Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903462005-04-0606 April 2005 March 2005 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0508105872005-03-14014 March 2005 February 2005 Monthly Operating Report for Nine Mile Point Units 1 & 2 ML0506100272005-02-10010 February 2005 January 2005 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0502501772005-01-15015 January 2005 December 2004 Monthly Operating Report for Nine Mile Point Nuclear Station Unit 1 and Unit 2 ML0500403092004-12-14014 December 2004 November 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0432804222004-11-10010 November 2004 October 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0430102542004-10-14014 October 2004 September 2004 Monthly Operating Report for Nine Mile Point Unit 1 & Unit 2 ML0426702542004-09-0808 September 2004 August 2004 Monthly Operating Report for Nine Mile Point Unit 1 & 2 ML0423802722004-08-11011 August 2004 July 2004 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0420403172004-07-0606 July 2004 June 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0417406502004-06-0909 June 2004 May 2004 Monthly Operating Report for Nine Mile Point Units 1 & 2 ML0414602662004-05-12012 May 2004 April 2004 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0410604032004-04-0808 April 2004 March 2004 Monthly Operating Report for Nine Mile Point, Units 1 & 2 ML0407806092004-03-0808 March 2004 February 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0405503812004-02-11011 February 2004 January 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0402107342004-01-12012 January 2004 December 2003 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0335705112003-12-10010 December 2003 November 2003 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0332503272003-11-13013 November 2003 October 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0332503292003-11-10010 November 2003 October 2003 Monthly Operating Reprt for Nine Mile Point Unit 2 ML0329701142003-10-10010 October 2003 September 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0330103602003-10-0707 October 2003 September 2003 Monthly Operating Report for Nine Mile Point, Unit 1 ML0326610802003-09-11011 September 2003 August 2003 Monthly Operating Report Nine Mile Point Unit 2 ML0326600272003-09-0909 September 2003 August 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0323304142003-08-12012 August 2003 July 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0323202902003-08-0707 August 2003 July 2003 Monthly Operating Report for Nine Mile Point, Unit 2 ML0320400322003-07-0808 July 2003 June 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0320400302003-07-0808 July 2003 June 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0317505882003-06-12012 June 2003 May 2003 Monthly Operating Report for Nine Mile Point, Unit 1 ML0317505872003-06-11011 June 2003 May 2003 Monthly Operating Report for Nine Mile Point, Unit 2 ML0314204912003-05-12012 May 2003 April 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0311300102003-04-0909 April 2003 March 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0311300082003-04-0909 April 2003 March 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0308605002003-03-13013 March 2003 February 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0308605052003-03-12012 March 2003 February 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0305604912003-02-12012 February 2003 January 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0305605962003-02-10010 February 2003 January 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0302307132003-01-10010 January 2003 December 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0302307102003-01-10010 January 2003 December 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0236003192002-12-12012 December 2002 November 2002 Monthly Operating Report for Nine Mile Point, Unit 1 ML0236002952002-12-0505 December 2002 November 2002 Monthly Operating Report for Nine Mile Point, Unit 2 ML0232404532002-11-0808 November 2002 October 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0233101182002-11-0707 November 2002 October 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0229603412002-10-0909 October 2002 September 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0229603452002-10-0707 October 2002 September 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0226900422002-09-12012 September 2002 August 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0226900512002-09-0606 September 2002 August 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0223800522002-08-0909 August 2002 July 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0223800322002-08-0606 August 2002 July 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0221202032002-07-17017 July 2002 June 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0221201772002-07-15015 July 2002 June 2002 Monthly Operating Report for Nine Mile Point Unit 1 2005-04-06
[Table view] |
Text
NRC FOAM 395 U.S. NUCLEAR REGULATORY IISSION DOCKET NUMBER
'PI1 IW.TO> P 50-220 FILE NUMBER NRC DISTRIBUTION FoA PART 60 DOCKET MATERIAL MONTIILY REPORT FROM: DATE OF DOCUMENT Niagara Mohawk Power Corp. 9 3 76 N R, C, Syracuse, New York DATE RECEIVED R. R.'chneider 9 4 7
@LETTER QNOTOR IZED PROP INPUT FOAM NUMBER OF COPIES RECEIVED P4) A I G IN AL PfVNC LASSIF IED One signed QCOPY DES C AI P TI 0 N ENCLOSURE LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR Au ust/1976 PLANT Ec COMPONENT OPERABILITY 6 AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS 6 OPERATIONS'LANT (1-P) (3-P), (KCKgPgg@IIGF>
NAME:
Nine Mile Point 8l
>P NPT REMPVZ I
fOR ACTION/INFORMATION 9 14 76 RJL CYS FO AC ON INTERNAL DISTRI BUTION PD BRANCH CHIEF L Lear EXTERNAL OISTR I BUTION (.ONTROL NUMBLR 13Dlli 0 we o N Y.
~
NAC FOAM IOII ('J 7II)
~ e ~ ~
~ ~ ~
4
t gaEIIjamIOPI aa~~ ~
I)@'RA
,.. ~I:,....
