until very recently both units of the Donald C. Cook Nuclear Plant had been operated under the assumption that a single SI or RHR pump delivering flow into two separate loops constituted an operable flow path for that pump. This allowed performance of required maintenance and testing without having to bring the unit to cold shutdown. IE Inspection Report 86042, a copy of which is included in Attachment 3 to this letter, raised the issue of whether closing the SI cross-ties resulted in an acceptable degradation of safety according to the accident analysis. Two LERs, copies of which are also included in Attachment 3, were written on this subject.
In our detailed review of the LER resulting from the NRC Inspection Report on our SI pump cross-ties, we found that a similar situation existed with the RHR cross-ties as well. As a result, we requested an ASME code exemption so that we would be able to avoid testing certain valves while at power, since testing at power would provide an inoperable ECCS flow path during the time we were operating on a single pump and the RHR cross-ties were closed. The NRC responded to us in a letter dated December 19, 1986 from B. J. Youngblood to John E. Dolan (see Attachment 4). That letter, which granted temporary relief for testing the valves, also stated in part
4 AEP:NRC:1024 that "The IMEC request for permanent relief for testing of these valves is considered premature in light of the test configuration analysis underway for D. C. Cook." We believe that being allowed to interpret the T/Ss in the manner indicated, based upon the information to be provided, will serve as the basis for closing the issues identified by the NRC.
Presented below is a historical and licensing discussion of the factors leading to the decision to make the request presented above, a discussion of the alternatives we have considered, and a summary of the action we would like the NRC staff to take in this matter.
Historical and Licensin Basis Unit 1 of the Donald C. Cook Nuclear Plant is currently in the last stages of transition from fuel supplied by Advanced Nuclear Fuels Corporation (formerly Exxon Nuclear Company) to fuel supplied by Westinghouse Electric Corporation. Unit 1 currently contains 159 15 x 15 assemblies supplied by Westinghouse and 34 fuel assemblies supplied by Advanced Nuclear Fuels Corporation (ANFC). After the next reload (scheduled to begin at the end of May or early June 1987) the core will be fueled entirely with 15 x 15 fuel supplied by Westinghouse. Unit 2 is fueled with 17 x 17 fuel supplied by ANFC.
The latest SBLOCA analysis of record for Unit 1 is the analysis submitted to the NRC with our letter AEP:NRC:0860A, dated March 15, 1985 and approved by the NRC in their Safety Evaluation Report accompanying Amendment 84 for Unit 1 and Amendment 64 for Unit 2. The Unit 1 analysis was also determined to be acceptable for determining peak clad temperature (PCT) of the Unit 2 limiting break, and is referenced in XN-NF-85-28(P),
Supplement 1, "D. C. Cook Unit 2, Cycle 6 Safety Analysis Report:
Disposition of Standard Review Plan Chapter 15 Events."
In preparing for the January 21, 1987 Enforcement Conference, we contracted with Westinghouse to perform comparative evaluations using the NOTRUMP computer code to evaluate the effects of closing the safety injection pump cross-tie on Unit 2 with one safety injection pump operable.
Westinghouse performed a SBLOCA evaluation using the NOTRUMP code because (1) it was approved for application to the Donald C. Cook Nuclear Plant (see May 24, 1985 letter from S. Varga, NRC, to John E. Dolan, AEPSC in Attachment 5) and (2) it was stated in that letter that "Future plant specific analyses performed for your plant by Westinghouse for reloads or Technical Specification amendments (those beyond 90 days of the date of this letter) should be calculated with the new code, NOTRUMP."
The Westinghouse SBLOCA evaluation for Unit 2 is based on a comparison of the Donald C. Cook Plant to a similar four-loop Westinghouse plant using the NOTRUMP computer code. NOTRUMP, rather than WFLASH, was used for the comparative evaluation in accordance with the May 24, 1985 letter mentioned above. A comparative evaluation (rather than a Cook-specific analysis) was performed because we were informed by Westinghouse that time did not permit the performance of Cook-specific analyses in preparation for the enforcement conference.
I
>)'EP:NRC'1024 The report of that evaluation (which is included in Attachment 6) states:
"The estimated PCT assuming HHSI [Safety Injection] cross-tie closure and the single failure of a diesel generator to start when all ECCS pumps are available was estimated to be approximately 1482 F. This indicates there is significant margin to the 2200 F limit of 10 CFR 50.46 for the operation of D. C. Cook Unit 2 at a licensed core power of 3411 MWt with the High Head Safety Injection System cross-tie connection closed."
We believe this statement supports our position that the plant can be within current regulatory limits with the safety injection cross-ties closed.
Alternatives Before making this request, we considered several alternatives. These include (a) operation in compliance with the literal T/S requirements and no further request for NRC action, (b) system hardware modifications to allow compliance with the T/S requirements as currently interpreted, and (c) plant-specific analyses.
Alternative (a) was not desirable because it could require numerous plant shutdowns at regular intervals for required testing and/or for relatively minor maintenance. This would result in unnecessary thermal cycling of the system, would unnecessarily burden the plant staff, and would result in a loss of ability to provide continued power generation.
Such shutdowns would last a week or longer and cost our ratepayers between
$ 200,000 and $ 600,000 per day per unit in replacement power.
Alternative (b) was not desirable because of the extensive nature of the hardware changes which would be required to allow continued plant operation with the cross-ties closed, while still maintaining the active/passive failure requirements that are part of the plant design basis. These hardware changes, which could include both piping changes and addition of qualified motor-operated valves, would require extensive time to complete, and would involve extensive plant shutdowns.
Alternative (c) was not desirable because it would involve expensive and time-consuming plant-specific analyses. We currently anticipate performing substantial new analyses to permit operating the Cook units at lower temperatures and pressures to extend steam generator lifetimes.
