January 2005 Monthly Operating Report for Nine Mile Point Units 1 and 2
ML050610027
Person / Time
Site: Nine Mile Point  
Issue date: 02/10/2005
From: O'Connor T
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMPIL 1924
Download: ML050610027 (3)


Text

Constellation Nuclear February 10, 2005 NMPIL 1924 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Unit 1 Docket No. 50-220 License No. DPR-63 Nine Mile Point Unit 2 Docket No. 50-410 License No. NPF-69 Monthly Operating Report for January 2005 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for January 2005 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

TJO/TM/sac Attachments cc:

Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

-2,1

U1 OPERATING DATA REPORT DOCKET NO.

50-220 UNIT NAME Nine Mile Point I DATE February 03, 2005 COMPLETED BY Bruce L Eastman TELEPHONE 315 349 2559 REPORTING PERIOD:

January 2005 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 613.00 565.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00-744.00 0.00 459,862.00 Yr-to-Date 744.00 744.00 0.00 459,862.00 Cumulative 221,906.92 217,241.97 20.40 121,744,827.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of January 2005 with a Net Electrical Design capacity factor of 100.8 percent.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 2

A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-410 Nine Mile Polnt 2 February 07, 2005 Thomas P. McMahon 3151349-4045 January 2005

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,143.30 1,119.80 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 858,901.00 Yr-to-Date 744.00 744.00 0.00 858,901.00 Cumulative 119,834.72 116,837.82 0.00 123,545,083.6 UNIT SHUTDOWNS Type Method of F: Forced Duration s

hutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 103.09% and an availability factor of 100% for the month of January 2005.

On January 15 2005 at 0801 hours0.00927 days <br />0.223 hours <br />0.00132 weeks <br />3.047805e-4 months <br />, Operations commenced a downpower to approximately 55% power for a feed pump swap. After completion of this feed pump swap, the unit was returned to full power at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br /> the same day. There were no challenges to the safety relief valves during this reporting period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 2 of 2