MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903462005-04-0606 April 2005 March 2005 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0508105872005-03-14014 March 2005 February 2005 Monthly Operating Report for Nine Mile Point Units 1 & 2 ML0506100272005-02-10010 February 2005 January 2005 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0502501772005-01-15015 January 2005 December 2004 Monthly Operating Report for Nine Mile Point Nuclear Station Unit 1 and Unit 2 ML0500403092004-12-14014 December 2004 November 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0432804222004-11-10010 November 2004 October 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0430102542004-10-14014 October 2004 September 2004 Monthly Operating Report for Nine Mile Point Unit 1 & Unit 2 ML0426702542004-09-0808 September 2004 August 2004 Monthly Operating Report for Nine Mile Point Unit 1 & 2 ML0423802722004-08-11011 August 2004 July 2004 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0420403172004-07-0606 July 2004 June 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0417406502004-06-0909 June 2004 May 2004 Monthly Operating Report for Nine Mile Point Units 1 & 2 ML0414602662004-05-12012 May 2004 April 2004 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0410604032004-04-0808 April 2004 March 2004 Monthly Operating Report for Nine Mile Point, Units 1 & 2 ML0407806092004-03-0808 March 2004 February 2004 Monthly Operating Report for Nine Mile Point Unit 1 and 2 ML0405503812004-02-11011 February 2004 January 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0402107342004-01-12012 January 2004 December 2003 Monthly Operating Report for Nine Mile Point, Units 1 and 2 ML0335705112003-12-10010 December 2003 November 2003 Monthly Operating Report for Nine Mile Point Units 1 and 2 ML0332503272003-11-13013 November 2003 October 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0332503292003-11-10010 November 2003 October 2003 Monthly Operating Reprt for Nine Mile Point Unit 2 ML0329701142003-10-10010 October 2003 September 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0330103602003-10-0707 October 2003 September 2003 Monthly Operating Report for Nine Mile Point, Unit 1 ML0326610802003-09-11011 September 2003 August 2003 Monthly Operating Report Nine Mile Point Unit 2 ML0326600272003-09-0909 September 2003 August 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0323304142003-08-12012 August 2003 July 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0323202902003-08-0707 August 2003 July 2003 Monthly Operating Report for Nine Mile Point, Unit 2 ML0320400322003-07-0808 July 2003 June 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0320400302003-07-0808 July 2003 June 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0317505882003-06-12012 June 2003 May 2003 Monthly Operating Report for Nine Mile Point, Unit 1 ML0317505872003-06-11011 June 2003 May 2003 Monthly Operating Report for Nine Mile Point, Unit 2 ML0314204912003-05-12012 May 2003 April 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0311300102003-04-0909 April 2003 March 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0311300082003-04-0909 April 2003 March 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0308605002003-03-13013 March 2003 February 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0308605052003-03-12012 March 2003 February 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0305604912003-02-12012 February 2003 January 2003 Monthly Operating Report for Nine Mile Point Unit 1 ML0305605962003-02-10010 February 2003 January 2003 Monthly Operating Report for Nine Mile Point Unit 2 ML0302307132003-01-10010 January 2003 December 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0302307102003-01-10010 January 2003 December 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0236003192002-12-12012 December 2002 November 2002 Monthly Operating Report for Nine Mile Point, Unit 1 ML0236002952002-12-0505 December 2002 November 2002 Monthly Operating Report for Nine Mile Point, Unit 2 ML0232404532002-11-0808 November 2002 October 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0233101182002-11-0707 November 2002 October 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0229603412002-10-0909 October 2002 September 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0229603452002-10-0707 October 2002 September 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0226900422002-09-12012 September 2002 August 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0226900512002-09-0606 September 2002 August 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0223800522002-08-0909 August 2002 July 2002 Monthly Operating Report for Nine Mile Point Unit 1 ML0223800322002-08-0606 August 2002 July 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0221202032002-07-17017 July 2002 June 2002 Monthly Operating Report for Nine Mile Point Unit 2 ML0221201772002-07-15015 July 2002 June 2002 Monthly Operating Report for Nine Mile Point Unit 1 2005-04-06
[Table view] |
Text
P.O. Box 63 Lycoming, New York 13093 Constellation I Energy Group.