However, we would prefer to approach the issue in a considered and deliberate manner. Since the large- and small-break LOCA analyses involve many aspects (both design and operational) of the plant, we believe it would be more effective and economical to review all aspects of the analyses and structure the effort to provide the maximum benefit. Until such analyses have been completed, we feel the comparative analysis approach as suggested in this letter is warranted.
4 AEP:NRC:1024 Anal ses to be T ansmitted and Re uested NRC Action The analysis of record for both units assumes that SI and RHR flow is delivered to all four loops with a single pump of each subsystem operational's mentioned above, we are enclosing or will transmit to you the following documents to support our request:
- 1. An evaluation of the consequences of two-loop injection on the small-break loss-of-coolant accident (SBLOCA) for Units 1 and 2.
As mentioned above, the evaluation for Unit 2 has been completed and is included as Attachment 6 to this letter. A similar evaluation of the small-break analysis of record for Unit 1 is also under preparation by Westinghouse.
- 2. An evaluation of the consequences of two-loop injection on the large-break loss-of-coolant accident (LBLOCA) for Units 1 and 2.
These evaluations are also under preparation by Westinghouse and Advanced Nuclear Fuel Corporation for Units 1 and 2 respectively and are scheduled for completion by mid-April 1987. We expect that the evaluations will show that two-loop injection using one RHR pump is acceptable, provided a single SI pump is delivering flow to four loops.
- 3. A justification that the generic analysis presented in WCAP-11145 is applicable to Unit 2 under the present operating conditions, as suggested in the letter dated December 22, 1986 from Mr. B. J. Youngblood of the NRC to Mr. J. E. Dolan of AEP. (See Attachment 5.) This evaluation is anticipated to be completed by mid-April 1987.
We believe that NRC acceptance of this interpretation will resolve the NRC-stated concerns with testing according to the ISI/IST ASME code as described in Attachment 4 and will allow closure of the open items as referenced in Attachment 5 regarding NUREG-0737, Item II.K.3.31.
In turn, we request that you inform us within two weeks of receipt of this letter whether the information presented here concerning our request and the technical information in Attachment 6 are adequate to permit you to reach a decision on this T/S interpretation by May 15, 1987. The reason we are requesting a prompt response is that until we receive a response, maintenance or testing of the emergency core cooling of the safety injection or RHR pump isolation valves may require unnecessary shutdown of both units. If you have any questions, my staff is prepared to discuss this matter by telephone or meet with you to provide further information.
A check in the amount of $ 150.00 is enclosed with this letter for the NRC processing of the aforementioned request.
0
, ~ AEP:NRC:1024 This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M. . Al ich Vice President cm Attachments cc: John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman (w/ attachments)
A. B. Davis, Region III (w/ attachments)
Attachment 1 to AEP:NRC:1024 Unit 1 and 2 ECCS Flow Diagrams
r+
I
- I 0 I E I 0 I A OIC I GCMERAL NOTES 4(HIIO SlaL WA110 SCAL WAT(R lsso 41 g NH'110 nalto N(AT CTC<<AMC(R LECIEHD
~
Volvalt MAII( flOW SSS I i'so CONTROL TRNA olscscR Aslr TI.OW 01 C>>s>>CI<<C ls<<t 10 TANK RESVCLLHC wa'I(R M
COOSAN'I S<<SSP O(AL S>>All Sl.
~1(ss III Il(C(N(talsri Hil'1 stotact Ta<<r Nso IS
~AC4'IV>>4, a<<0 os>>(R orssoao <<ol al 4aaO IM l<<has<<IO Iw (woo>>C,
~ sso I44 asao \ wvol ~
OMO 101 OMO 114 ts ONI.IIC OHO ~ '02 COOT OI Stl O<<O SLOO
~ I >i(v tls OOR ON
<<aH C (toss
<<sl I Isa ss BOOKS 4MO 100 To alt(so<<(oaa<<f t<<0 1II SIMOOLS tvp sl<<a~
10 alaCIOO (las<<l 'aa aatllRSSS(s looP COED ltoa VPPIN CDLSPANT M(HT bao 2SI, ORY 251~ 't'l OtsPSCR lsLIHK(
CONKl
>>H>>I I<<WK
~
It. s ~ >> ~ ' >> I'
~ wa Pap>> svaspv tSS 14 sp<<AV plaol<<0 00 So (SI CSHACSNC PSSMPS (II c(<<T>>sp<<oaa lsl RECsptocals<<C 0
