P.O. Box 63 Lycoming, New York 13093 Constellation Generation CkoW Nine Mile Point Nuclear Station August 6, 2002, NMP2L 2069 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69

Subject:

Monthly OperatingReportfor July 2002 Gentlemen:

Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for July, 2002.

Very truly yours, Michael F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2

SUMMARY

OF OPERATING EXPERIENCE of 101.2% and an availability factor of Nine Mile Point Unit Two operated with a capacity factor (MDC) 100% for the month of July, 2002.

initiated to support repair of minor leaks On July 27, 2002, at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />, a planned power reduction was repair was performed while the unit was maintained in the second point feedwater heater drain line. A Furmanite leak of the leak repair, full power operation was resumed at approximately 76% power. Following satisfactory completion on July 27, 2002 at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />.

reporting period.

There were no challenges to the safety relief valves during this

OPERATING DATA REPORT DOCKET NO. 50410 DATE: 08/01/2002 COMPLETED BY: T. P. McMahon TELEPHONE: (315) 3494045 OPERATING STATUS Unit Name: Nine Mile Point Unit #2 July 2002 Reporting Period.

1,143.3

1. Design Electrical Rating (MWe) 1,119.8
2. Maximum Dependable Capacity (Net MWe)

This Month Yr-to-Date Cummulative 744.0 4,363.2 99,566.5

3. Number of Hours Reactor was Critical: 96,692.0 744.0 4,311.1
4. Hours Generator On-Line: 0.0 0.0 0.0
5. Reactor Reserve Shutdown Hours: 100,943,821.6 843,097.0 4,885,488.9
6. Net Electrical Energy Gen. (MWH)

DOCKET NO: 50-410 UNIT SHUTDOWNS UNIT NAME: NMP#2 DATE: 08/01/02 APPENDIX B Prepared by: T. McMahon REPORTING PERIOD - JULY 2002 TELEPHONE: (315) 349-4045 Method:

Reason: 1-Manual A-Equipment Failure (Explain) 2-Manual Trip/Scram B-Maintenance or Test 3-Automatic Trip/Scram C-Refueling 4-Continuation D-Regulatory Restriction 5-Other (Explain)

E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain)