P.O. Box 63 Lycoming, New York 13093 Constellation Generation CkoW Nine Mile Point Nuclear Station August 6, 2002, NMP2L 2069 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
Subject:
Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Monthly Operating Report for July 2002 Gentlemen:
Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for July, 2002.
Very truly yours, Michael F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2
SUMMARY
OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 101.2% and an availability factor of 100% for the month of July, 2002.
On July 27, 2002, at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />, a planned power reduction was initiated to support repair of minor leaks in the second point feedwater heater drain line. A Furmanite leak repair was performed while the unit was maintained at approximately 76% power. Following satisfactory completion of the leak repair, full power operation was resumed on July 27, 2002 at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />.
There were no challenges to the safety relief valves during this reporting period.
OPERATING DATA REPORT DOCKET NO.
DATE:
COMPLETED BY:
TELEPHONE:
50410 08/01/2002 T. P. McMahon (315) 3494045 OPERATING STATUS Unit Name:
Reporting Period.
- 1. Design Electrical Rating (MWe)
- 2. Maximum Dependable Capacity (Net MWe)
- 3. Number of Hours Reactor was Critical:
- 4. Hours Generator On-Line:
- 5. Reactor Reserve Shutdown Hours:
- 6. Net Electrical Energy Gen. (MWH)
Nine Mile Point Unit #2 July 2002 1,143.3 1,119.8 This Month 744.0 744.0 0.0 843,097.0 Yr-to-Date 4,363.2 4,311.1 0.0 4,885,488.9 Cummulative 99,566.5 96,692.0 0.0 100,943,821.6
UNIT SHUTDOWNS APPENDIX B REPORTING PERIOD - JULY 2002 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain)
DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 08/01/02 Prepared by: T. McMahon TELEPHONE: (315) 349-4045 Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)