IRV Sli r>>tar St( r (AV Sit IRV I'l I IROM N 10 Ssso LT (NLsot s (rr(s>>so <<*lcA Ncrw<<
tat ACCSNNSLATOR Nl I Ns1 HIS (srlsissSC llv HA TANKS 1<<4 114 14 Rt<<CIRR Coca>><<1 STS COLD Lt40 tsOOOg ~ r I>>Isa CO<<SS>>>>CNI Nss Isl IO~R IOR TNLS SK Sll LNP tol gwfe SHI, I/O (11 IstSIO<<AL <<IK Msas<<K>>T (HNIIIHS INP sCat EICNANC(RS 14 Iasl TN(oossl tal(IT ssp SKI>>I LNP I (SN Slo l WO SS~O SPIAT IWL Oallass ASO 4>>>>AS<<SAC<<I VlssML list(llshalo<< 4I HMI Il I VHILNKI ICN >>O 00(as ~ osat Nt OIIANS N( ISCQIK (H4 llo IOP Mo Iaso SSI I
V t<<4 Mo I LNP a I%V>>0 ICas'St l (ll R(SLCalaaPVMPS NiaT RO(t I>>~ r<< II>> ~ Ha>>Has
~
t laso SSI REMOVAL ~ ~ <<sol swso>>O 1 44P Ss II NS SSITTV HKCT ION IVaSPS
~
~ I IS4SL ACT I RIO Stt lsa0 MSN p Escr Lo (sottossR>>sat IK lo( loas LOOP NIL I(H TLO c(ATHLCsE RHIS tveaso SK(ON (SA(ERA((so (IKLVt 141>> sass Ssso t
<<sCPIO I
+1<<0 Sst Lo>> sNAO SHIIT (HO SCt iCA'V(~SoR'og a<<1
~ oa Nr<<IH Naa<<PITH Nsaosst Nrsoaw ANNO a
~ alas loot <<sl LOS.CR COHPANTH(NT (MO' Il NN lsal oas<<>>0 SNI IIL IN Clas(O<<>> ~ I~ ~ ~
I(Ho VS
<<>>w ~ <<w p ~
I~ Staat NACKRS tart((SS ~ Ns>>v 4 sao<<as>> osas<<N Na (HOII( CONllD C COCK NKllalISAKI I
( 1) C ass IA NMIN 1 s
ill500ar COsslas>>as(N'I S.OsaPOVTE TLONDSACRSN OP 0
u<< SIRLT (MO 10't SPRAT IS(SI cac<<AIIC(RS ~tHO t10 P<<vps (sSLs>>((<<(0 Wt I I LIS'll<<:
ut >>2 AOOIIIV( <<Ns ~ N I
>> ss s IAHL 1 ~s ~ P ~ Snaaa A<<\ NOI P1 1st "1 NLLN I 5IOCC 3
<>
Os SP sss 0
Pt sas u ('t3 K I L
~
~ lasso>>N osswo HW SN>>N HW
~ N HH
P I 0 l I OENERAL NOIES SeoeC-1 4>> ra SikL SVkftk Slal s>>kit k I<<O 4l yoffe l)4 fI at 1 0 ISEAT C'ICPANC,EP, LOCICNO I 'SDLIIME MAIN fLOW I IP I CON'I RDL AOS'LOW Sao 42 tpwk SMcros Cassss>>C La>>1 '10 TAIIC REFUILINC WATCR I cooaA>>l tatkP SLAL NATIR
~IIV rso PICLNIPAISVE NEAT SlolaCE TMI4 rka IMvl vslwa>>s I EICNANCER Nr I ~ kvese>>4 eews vasf kata wp oleetk sr>>Cosa e>>r
<<0 SS 4MO 4)I IMsa<<ID Oe lws o<<c, l M WO t44 aaa4 I M<<OI ~
COOCSI Sl ~ Deco 4sok Nrl Oaao iol OSIO 11 Ctko tCS Oaao&42 I
<i-.tlk ISOROsa Parr CI ION ere I IAealc 4MO.IOO 14 <<>>sew ccoawf IMO"SN SIMSOLQ
~ aav ra) <<>>
10 SIAclcas class>>i M
AMINO 2SC Mtlt~ SIIC LOOt COLD LCOJ OCS FICC UP>>IN CD>>IP*RTMENT 't'ICIIaft 14 StRAV NIADCRS
~0>> I)S
<IMO Sso 4 'II CCNCI 4 t<< I ~I<<a>>C ~ I evk tM>> w>>JM 0>> )CP W)IIW)a) IN C>>AACSNC PVMtS II) ct>>loefvcAL DI RECIPCOCAIWC ]NI)40 IRV'Nt I)t I IAoaa 04$ rkr I attar ett IPV IAV eal NRPOCIN 0 SUPPLT I Ctvfa<<C, '<<4'ICR Ifra>>>>
r ~F'>>
El) JEEIRRRATot IatllNRC tANIIS Nfl Nri NI 5 14 RCaC'104 COCAANI pl>>t)$4 FICM ll>> 144 SYS COLD LtOS IIOOOg CCaeIaawkeal Saaat IOR laRS IN SIC O<<4 SNCr I E.',
I44I' Ial t/0 I/0 ll) RESIDUAL I sat >>as I IOVVS Ni At EfcasANctts nt>>1 <<.
I>>4 al4 T NWAL Sakt T I <ta>>aaa ress Rkkoka Is J searraNNI Ntftg>>IMNN ft MAN SSM Ns) ICN N CIICWIS 4sCT. Nl SIINL1 Ni lrlCUR Saaa>>IL
)NO r)O IPP)24 I>>OS sv IMO-III t>>tlto I r 5 KM Sll (21 RtSaovM. sstkf >>aft I REIADVAL PUMPS I 4 t<<4 va~vwovg eta Coat >>I 1 ~ II III I ~
LSSP All INO)2$ 2 Li osis laeO )sr Kas tao S IMCP tl0'0 IJO- Ir OICN IP OCIE SE )2 I IPM CtalofICR CAINI>>c Rapt SCION EACT)4RERAICILIR lore e>>AD
~ INCI>>>>~f Skrllf INO 142 Q<<I ~~ II.S ~
ICNV)t Vkrc ( ICR <<SIN)s SCNNtfaw NC
)oot ta~
'a4>>
LOIICR CDNPARtMC>>t iaao tll
~ Dawsrl NVNIIN ACCSa Icp fsas Saa<<N i INO lao g)NO'ls) a>>v>> <<<<<<
~~
14 )troat ICkaks 5 I
~~tv\ er<<e<<
>>4 ~ ~
~
IMO 222 laso.ltS 1 <<tar<<4 www>> NNT>>4 %
l>>otii DONALD C CXXX IACLIMIMPI I ~ NI>>av II ) Co>>TAI as ski N 1 cD4to'NIC floo DIALAJN C
0 SIRar INO 101 StRAY Pi>1 EI'M'220 It) CoeslAaeaaal>>1 CNLIIIEEREOSMEIT $ 1)TIIN Oe t)CNANCEIIS SPRAY PUMFS waT Ns 2 V
vl
>>V II 2 sooltlst C ~ Cctlsoass AAt Nof 5
Ol Nl SR a>> 2 5)04C. 5 4 ~ rk 04 LIMO toL Oe 2
5s
II e W ss 'e os BACKGRO There are two high head safety injection (HHSI) pumps in the D.C.Cook Unit 2 design. Each HHSI pump discharge line splits to deliver flow into two of the four cold legs. A cross-tie connects the two pump
,discharge lines enabling one pump to deliver flow to all four of the cold legs. The design basis small break'oss-of-coolant-accident (LOCA) analyses assume that high head safety injection flow delivery is available through all four lines.
