Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501
ML23290A029
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/17/2023
From: Daniel Schroeder
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023501
Download: ML23290A029 (1)


Text

October 17, 2023

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000220/2023501 AND 05000410/2023501

Dear David Rhoades:

On October 5, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station and discussed the results of this inspection with Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000220 and 05000410 License Nos. DPR-63 and NPF-69

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000220 and 05000410

License Numbers:

DPR-63 and NPF-69

Report Numbers:

05000220/2023501 and 05000410/2023501

Enterprise Identifier: I-2023-501-0003

Licensee:

Constellation Energy Generation, LLC

Facility:

Nine Mile Point Nuclear Station

Location:

Oswego, NY

Inspection Dates:

October 2, 2023 to October 5, 2023

Inspectors:

J. DeBoer, Senior Emergency Preparedness Inspector

B. Fuller, Senior Operations Engineer

J. Lilliendahl, Senior Emergency Response Coord

S. Mercurio, Emergency Preparedness Inspector

J. Rady, Senior Reactor Inspector

Approved By:

Daniel L. Schroeder, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Nine Mile Point Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated a seismic event which caused a loss of power, a line break inside of containment, and an Anticipated Transient Without Scram (ATWS) but alternate rod insertion was successful in shutting down the reactor for Unit 1 on October 3, 2023.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.
  • Q 22-47 - EP-AA-1013, Addendum 2, Nine Mile Point Station Units 1 and 2 Evacuation Time Estimates, Revision 2
  • Q 22-47 - EP-AA-1013, Addendum 2 JAF Nuclear Power Plant Evacuation Time Estimates, Revision 1

This evaluation does not constitute NRC approval.

71114.08 - Exercise Evaluation - Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on August 24,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) July 1, 2022 through June 30, 2023

EP02: Emergency Response Organization Drill Participation (IP Section 02.13) (1 Sample)

(1) July 1, 2022 through June 30, 2023

EP03: Alert and Notification System Reliability (IP Section 02.14) (1 Sample)

(1) July 1, 2022 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 5, 2023, the inspectors presented the emergency preparedness biennial exercise inspection results to Peter Orphanos, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

Resulting from

Inspection

AR 04707254

Procedures

EP-AA-1000

Exelon Nuclear Standardized Radiological Emergency Plan

Revision 33

EP-AA-1013

Radiological Emergency Plan Annex for Nine Mile Point

Station

Revision 9

71114.04

Procedures

Q 22-47

EP-AA-1013, Addendum 2, NMP Stations Unit 1 and 2

Evacuation Time Estimates

Revision 2

Q 22-47

EP-AA-1013, Addendum 2 JAF Nuclear Power Plant

Evacuation Time Estimates

Revision 1

Q 22-59

EP-AA-1013, Radiological Emergency Plan Annex for Nine

Mile Point Station

Revision 9