ML023240453
| ML023240453 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/08/2002 |
| From: | Hopkins L Constellation Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMPIL 1696 | |
| Download: ML023240453 (4) | |
Text
P0 Box 63 Lycoming, New York 13093 0Constellation Nuclear Nine Mile Point Nuclear Station A Member of the Constellation Energy Group November 8, 2002 NMP1L 1696 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
-Su--bj-e~t'ct.
-Ni-nie-Mile-'Pint Uffih q
Docket No. 50-220 DPR-63 Monthly Operating Report for October 2002 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for October 2002 for the Nine Mile Point Nuclear Station Unit 1.
Submittal of this information complies with Section 6.9.1.c of the Unit 1 Technical Specifications.
Very truly yours, Lawrence A. Hopkins Plant General Manager LAH/BE/jfn-Attachments cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector
ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 11/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 OPERATING STATUS
--7-Unit Name-Nine Mile Point Unit #I-Reporting Period: October 2002 Design Electrical Rating: (Net MWe)
Maximum Dependable Capacity: (Net MWe) 613 565 Critical Hours Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 745.0 745.0 0.0 447,278.0 Yr-to-Date 7,225.7 7,193.0 0.0 4,303,508.0 Cumulative 204,247.8 199,861.2 20.4 111,334,327.0 3
4 5
6
ATTACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - OCTOBER 2002 DOCKET NO: 50-220 UNIT NAME: NMPL DATE: 11/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 (1)
Reason A.
B.
C.
D.
E F.
G.
H.
- NOTE: Sequential' Equipment Failure (Explain)
Maintenance or Test Refueling 1
Regulatory Restriction Operator Training/iUcense Examination Administrative Operational Error (Explain)
Other (Explain) nnU-9unh1
-A (2)
Method
- 1.
- 2.
- 3.
4 5
Manual I Manual Trip/Scram Automatic Trip/Scram Continuition Other (Explain)
TYPE NO.*
DATE F: FORCED DURATION REASONS' METHOD OF SHU I.IING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED I (HOURS)
DOWN2 COMMENTS No shutdown occurred in October 2002 I
nIulII*1 B
g..
ATTACHIMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 11/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 The unit operated during the month of October 2002 with a Net Electrical Design capacity factor of 97.9 percent. On October 4, 2002, power was reduced to approximately 85 percent of rated power due to maintenance activities on #14 Reactor Recirculation Pump Motor Generator controls. Also, on October 19, 2002, power was reduced to approximately 70 percent of rated power-to perform a Control Rod Sequence Exchange. There were no challenges to the electromatic relief valves or safety valves during the operating period.