American Electric Power Service Corporation has requested Westinghouse to evaluate the D.C. Cook Unit 2 Emergency Core Cooling System (ECCS).
performance following a small break LOCA for a scenario in which the HHSI cross-tie.line is closed during normal full power operation. The evaluation will serve as the basis for a change to the current LOCA design basis in order to allow full power operation of D.C. Cook Unit 2 with the HHSI system capable of injection to only two reactor coolant loops.
Closure of the cross-tie line results in the flow from one HHSI pump being delivered to only two loops. This results in a reduction in the amount of total safety injection flow delivery to the RCS during a LOCA event when the single failure of an emergency diesel generator to start following the loss of offsite power is considered. As a result of the diesel failure, one train of safety injection is lost.
The D.C. Cook Unit 2 licensing basis LOCA analyses consider both large and small break LOCA events. The large break LOCA result is not highly dependent on HHSI pump flow capability due to the rapid depressurization to the accumulator actuation pressure (600 psia) and the continued rapid depressurization to the Low Head Safety Injection (LHSI) pump actuation pressure (114.7 psia). Recovery from a large break LOCA event is governed by the availability of LHSI and accumulator delivery during the reflood phase of the transient, hence a reduction in the amount of total HHSI flow delivery will not affect the
Page 2 of 10 large break LOCA results. The small break LOCA result is highly dependent upon charging pump and HHSI pump flow delivery to the RCS, but is not dependent upon LHSI flow delivery. .Small break LOCA's which result in the highest Peak Cladding Temperatures (PCT's) do not experience primary reactor coolant system depressurization to the LHSI delivery pressure, therefore the small break LOCA analysis considers safety injection flow from the charging and HHSI pumps only. Hence, a change to the design basis in which the HHSI cross-tie line is assumed unavailable requires that only the small break LOCA results be considered.
In order to determine the effect of the cross-tie line closure on the plant response to a small break LOCA, Westinghouse performed an analysis on a reference plant similar in design to D.C. Cook Unit 2.
The reference four loop plant used to determine the safety injection sensitivity is essentially identical to Cook 2 in vessel design and loop components. Table 1 provides a comparison of the basic vessel and components design of D.C.Cook Unit 2 with the reference plant design.
Table 1 shows that the plant designs are virtually identical except for the upper head bypass flow. The slight difference in the upper head bypass flow at such low flowrates is expected to have an insignificant effect on plant response to a small break LOCA. Table 2 provides a comparison of some of the important parameters influencing plant response to a small break LOCA for D.C.Cook Unit 2 and the reference types'oth plant design. The major differences noted between the plants include the licensed core power, the licensed peaking factor, and the fuel D.C.Cook Uni't 2 and the reference plant operate with a 17X17 fuel array. The current cycle of operation at D.C.Cook Unit 2 contains an EXXON fuel core with the exception of one Westinghouse fuel assembly, while the reference plant has a complete 17X17 Westinghouse standard fuel core. The difference in fuel pellet outer diameter, fuel rod outer diameter, and fuel rod pitch are small between the EXXON 17X17
C l
Page 3 of 10 fuel and the Westinghouse 17X17 standard fuel. Consequently, the effects of fuel parameter differences are expected to have only a small effect on the transient response.
The total core power level influences the depth and duration of core uncovery. The decay heat generation rate, which is a function of the total core power level, determines the rate of core boiloff steam production in conjunction with the safety injection flow rate following a small break LOCA. The reactor coolant system thermal-hydraulic response to a small break LOCA, as calculated by the NOTRUMP code, is then dependent upon the ratio of the core power to safety injection flow rate. Higher safety injection flow delivery rates provide more core subcooling to absorb decay heat as well as, providing more mass addition to keep the coie covered. Consequently, the effect of the
~
difference in the total core power level between the plant designs is diminished due to the influence of the safety injection flow. The core power to safety injection flow ratio has been determined at a
'epresentative pressure of 1114.7, psia which approximately corresponds to the quasi-equilibrium pressure at which the primary system tends to stabilize prior to the venting of the pump'uction leg loop seal.
Following loop seal venting, core boiloff exceeds the safety injection mass flow rate and a core uncovery transient results.
The ratio of core power to the safety injection mass flow rate for the reference plant is 81.814 (MW/ibm/sec). For D.C. Cook Unit 2 in the current design basis configuration, one HHSI pump and one charging pump inject through four lines. The core power to safety injection mass flow rate is 65.345 (MW/ibm/sec). If a small break LOCA FSAR analysis were performed for D.C. Cook Unit 2 the results would be less limiting than the result of the FSAR NOTRUMP analysis performed for the reference plant. Hence the reference four loop plant used in the NOTRUMP analyses is expected to provide a representative thermal hydraulic response to a small break LOCA for variations in the safety injection flow for D.C. Cook Unit 2.
