February 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2
ML040780609
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/08/2004
From: Hopkins L
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1819
Download: ML040780609 (3)


Text

- £ P.O. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point March 8, 2604, Nuclear Station NMP1L 1819 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Nine Mile Point Unit I Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 onthly Operating-Report for February 2004 MMo Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2004 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

Very truly yours, Lawrence A. Hopkins Plant General Manager LAH/BE/lM/jm Attachments cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector f -6., -ZIA

I -

OPERATING DATA REPORT DOCKET NO. 50-220 UNIT NAME Nine Mile Point 1 DATE March 08, 2004 COMPLETED BY Bruce L Eastman TELEPHONE (315) 349-2559 REPORTING PERIC February 2004

1. Design Electrical Rating 613.00
2. Maximum Dependable Capacity (MWe-Net) 565.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,207.57 214,039.17
4. Number of Hours Generator On-line 696.00 1,179.23 209,416.93
5. Reserve Shutdown Hours 0.00 0.00 20.40

- 6.-Net Electrical Energy Generated (MWHrs) - 429090.00-712375:00 117,09;130.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of February 2004 with a Net Electrical Design capacity factor of 100.6 percent.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1

V-OPERATING DATA REPORT DOCKET NO. 50-410 UNIT NAME Nine Mile Point 2 DATE March 08, 2004 COMPLETED BY Thomas McMahon .

TELEPHONE (315) 349-4045 REPORTING PERIO February 2004

1. Design Electrical Rating 1,143.30
2. Maximum Dependable Capacity (MWe-Net) 1,119.80 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 112,699.00
4. Number of Hours Generator On-line 696.00 1,440.00 109,744.90
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs)~ /747.058;00 -1;597-446.60 -- 115,640;151 ;3 --

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 95.85% and an availability factor of 100% for the month of February,2004. There were no challenges to the safety relief valves during this reporting period.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)