P.O. Box 63 Lycoming, New York 13093 I

Constellation Energy Group Nine Mile Point Nudear Station September 9, 2003

-NMPIL 1761 U. S. Nuclear Regulatory Commission Attn: Document Control Desk X

Washington, DC 20555

SUBJECT:

Nine Mile Point Unit I Docket No. 50-220 License No. DPR-63 Monthly Operating Report for August 2003 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for August 2003 for the Nine Mile Point Nuclear Station Unit 1.

Submittal of this information complies with Section 6.6.4 of the Unit 1 Technical Specifications.

Very truly yours, Lawrence A. Hopkins Plant General Manager LAHIBE/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

/01

ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 9-4-03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: August 2003 1

Design Electrical Rating: (Net MWe) 2 Maximum Dependable Capacity: (Net MWe) 613 565 3

Critical Hours 4

Hours Generator On-Line 5

Unit Reserve Shutdown Hours 6

Net Electrical Energy Generated (MWH)

This Month 669.9 638.1 0.0 369,733.0 Yr-to-Date 4,615.8 4,446.4 0.0 2,632,269.0 Cumulative

- 209,902.6 205,308.7 20.4 114,567,650.0

ATIACHMENT B UNrr SHUIDOWNS REPORTING PERIOD - AUGUST 2003 DOCKET NO: 50-220 UNIT NAME: NMPI DATE: 9/04/03 PREPARED BY: B. L.

Eastman TELEPHONE: (315) 349-2559 TYPE NO.*

DATE F:FORCED DURATION REASONS' METHOD OF SHUTrING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS)

DOWN 2 COMMENTS 6

030814 F

105.9 H

3 REACTORSCRAM DUETOREACTOR PROTECTIVE SYTEM TURBINE TRIP (LOAD REJECT/OFFSITE GRID INSTABILITY)

(I)

Reason A.

Equipment Faihre (Explain)

.B.

Maintenance or Test C

Refueling D.

Regulatory Restriction E

Operator Training/license Examination P.

Administrative G.

Operational Emr (Explain)

H.

Other (Explain)

  • NOTE. Sequential numbering used (2)

Meod 1.

2.

3.

4.

5.

Manual Manual Thip/Scram Automatic Trip/Scram Continuation Other (Explain)

ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 94/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 The unit operated during the month of August 2003 with a Net Electrical Design capacity factor of 81.1 percent.

On August 9, 2003 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> power was reduced to approximately 75% to perform a Control Rod Sequence Exchange. The plant was returned to full power operation at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the same day.

On August 14, 2003 at 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> the unit automatically scrammed due to Reactor Protective System Turbine Trip (Load Reject/Northeast Blackout). The unit was returned to service at 0208 hours0.00241 days <br />0.0578 hours <br />3.439153e-4 weeks <br />7.9144e-5 months <br /> on August 19, 2003. Full power operation was achieved at 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> on the same day.

On August 21, 2003 at 1135 hours0.0131 days <br />0.315 hours <br />0.00188 weeks <br />4.318675e-4 months <br /> power was reduced to 82.9% to set target control rod pattern and start #13 Reactor Recirculation Pump. At 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br /> on the same day, the unit was returned to full power.