Page 4 of 10 SMALL AK C Y S A small break LOCA analysis was performed for the reference plant applying the limiting four-inch equivalent diameter cold l'eg break for the D.C. Cook Unit 2 licensing basis WFLASH analysis. The analysis assumed a safety injection flow rate representative of the HHSI flow configuration at D.C. Cook Unit 2 during a recent License Event Report (LER) in which two charging pumps were available to deliver flow through four lines and one HHSI pump was available to deliver flow through two of four lines. D.C. Cook Unit 2 issued the LER for operation in Mode 1 (at 804 full power) with one HHSI pump removed from service and the cross tie line closed. Closure of the cross-tie line did not meet the design basis small break LOCA analysis assumption of HHSI flow delivery to all four loops.- The analysis was performed at 1024 of the reference plant licensed core power assuming a fission product decay heat generation rate of 1.2 times the 1971 ANS Decay Heat values. In order to support the operation of D.C. Cook Unit 2 with two charging pumps and one HHSI, the loss of offsite power without the single failure of a diesel to start was assumed. It was conservatively assumed that all safety injection flow delivered to the broken loop spilled out the break. The analysis was performed to determine the effect on plant response for a change in the SI flow assumption, thereby establishing a safety injection sensitivity for a plant similar in design to D.C. Cook 2. The reference plant analysis was performed using the Westinghouse NRC approved small break LOCA ECCS evaluation model using the NOTRUMP code as described in WCAP-10054-P-A and WCAP-10079-P-A. NOTRUMP addresses all of the NRC concerns expressed in NUREG-0611 and meets the requirement of NUREG 0737 II.K.3.30. The analysis resulted in a PCT of 1132 F, thereby illustrating that operation in the flow configuration in which one charging pump is available to deliver flow to four RCS loops and one HHSI pump is available to deliver flow to only two of four loops, does not violate the requirements of 10 CFR 50.46.
4
'i
Page 5 of 10 The reference four loop plant FSAR analysis was performed at .1024 of a licensed core power level of 3338 MWt with a core peaking factor of 2.4 and resulted in a PCT of 1244 F for the limiting four inch break.
The analysis performed to determine the SI sensitivity employed the same assumptions as the reference plant FSAR analysis with the exception of the safety injection flow delivery flowrates. Table 5 provides the number of safety injection pumps, the number of lines, available to deliver flow to the RCS and the spilling assumptions utilized in the analyses and the evaluation. The safety injection flow vs. pressure curve assumed in the reference four loop plant FSAR analysis is shown in figure 11. This may be compared to the safety injection flow assumed for the sensitivity analysis. The safety injection flows for the proposed HHSI ECCS design basis operation with closure of the cross tie connection is also shown in figure 11.
Table 3 provides a comparison of the reference plant analyses assumptions to the D.C. Cook Unit '2 FSAR analysis assumptions.
The four inch break'for the NOTRUMP analysis employing SI flows used in the sensitivity analysis is characterized by a rapid primary side depressurization to a pressure slightly above the steam generator secondary safety valve setpoint. Steam generator secondary side pressurization to the. safety valve setpoint results from the loss of off-site power assumption. RCS inventory depletion results in'steam venting through the pump suction leg loop seal in the broken loop at approximately 356 seconds. This permits steam generated in the core to exit through the break, resulting in continued RCS depressurization.
Since the core boiloff rate exceeds the safety injection flow rate, core uncovery results. Accumulator injection, which reverses the net mass inventory depletion from the RCS, occurs when the RCS pressure decreases to approximately 600 psig. The safety injection pump performance'nterval of interest therefore extends from approximately 1000 psig to the accumulator actuation pressure.
Table 4 provides a comparison of the results for the D.C. Cook Unit 2 original FSAR analysis to the reference plant analyses. The results reported for Cook Unit 2 reflect the original MFLASH analysis specific
Page 6 of 10 to D,.C. Cook Unit 2. A footnote has been provided-which reports the results of the small break analysis performed to determine the effects of a reduction in Safety Injection Flow if the assumed HHSI miniflow is increased from 30 gpm to 60 gpm. The miniflow analysis was specific.to D. C. Cook Unit 1 and was determined to bound operation of D.C. Cook Unit 2 with the increase in HHSI miniflow. This analysis was used to support the D.C. Cook Unit 2 license amendment for an increase in HHSI miniflow from 30 gpm to 60 gpm. All references to the D.C. Cook Unit 2 current design basis SI flows assume the SI available with a HHSI miniflow of 60 gpm.
Figures for the reference plant analyses have been provided to illustrate the influence of the change in safety injection flow rate'on the pertinent parameters identifying the plant response to the small
. break LOCA. Figure 1 shows the depressurization transient for the two reference plant analyses for the pressurizer pressure. Comparison of the two depressurization transients indicates that the change in the safety injection flow rates has very little influence on the system depressurization between the two analyses. Slight differences are apparent after the time of the pump suction loop seal clearing and are primarily due to the differences in the rate of core boiloff to safety injection flow delivery between the'wo cases. Figures 2 and 3 represent the broken loop and intact loop secondary side steam pressure response during the transient respectively. Comparison of the response for the two analyses shows that they are essentially identical prior to loop seal venting indicating that the amount of primary decay heat removal via the steam generator- secondaries is approximately the same
,in the two cases. Figure 4 shows the core mixture level which illustrates the major effect of the change in the amount of total safety injection flow available in the two transients. A comparison of the uncovery transient of the two analyses shows that the reference FSAR case, which has less safety injection flow available than the SI sensitivity case prior to accumulator injection, experiences a deeper core uncovery of slightly longer duration. Figure 5 represents the pumped safety injection flow for the two cases. Figure 6 represents
Page 7 of 10 the accumulator flow for the two cases. The time of initial accumulator injection is slightly delayed in the SI sensitivity case due to the delay in loop seal steam venting resulting from the increased safety injection mass flow rate. However, the initial delivery of accumulator water in conjunction with the higher safety injection flows is sufficient to initiate a rapid core recovery and a higher degree of subcooling which results in additional accumulator delivery earlier in the SI sensitivity case. Figure 7 provides a comparison of the total break flow for the two cases. In the SI sensitivity case a greater amount of safety injection flow to the intact loop will travel around the downcomer and flow into 'the broken loop cold leg causing a higher degree of subcooling. The change in enthalpy resulting from the subcooled fluid injection to the broken loop cold leg results in a slightly higher liquid break flow rate from 250 to-375 seconds. After loop seal clearing, the two cases show essentially identical break flow behavior.
