R.O. Box 63 Lycoming, New York 13093 Constellation Nuclear Nine Mile Point Nuclear Station October 7, 2003 NMP1L 1779 A M~ember of the Constellation Energy Group U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Nine Mile Point Unit 1 Docket No. 50-220 License No. DPR-63 Monthly Operating Report for September 2003 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for September 2003 for the Nine Mile Point Nuclear Station Unit
- 1. Submittal of this information complies with Section 6.6.4 of the Unit 1 Technical Specifications.
Very truly yours, Lawrence A. Hopkins Plant General Manager LAHJBE/jm Attachments cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector
ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 10-02-03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: September 2003 1
2 Design Electrical Rating: (Net MWe)
Maximum Dependable Capacity: (Net MWe) 613 565 3
4 5
6 Critical Hours Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720.0 720.0 0.0 433,998.0 Yr-to-Date 5,335.8 5,166.4 0.0 3,066,267.0 Cumulative 210,622.6 206,028.7 20.4 115,001,648.0
ATTACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - SEPTEMBER 2003 DOCKET NO: 50-220 UNIT NAME: NMPI DATE: 10/02/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 TYPE NO.*
DATE F. FORCED DURATION REASONS' METHOD OF SHUTTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS)
DOWN2 COMMENTS No shutdowns occurred in September 2003 (1)
Reason A.
Equipment Failure (Explain)
B.
Maintenance or Test C.
Refueling D.
Regulatory Restriction E.
Operator TrainingtUcense Examination P.
Administrative G.
Operational Error (Explain)
H.
Other (Explain)
- NOTE: Sequential numbering used.
(2)
Method
- 1.
Manual
- 2.
Manual Trip/Scram
- 3.
Automatic Trip/Scram
- 4.
Continuation
- 5.
Other (Explain)
ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 10/02/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 The unit operated during the month of September 2003 with a Net Electrical Design capacity factor of 98.3 percent.