November 2004 Monthly Operating Report for Nine Mile Point, Units 1 and 2
ML050040309
Person / Time
Site: Nine Mile Point  
(DPR-063, NPF-069)
Issue date: 12/14/2004
From: O'Connor T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMPIL 1895
Download: ML050040309 (3)


Text

Constellation Energy Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, New York 13093 December 14, 2004 NMP1L 1895 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Nine Mile Point Unit 1 Nine Mile Point Unit 2 Db-Docket No. 50-220-DI6cketNoT 50410 0 License No. DPR-63 License No. NPF-69 Monthly Operating Report for November 2004 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for November 2004 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

Very tply yours imo O'Connor Pla eneral Manager TO/Tfjm Attachments

. 1, 1 i i;.

- :: l@! r:

J.:".............

-cc:

Mr. S. J. Collins, NRC Regional Administriato, RegionlI Mr. G. K. Hunegs, NRC Senior Resident Inspector

.~.

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-220 Nine Mile Point 1 December 02,2004 Bruce L Eastman.

315-349-2559 November 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 613.00 565.00

3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6.

Net Electrical EnergypGenerated (MWHrs)

This Month Yr-to-Date Cumulative 720.00 7,587.32 220,418.92 720.00 7,516.27 215,753.97 0.00 0.00 20.40

_444,110.00 _- 4,528,590.00.- 120,825,345.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of November 2004 with a Net Electrical Design capacity factor of 100.6 percent.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 2

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50410 Nine Mile Point 2 December 02, 2004

1.. mcManon 315-349-4045 November 2004
1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,143.30 1 119.80

3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5.

Reserve Shutdown Hours 6.. Net Electrical Energy Generated (MWHrs)--

This Month Yr-to-Date Cumulative 720.00 7,087.72 118,346.72 720.00 7,044.92 115,349.82 0.00 0.00 0.00 829,437.61 -

7.814 363.53 121,857,068.2_

UNIT SHUTDOWNS Type Method of F: Forced Duration Resn Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) eason I Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a maximum dependable capacity (MDC) factor of 102.88% and an availability factor of 100% for the month of November, 2004. There were no challenges to the safety relief valves during this reporting period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

-7 

Page 2 of 2