These figures show that the change in the available safety injection water has a negligible impact on the depressurization transient, the secondary side pressure response 'and the break flow rate. The net effect of safety injection flow differences on small break LOCA response is in the depth and duration of the core uncovery transient.
The effect of the reduction in SI flow on the plant response to a small break LOCA resulting from the proposed design basis change would therefore be to slightly increase the depth and duration of core uncovery. The increase in PCT resulting from the additional core uncovery can be estimated from the sensitivity obtained from the reference plant analyses'.
The peak clad temperature and the peak fuel (pellet) temperature results for the two reference plant analyses are presented in figure 8 and figure 9 respectively.'n figure 8 the clad average temperature for the hot rod of the reference plant FSAR analysis is compared to the hot rod clad average temperature of the SI sensitivity analysis. The
Page 8 of 10 results confirm that the case with the higher power to SI flow ratio will result in a more limiting PCT. The clad average temperature in the hottest rod is determined assuming the power in the hottest rod to be equal to the Peak Linear Power (Peaking Factor
- Avg. Linear Power). Clad heat up calculations specific to D.C. Cook 2 would result in slightly lower PCT's since the D.C. Cook 2 Peak Linear Power is limited by the large break LOCA F~. Figure 9 shows a comparison of the fuel pellet average temperature in the hottest fuel rod for the two cases. The pellet average temperature for both cases displays the same behavior throughout the transient as the corresponding clad average temperature with slightly higher temperature peaks than the clad average temperature.
Figure 10 provides a comparison of the D.C. Cook Unit 2 current design basis safety injection flow rates to the safety injection flow rates which would be assumed available in the small break LOCA analysis under the proposed design basis change. The effect of these safety injection flow changes on the small break LOCA peak cladding temperature will be determined from the safety injection flow sensitivity obtained from the reference plant analyses. In Figure 11 the reference plant analyses safety injection delivery rates are compared to the design basis change safety injection flow rates which consider the flow reduction from the cross tie closure. An evaluation of the effect of the proposed design basis change safety injection flows on a D.C. Cook Unit 2 small break LOCA analysis will be performed by establishing the sensitivity of peak clad temperature to variations in safety injection flow from the reference plant analyses.
The effect of the difference in licensed core power between the reference plant and D.C. Cook Unit 2 has been examined and has been shown to have only a small effect on the small break LOCA PCT. The total core power level in conjunction with the safety injection flow rate determines the rate of core boiloff steam production following a
Page 9 of 10 small break LOCA. The reactor coolant system thermal-hydraulic response to a small break LOCA, as calculated by the NOTRUMP code, is then dependent upon the ratio of the core power to safety injection flow rate. This ratio for the reference plant at the representative pressure of 1114.7 psia for the design basis change SI flows has been determined to be 98.118 (MW/ibm/sec) . At the D.C. Cook Unit 2 licensed core power level of 3411 MWt for the same safety injection flow, the ratio of power to SI flow is determined to be'00.26 (MW/ibm/sec).
This indicates that any change in the core uncovery transient between the two cases would be negligible. In addition, the reference case analyses used to determine the sensitivity of PCT to SI flow changes were performed for =a core peaking factor (F~) of 2.4. Hence, the hot rod clad heat up calculations were performed assuming a peak linear power higher than D.C. Cook Unit 2. The effect of the slightly higher
'power to SI flow ratio for D.C. Cook Unit 2 is compensated for in the hot rod clad heat up calculations. The direct sensitivity of PCT to SI flow changes obtained from the reference plant analyses is therefore applicable to D.C. Cook Unit 2 and the evaluated PCT will be representative of a D.C. Cook Unit 2 small break LOCA FSAR analysis.
I A relationship can be established between the change in Peak Clad Temperature and the change in the total (integrated) safety injection flow delivered from break initiation until accumulator actuation for the two NOTRUMP analyses. This relationship may then be used to determine the Peak Clad Temperature which would result from a small break LOCA analysis with the safety injection delivery rates available with the HHSI cross tie line closed. The sensitivity established from the two analyses was determined to be (Delta PCT)/(Delta Total SI Flow Delivered) = -0.0162 F/ibm Using this relationship and applying a conservative calculation of the integrated amount of safety injection flow which would be delivered in
Page 10 of 10 a small break LOCA analysis when the HHSI cross tie is assumed closed, an FSAR grade NOTRUMP calculation for D.C.Cook Unit 2 is estimated to result in a PCT of approximately 1482 F. This estimate is based on the total amount of safety injection which would be available during the small break LOCA transient assuming that charging flow delivery from one pump is available to four lines with one line spilling to RCS pressure, and that HHSI flow delivery from one pump is 'available to only two of four lines with one line spilling to RCS pressure. The integrated amount of safety injection flow for the design basis change evaluation was calculated assuming the depressurization transient of the reference plant analysis. As shown in figure 1, a change in safety injection flow delivery (in the ranges being considered) has an insignificant effect on the depressurization of the RCS, hence it is.
appropriate to assume the depressurization of the reference plant analysis for the determination of the total safety injection delivered in a small break LOCA analysis applying the proposed design basis change SI flows. In this estimate the HHSI system cross-tie is assumed to be closed, but both HHSI pumps are assumed to be available to deliver flow to two cold legs. However, one train of safety injection flow is assumed to be lost due to the loss of off-site power and the failure of a diesel to start.
