ML050040309
| ML050040309 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point (DPR-063, NPF-069) |
| Issue date: | 12/14/2004 |
| From: | O'Connor T Constellation Energy Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMPIL 1895 | |
| Download: ML050040309 (3) | |
Text
Constellation Energy Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, New York 13093 December 14, 2004 NMP1L 1895 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Nine Mile Point Unit 1 Nine Mile Point Unit 2 Db-Docket No. 50-220-DI6cketNoT 50410 0 License No. DPR-63 License No. NPF-69 Monthly Operating Report for November 2004 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for November 2004 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.
Very tply yours imo O'Connor Pla eneral Manager TO/Tfjm Attachments
. 1, 1 i i;.
- :: l@! r:
- J.:".............
-cc:
Mr. S. J. Collins, NRC Regional Administriato, RegionlI Mr. G. K. Hunegs, NRC Senior Resident Inspector
.~.
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-220 Nine Mile Point 1 December 02,2004 Bruce L Eastman.
315-349-2559 November 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 613.00 565.00
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6.
Net Electrical EnergypGenerated (MWHrs)
This Month Yr-to-Date Cumulative 720.00 7,587.32 220,418.92 720.00 7,516.27 215,753.97 0.00 0.00 20.40
_444,110.00 _- 4,528,590.00.- 120,825,345.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The unit operated during the month of November 2004 with a Net Electrical Design capacity factor of 100.6 percent.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 2
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50410 Nine Mile Point 2 December 02, 2004
- 1.. mcManon 315-349-4045 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,143.30 1 119.80
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours 6.. Net Electrical Energy Generated (MWHrs)--
This Month Yr-to-Date Cumulative 720.00 7,087.72 118,346.72 720.00 7,044.92 115,349.82 0.00 0.00 0.00 829,437.61 -
7.814 363.53 121,857,068.2_
UNIT SHUTDOWNS Type Method of F: Forced Duration Resn Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours) eason I Down 2 Comments
SUMMARY
- Nine Mile Point Unit Two operated with a maximum dependable capacity (MDC) factor of 102.88% and an availability factor of 100% for the month of November, 2004. There were no challenges to the safety relief valves during this reporting period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
-7