P.O. Box 63 Lycoming, New York 13093 Cellafin FndGroup Nine Mile PoInt August 12, 2003 Nudear Station NMP1L 1755 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Nine Mile Point UnitI -
-f7
_,Docket No50-22 License No. DPR-63 Monthly Operating Report for July 2003 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for July 2003 for the Nine Mile Point Nuclear Station Unit 1.
Submittal of this information complies with Section 6.6.4 of the Unit 1 Technical Specifications.
Very truly yours, 0 Lawrence A.-Hopkins Plant General Manager LAHIBE/bjh 7AiXi=1_ _
, ts
=
-}_=_
cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector
ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 8/04/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: July 2003 1
Design Electrical Rating: (Net MWe) 2 Maximum Dependable Capacity: (Net MWe) 613 565 3
Critical Hours 4
Hours Generator On-Line 5
Unit Reserve Shutdown Hours 6
Net Electrical Energy Generated (MWH)
This Month 744.0 744.0 0.0 439,351.0 Yr-to-Date 3,945.9 3,808.3 0.0 2,262,536.0 Cumulative 209,232.7 204,670.6 20.4 114,197,917.0
ATIACHMENT B I
UNIT SHUTDOWNS REPORTING PERIOD - JULY 2003 DOCKET NO: 50-220 UNITNAME: NmpX DATE: 8/04103 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 TYPE DlI NO.*
DATE F: FORCED DIATION REASONS1 METHOD OFSHUTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED H DURS DOWN2 COMMETS I
N ST W
C RD (1)
Reason A.
Equipment Failure (Explain)
B.
Maintenance or Test C
Refueling D.
Regulatowy Restriction B.
Operator Thiningliccnse Examinatic F.
Administrative G.
Operational Error (Explain)
H.
Other (Explain)
- NarE: Sequential numbering used.
(2)
Method 1.
2.
3.
4.
5.
Manual Manual iiipScram Autornati Tnip/Scral Continua on Other
,ulain)
I
ATrACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 8/04/03 PREPARED BY: B. L. Eastman TELEPHONE: (315) 349-2559 The unit operated during the month of July 2003 with a Net Electrical Design capacity factor of 96.3 percent.
At 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> on July 2, 2003, an unplanned power reduction to approximately 82% occurred due to a trip of Reactor Recirculation Pump 14. Reactor Recirculation Pump 14 was returned to service at 2329 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.861845e-4 months <br /> on July 3, 2003, with full power operation resumed by 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> July