CONCLUSION Applying the sensitivity to safety injection flow changes developed for a plant similar in design to D.C. Cook Unit 2, an estimate of the Peak Cladding Temperature which would be obtained from a small break LOCA analysis assuming a reduction in safety injection flow as a result of the HHSI system cross tie valve closure can be obtained. The estimated PCT assuming HHSI cross tie closure and the single failure of a diesel generator to start when all ECCS pumps are available was estimated to be approximately 1482 F. This indicates 'there is significant margin to the 2200 F limit of 10 CFR 50.46 for the operation of D.C. Cook Unit 2 at a licensed core power of 3411 MWt with the High Head Safety Injection System cross tie connection closed.
4 '
0 oo U ts v Com o e ts ra o efe ence 412 VESSEL:
Upper Support Plate Top Hat Top Hat Barrel Baffle Conf. Downflow Downflow Downcomer Shielding Thermal Thermal Shield Shield Lower Support Plate Curved Curved Fuel Array 17X17 17X17 Upper Head Spray 0.15% 0.21%
Flow Percent Upper Head Temp. THOT THOT LOOP COMPONENTS:
Pressurizer 1800 1800 Steam Generator Model 51 Model 51 Pump Type 93A 6000'Hp 93A 6000 Hp
t hl
TABLE 2 LANT ON ONS 83&METERS FERENCE 412 LICENSED POWER 3411 3338 (MWt)
LICENSED PEAKING FACTOR 2 '0 2.40 FUEL VOLUMETRIC HEAT 9834.46 9624.0 GENERATION"FOR TOTAL CORE (TOTAL KW/TOTAL FT FUEL)
AVERAGE LINEAR HEAT 5.554 5.435 GENERATION (KW/FT)
PEAK LINEAR HEAT 11.663 13.043 GENERATION (KW/FT)
TOTAL FLUID VOLUME IN CORE 613.0 612. 9 (FT )
THERMAL DESIGN FLOW 37388.9 36916.7 (LBS/SEC.)
VESSEL EXIT TEMPERATURE 606.4 608.0
( F)
VESSEL INLET TEMPERATURE 541.3 542.2
(~F)
TABLE 3 L S S IONS COOK 2 REFERENCE 412 ARAMETERS IS ANALYSES LICENSED CORE POWER, 3391 MWt 3338 MWt 1024 OF PEAK LINEAR HEAT 12. 81. KW/FT 13. 043 KW/FT GENERATION AVG. LINEAR HEAT 5 ~ 521 KW/FT 5.435 KW/FT GENERATION TOTAL CORE PEAKING'ACTOR, 2.32 2.40 Fg FUEL TYPE 17X17 STD. 17X17 STD WESTINGHOUSE WESTINGHOUSE SMALL BREAK MODEL WFLASH NOTRUMP
L B A S SU COOK UNIT 2 REFERENCE 412 REFERENCE 412 RESULTS SENSITIV TY SMALL BREAK MODEL WF LASH NOTRUMP NOTRUMP PEAK CLAD TEMPERATURE 1668 F* 1244 F 1132 F PEAK CLAD TEMPERATURE 11.25 12. 0 12.0 LOCATION (FT.)
TIME OF PCT (SEC.) 913 991 1007 REACTOR TRIP (SEC.) 17.32 4.18 4. 18 CORE UNCOVERY TIME 413 0
~ 704.0 709.5 (SEC)
ACCUM. INJECTION (SEC-) 875;0 919.0 932.0
'CORE RECOVERY TIME 1650 1168 1168 (SEC. )
- The results of the small break LOCA analysis specific to D.C. Cook N
Unit 1 used to support the amendment to the D.C. Cook Unit 2 operating license for an increase in HHSI miniflow from 30 gpm to 60 gpm report a PCT of 1716 F.
Table 5 J CTION T G ZON CO PAR SO m s vai ab e 'nes Available Lines S illin REFERENCE PLANT 1 CHARGING INJ. TO 4 LINES 1 LINE SPILLS FSAR ANALYSIS 1 HHSI INJ. TO 4 LINES 1 LINE SPILLS D.C. COOK UNIT 2 1 CHARGING INJ. TO 4 LINES 1 LINE SPILLS ORIG. FSAR ANALYSIS 1 HHSI INJ. TO 4 LINES 1 LINE SPILLS REFERENCE PLANT SI 2 CHARGING INJ. TO 4 LINES 1 LINE SPILLS SENSITIVITY ANALYSIS 1 HHSI INJ. TO 2 LINES 1 LINE SPILLS D.C. COOK UNIT 2 1 CHARGING INJ. TO 4 LINES 1 LINE SPILLS PROPOSED DESIGN 1 HHSI INJ. TO 2 LINES 1 LINE SPILLS BASIS MODIFICATION
Reference Pour-Loop NOTRUMP SI Sensitivity Reference Pour-Loop PSAR NOTRUMP
>> elKiN
~ lK~
p.tv~
6 ~ 1AM
~ ICM CNo ~ IC'H el 1lNK ISKCI REFERENCE 4-LOOp NOTRUNp FSAR SX FLOWS vs. SI SENSITIVITY FLOWS Figure 1
Reference Pour-Loop NOTRUMP SI Sensitivity I
Reference Pour-Loop FS'AR NOTRUMP
~ IIR'N
~ IlC'H c,le'N
~ IC44 W.
Mo ~ lC+N elÃ'N lllI: I SCC I REFERENCE 4-LOOp NOTRUMP FS~ SI PQ)WS vs. SI SENSITIVITY FLOW Figure 2
<< Reference Pour-Loop NOTRUMp SI Sensitivity Reference Four-Loop FSAR NOTRUMP
~ I IL+$4
~ lSK+H
~ lfiH
<<a
~0 Wo ~ Mo ~ ~ ~ IÃ'H IIIC lSCC I REFERENCE 4-LOOP NOTRUMP PSAR SI FLOWS vs, SI SENSITIVITY FLOWS Figure 3
Reference Four-Loop NOTRUMP SI Sensitivity Reference Four-Loop FSAR NOTRUMP Ne
~e TOP OP,HOT LEG gee I BOTTOM OP'OT LEG gee K
f ae.