MOHAWK POWER CORPORATIO 300 ERIE BOULEVARD, WEST O'P<
/
SYRACUSE. N. Y. 13202 Sepkembn 3, 19
,4~
Ofhce o$ PLuu 8 Schedules NAmtotcate o( LicenhLng Oersted S~u NucL~ Regulatory ConnLw~on Olabkmgkon, 9.C. 20545 RE: 'Dock& No. 50-220 Ge+CEemen:
Sub~ed hneeith m Ch,e Oping S~ RepoM Jot'he moeth o$ Aught, 1976 Joe Che one (KCe Po~ Nunks~
S~on OnLt'1.
Veep ~y go~,
chnmdn Vice PcuLdmt' ELmtru'.c Pcodu~on TJO/mmmm Enc,.
CERTIFIED MAIL RETURN RECEIPT
IP P
'J
NXNB H E POXNT NUCLEAR STATXOtI NXAG HAM% PO4ER CORPOKXTX03 AVERAGE DAILYUYtlT POOVE'R LEYEL E~
DOCK.ET NO. Sd 220 UNIT D
COMPLETED BY T. J. Perkins TELEPHOiCE
~IOyTH Au ust 1976 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAIK.YPONER LvVER.
'iXDY~Xi'et)
(MWe-.Net) 512 17 353 1
18 57 377 20 461 498 503 60 23 516 24 621 25 10 532 'S 523 27 531 28 524 13 30 529 31 521 532
/cjw
NE NILE POXN'f NUCLEAR STATXOi~
NXAGAM ~i(0)iAMK POWER COP'590f XON OPERAT)NG DATA REPORT DOCKET NP. 50 - 220 UNIT DATE Se tember 1 1976 CP(~~)PLETEP gy T. J. Perkins TELEPHONE 315) 343-2110 ext. 1312 OPERATING STATUS REPORTING PERIOD 760801-760831 GROSS HOURS IN REPORTING PERIOD: 744 CIIRRERTLY AD'PRQRIZED PC(VER LEVEL (LP(did MAR. DEP RD. CAPACITY ( IPA'P IPI): 610
- 3. PO'EYER LEVELTO WHICH RESTRICTED (IF ANY) (IfiVlc-Nei):
4I. REASONS FOR RESTRICTION (IF ANY):
THIS b10iUTH YR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAI 715. 8 5 068;8. "42,906 ~ 3
- 6. REACTOR RESERVE SHUTDOWN HOURS 291. 8. 1 138. 1
- 7. HOURS GENERATOR OiN LINE K.6 4 927.2 40 706.3
&. UNIT RESERVE SHUTDOWN HOURS
- 9. GROSS THERMAL ENERGY GENERATED (MWH)
- 10. GROSS ELECTRICAL ENERGY GENERATED (iYIWH) .
.....,........ ~~ 20.2 20.2 8, 158,089 6'4,372,635 2 649 829 21 142 932 11 NH ELECTRICAL ENERGY GENERA'TED (iYiWH) 348,687 2,567,799 20,485,893
- 12. REACTOR SERVICE FACTOR . 96.2 86.6 71.6 100 96.7 "- 73.5
- 13. REACTOR AVAILABILITY FACTOR ~ ~ ~
141. UNIT SERVICE FACTOR 84.2 68.0
- 15. UNIT AVAILABILITYFACTOR 93.6 85.0 68.0
- 16. UiNIT CAPACITY FACTOR (Using MDC) 76.8 71.9 56.1
- 17. UNIT CAPACITY FACTOR (Using Design I(II(Ye) 71.9 56.1
- 18. UNIT FORCED OUTAGE RATE 13.3 13.0
- 19. SHUTDOWNS SCH DULED OVER NEXT 6 I'10(XTHS (TYPE, DATE, AND DURATIOiN OF EACPI)s
- 20. IF SHUT DOlYN AT LND OF REPORT PF RIOD, ESTIMATED DATE OF STARTUP:
/cjw
4 t
NINE MILE POINT NUCLEAR STATION N IAGAIVi MOHAWK POHER CORPORATION DOCKET NO. 50 220 UNIT SHUTDOWNS AND POWER REDUCTIONS HtllT N NH DATE Se tember 1 6 COMPLETED BY ~ ~- rki REPORT MONTI.I A >
THLL HHN ' t. '1312 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POSER (2) . CORRECTIVE ACTIONSi'COMMENTS 8 8/6/76 22.6 -A Generator trip due to malfunction of field ground test switch.
8/17/76 24.8 While testing turbine stop valves, turbine
'tripped due to faulty limit switches.
(I) REASON A: I:.QUIPMEN'f I'AILURE(EXPLAIN) (2) hiETHOD D: hiAINT. OR TEST 1: MANUAL SUI'IMARY: Turbine output {therefore reactor C: REI'UELINC 2: hiANUALSCRAM.
D: Rl'.CULATOI<YRESTRICTION 3: AUTOMATlCSCRAM output) limited due to high lake I;: OPERATOIC:f RAINING AND 4; OTHER (EXPLAIN) temperature {condenser cooling inlet)
LICENSI'. I'.XAhliNA'fION causing higher than normal turbine back I'l ADhilNlS'I'RATIVL':
pressure.
/cgw OPi',IIATIONALERROR ()EXPLAIN)
Ill O'I'llVR <I XI'LAIN)
r