Nine Mile Point December 10, 2003 Nuclear Station NMP1L 1801 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Nine Mile Point Unit I Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 Monthly Operating Report for November 2003 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for November 2003 for the Nine Mile Point Nuclear Station Unit I and Unit 2.
Very truly yours, Lawrence A. Hopkins Plant General Manager LAH/BE/TM/jm Attachments cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector 11VA
-V
ATTACHMENT A DOCKET NO. 50410 OPERATING DATA REPORT DATE: 12/02/2003 COMPLETED BY: T. P. McMahon TELEPHONE: (315) 349-4045 OPERATING STATUS I
Unit Name: Nine Mile Point Unit #2 Reporting Period: November 2003
- 1. Design Electrical Rating (MWe) 1,143.3
- 2. Maximum Dependable Capacity (Net MWe) 1,119.8 This Month Yr-to-Date Cumulative
- 3. Number of Hours Reactor was Critical: 720.0 7,732.0 110,515.0
- 4. I1ours Generator On-Line: 720.0 d 7,704.6 107,560.9
- 5. Reactor Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Gen. (MWH) 826,565.5 8,723,578.7 113,199,415.2
UNIT SHUTDOWNS DOCKET NO: 50-410 UNIT NAME: NMP#2 ATTACHMENT B DATE: 12/02/03 REPORTING PERIOD - NOVEMBER 2003 Prepared by: T. McMahon TELEPHONE: (315) 3494045 Duration Method of Cause &Corrective Actions No. Date Type (Hours) Reasons' Shutting Down' Comments F:Forced S: Scheduled
--NONE--
Reason: Method:
A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automadc Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training &License Exam 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50410 UNIT NAME: NMP#2 DATE: 11/2/03 PREPARED BY: T. McMahon TELEPHONE: (315) 3494045 Nine Mile Point Unit Two operated with a capacity factor (MDC) of 102.52% and an availability factor of 100% for the month of November, 2003.
On November 22, 2003 at 0802 hours0.00928 days <br />0.223 hours <br />0.00133 weeks <br />3.05161e-4 months <br /> Operations commenced lowering power to approximately 55% for a planned feed water pump swap. After completion of the feed water pump swap, full power was restored at 0603hours on November 23, 2003.
There were no challenges to the safety relief valves during this reporting period.
AT[ACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 12/03/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: November 2003 2 Design Electrical Rating: (Net MWe) 613 2 Maximum Dependable Capacity: (Net MWe) 565 This Month Yr-to-Date Cumulative 3 Critical Hours 720.0 6,800.8 212,087.6 4 Hours Generator On-Line 720.0 6,631.4 207,493.7 5 Unit Reserve Shutdown Hours 0.0 0.0 20.4 6 Net Electrical Energy Generated (MWH) 397,984.0 3,903,057.0 115,838,438.0
ATTACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - NOVEMBER 2003 DOCKET NO: 50-220 UNIT NAME: NMPI DATE: 12/03/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 TYPE NO.* DATE F: FORCED DURATION REASONS' METHOD OF SHUTTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS) DOWN2 COMMENTS No shutdowns occurred in November 2003 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual
- 1. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation
- e. Operator Training/License Examination 5. Other (Explain)
F. Administrative
- 0. Operational Error (Explain)
H. Other (Explain)
- NOTE: Sequential numbering used.
ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMPI DATE: 12/03/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 The unit operated during the month of November 2003 with a Net Electrical Design capacity factor of 90.2 percent.
On November 13, 2003 at 2149 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.176945e-4 months <br />, Line 4 (115kv) was momentarily lost causing Reactor Recirculation Pump #13 to trip; thus reducing power to approximately 80 percent. This placed the unit in 3-loop operation. Reactor Recirculation Pump #13 was returned to service on November 14, 2003 at 1336 hours0.0155 days <br />0.371 hours <br />0.00221 weeks <br />5.08348e-4 months <br /> and power was returned to rated.
On November 15, 2003 at 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, power was reduced to 65 percent to scram time a select number of control rods. Power was maintained at approximately 65 percent while maintenance/scram timing was performed on the Hydraulic Control Units. Maintenance/scram timing was completed on November 22, 2003 and power was returned to rated at 1637 on the same day.
On November 23, 2003 at 0959 hours0.0111 days <br />0.266 hours <br />0.00159 weeks <br />3.648995e-4 months <br />, power was reduced to 80 percent to set the target rod pattern. The unit was returned to 100 percent power at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> later that day.