TOP OP CORE ONe ~ I(e ~ I ~ N 1IIC ISCCI REFERENCE 4-LOOP NOTRUMP FSAR SI FIDWS vs. SI SENSITIVITY FLOWS Figure 4
Reference Pour-Loop NOTRUMP SI Sensitivtiy Reference Four-Loop PSAR NOTRUMP' ll
~a r~
5 Qo /
B RAo ga fr.
%No ~ I 'N ~ 'H lllC I SCC I REFERENCE 4-LOOP NOTRUMP FSAR SII PAWS vs. SI SENSITIVITY PLOWS Figure S
Reference Four-Loop NOTRUHP SI Sensitivity Reference Four-Loop PSAR NOTRUMP
)I I
IS.
~.
M<< W<< ~ I <<N <<IX<<N lIIC I SCC I REFERENCE 4-Loop NOTRUNp FSAg gZ Frpws vs, SI SENSITIVITY FMWS Figure 6
Reference Four-Loop NOTRUMP SI SENSITIVITY FLOWS ReferenCe Four-Loop 'FSAR NOTRUMP
~ %44
~.ncaa
~ !CM 4No N ~ Mo ~ IC'H ~ I ~N lllC l%KC I REFERENCE 4-LOOP NOTRUMP FSAR SI FLOWS vs. .Sl SENSITIVITY FLOWS Figure 7
Reference Four-Loop NOTRUMP SI Sensitivity Reference Four-Loop FSAR NOTRUMP
~ ISN'T 5
~ SSo ISA'SD 100m 75to 10$ o l50o ~Ill %0e ISCCI lOCOo 105!e I ICQo Il&o ltOIo REFERENCE LOOP NOTRUNp FSAR SI FLOWS vso SI SENSITIVITY FLOWS Figure 8
Reference Four-Loop NOTRUMP SI Sensitivity Reference Pour-Loop FSAR NOTRUMP
~ uua RMo ISNo Lo ply.
C
~ SOo 1Ne ne. sac. eso. ea. ~a. <ear. we. I ra. nso. ea.
flK ISCCI REFERENCE 4 XDOP NOTRUMP FSAR SI'I FXDWS vs o SI SENSITIVITY FLOWS Figure 9
Figura 10 110. 0 ORIG FSAA SI D. C. CON UNIT 2 SI FLOMS
.XTIK CLSD SISI DESIGN BASIS FLOM VS X-TIE CLOSED SI 100.0 80.0 M
UJ Cll CO 60.0 Cl 70.0 60.0 C I
50.0 4 40.0 30.0 20.0 0,0 200.0 400.0 600.0 800.0 1000.0 1200.0 1400.0 PRESSNE O'SIA)
Figure ii i20.0 CLOSED X-TIE SAFETY INJECTION FLOE CNPARISQN REF. ANALYSIS SI VS. X-TIE CLOSE SI REF.FEAR SI -- --
REF.SI SESS iio.o i00.0
$ 0.0 i g
(
80.0
'C'0.0 60.0 50.0 40.0 30.0 20.0 0.0 200.0 400.0 600.0 800.0 i000.0 i200.0 1400.0 PRESSURE gate) to AEP:NRC:1024 Information Notice 87-01
~ JAII [ 4 gy CC: M. P. Alexich SSINS No.: 6835 T. 0. Argenta IN 87-01 S. J. Brewer J. H. Cleveland UNITEO STATES C. A. Erikson NUCLEAR REGULATORY COMMISSION J. G. Feinstein OFFICE OF INSPECTION AND ENFORCEMENT P.. F. Kroeger WASHINGTON, D.C. 20555 J. J. Harkowsky J. B. Shinnock January 6, 1987 D. H. williams, Jr.'ohn 3AM 15 f987 E. Dolan IE INFORMATION NOTICE NO. 87-01: RHR VALVE MISALIGNMENT CAUSES OEGRAOATION OF ECCS IN PWRS Addressees:
All pressurized-water reactor facilities holding an operating license or a construction permit.
~Pur ose:
This information notice is provided as notification of a potentially signifi-cant problem pertaining to residual heat removal (RHR) valve alignment in the low-pressure emergency core cooling system (ECCS). It is expected that recip-ients will review the information for applicability to their facilities and consider actions, if appropriate, to preclude a similar problem this from occurring information notice at their facilities. However, suggestions contained in do not constitute NRC requirements; therefore, no specific action or written response is required.
Oescri tion of Circumstances:
In late May 1985, plant operators at Callaway isolated the RHR crossover line (by closing the normally open valves Xl or X2 in Figure 1 on the next page) to perform an operability test of train A of the low-pressure ECCS. This action would allow the B train to feed only two reactor coolant system (RCS) loops.
When an NRC inspector questioned the advisability of this configuration, the licensee requested technical assistance from Westinghouse. Westinghouse indicated that the licensing bases for the ECCS analysis assume that all four RCS cold legs are being supplied water from at least one RHR pump. Isolation of the crossover line to place the A train in the test condition violated this analysis assumption. At this facility, however, the degraded configuration was never in existence for longer than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Subsequently, Byron Unit 1 identified numerous occasions in 1985 when the RHR system would have been capable of injection to only two RCS loops.
8612300151
IN 87-01 January 6, 1987 Page 3 of 3 No specific action or written response is required by this information notice.
If you have any questions about this matter, please contact the Regional Admin-istrator of the appropriate regional office or this office.
edward L. Jordan, Director Oivision of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement Technical
Contact:
Mary S. Wegner, IE (301) 492-4511
Attachment:
List of Recently Issued IE Information Notices to AEP:NRC:1024 I.E. Inspection Report 86042 Unit 1 and Unit 2 LERs