February 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2
ML040780609
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/08/2004
From: Hopkins L
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1819
Download: ML040780609 (3)


Text

£ P.O. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station March 8, 2604, NMP1L 1819 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Nine Mile Point Unit I Docket No. 50-220 License No. DPR-63 Nine Mile Point Unit 2 Docket No. 50-410 License No. NPF-69 MMo onthly Operating-Report for February 2004 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2004 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

Very truly yours, Lawrence A. Hopkins Plant General Manager LAH/BE/lM/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

f -6., -ZIA

I -

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-220 Nine Mile Point 1 March 08, 2004 Bruce L Eastman (315) 349-2559 February 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 613.00 565.00 This Month Yr-to-Date Cumulative

3.

Number of Hours the Reactor was Critical 696.00 1,207.57 214,039.17

4.

Number of Hours Generator On-line 696.00 1,179.23 209,416.93

5.

Reserve Shutdown Hours 0.00 0.00 20.40 6.-Net Electrical Energy Generated (MWHrs) -

429090.00-712375:00 117,09;130.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of February 2004 with a Net Electrical Design capacity factor of 100.6 percent.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1

V -

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-410 Nine Mile Point 2 March 08, 2004 Thomas McMahon (315) 349-4045 February 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,143.30 1,119.80 This Month Yr-to-Date Cumulative

3.

Number of Hours the Reactor was Critical 696.00 1,440.00 112,699.00

4.

Number of Hours Generator On-line 696.00 1,440.00 109,744.90

5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs)~

/ 747.058;00 -1;597-446.60 -- 115,640;151 ;3 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 95.85% and an availability factor of 100% for the month of February,2004. There were no challenges to the safety relief valves during this reporting period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1