October 2003 Monthly Operating Reprt for Nine Mile Point Unit 2
ML033250329
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/10/2003
From: Hopkins L
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L 2106
Download: ML033250329 (4)


Text

P.O. Box 63 Lycoming, New York 13093 AdrvhL Constellation Energy Group Nine Mile Point Nuclear Station November 10, 2003 NMP2L 2106 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Nine Mile Point Unit 2 Docket No. 50-410; NPF-69 Monthly Operating Report for October 2003 Gentlemen:

Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for October 2003.

Very truly yours, DL Mo tL>

Lawrence A. Hopkins Plant General Manager LAHAJm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Z'4

ATTACHMENT A OPERATING DATA REPORT DOCKET NO.

DATE:

COMPLETED BY:

TELEPHONE:

50-410 11/04/2003 T. P. Mchlahon (315) 3494045 OPERATING STATUS Unit Name:

Reporting Period:

1. Design Electrical Rating (MWe)
2. Maximum Dependable Capacity (Net MWe)
3. Number of Hours Reactor was Critical:
4. Hours Generator On-Line:
5. Reactor Reserve Shutdown Hours:
6. Net Electrical Energy Gen. (MWH)

Nine Mile Point Unit #2 October 2003 1,143.3 1,119.8 This Month 745.0 745.0 0.0 854,191.9 Yr-to-Date 7,012.0 6,984.6 0.0 7,897,013.3 Cumulative 109,795.0 106,840.9 0.0 112,372,849.8

UNIT SHUTDOWNS ATTACHMENT B REPORTING PERIOD - OCTOBER 2003 DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 11/03/03 Prepared by: T. McMahon TELEPHONE: (315) 349-4045 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative C-Operational Error (Explain)

It-Other (Explain) 2 Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

ATTACHIMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 11/2/03 PREPARED BY: T. McMahon TELEPHONE: (315) 349-4045 Nine Mile Point Unit Two operated with a capacity factor (MDC) of 102.39% and an availability factor of 100% for the month of October 2003.

On October 4, 2003 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> Operations commenced lowering power to approximately 55% for a planned feed water pump swap. After completion of the feed water pump swap, full power was restored at 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br /> on October 5, 2003.

There were no challenges to the safety relief valves during this reporting period.